Professional Documents
Culture Documents
A. M&E STRATEGIES
ACCESS
ACCOUNTABLE
STRATEGIES OUTPUT INDICATORS M&E
PERSON
QUALITY
ACCOUNTABLE
STRATEGIES OUTPUT INDICATORS M&E
PERSON
Project BRIDGE Phil-IRI, EGRA, Results 1. Assessing learners reading Principal
Balanced Records of Most/Least level using EGRA and Phil- Teachers
Reading Interventions to Learned Competencies IRI. Parents
Deal with in English, Filipino 2. Analyzing and interpreting
Gap in results
Progress Report
Education 3. Categorizing learners based
Individual Learning on their reading level.
Monitoring Plan 4. Orienting parents about the
Activity Completion reading program to be
Report conducted.
5. Procuring the needed
1
10537
Santa Rosa National
High School
materials.
6. Implementing Project
BRIDGE.
a. LOVE-Literacy
Orientation and
Vocabulary
Enhancement.
b. ML- Mobile Language
c. Readership-Reading in
partnership with Parents
d. Peer Group Reading
e. Story telling
7. Monitoring and evaluation
Project SSEP Records of Most/Least 1. Assessing Science Process Principal
(Science Learned Competencies Skills Teachers,
Skills in Science 2. Competency Mapping of Parents
Enhancement Program) Progress Report Assessment Results
Individual Learning 3. Providing materials for the
Monitoring Plan program.
Activity Completion 4. Giving Weekly Science Text
Report Cards for Grades 3&4
5. Using MAG (Mini-Outdoor
Activity Guide) Book for
Grades 5&6
Project OLD Math Project All Numerates 1. Administering Project All- School Head
(Overcoming Learning Results Numerates (PAN) Pre-Post Teacher
Difficulties in Records of Most/Least Test Parents
Math) Learned Competencies 2. Determining the least /most
in Math learned competencies
Progress Report 3. Regular window cards
exercises under time
Individual Learning
pressure
Monitoring Plan
4. Conducting flashcards drill in
Activity Completion
pairs
Report
5.Implementing Project APAD
(A Problem A Day) and
APAW (A Problem A Week)
6.Engaging learners to
WP@E2F-VV (Translating
Word Problem in English to
Filipino and Vice Versa)
7.Implementing U&I: Working
Together (Peer mentoring
and collaborating in solving
word problem)
8. Solving word problem using
models, illustrations and
diagrams.
9.Unlocking of unfamiliar words
used in word problems
10. Introducing the 4 E’s of
Math
(Engage, Explore, Explain
2
10537
Santa Rosa National
High School
and Evaluate)
11.Giving Word Hunt Exercises
of Word Clues/Hints used in
word problems
12. Providing activity sheets
and performance tasks
13. Once a week Math Trail
activity
14. Exploring the Math Garden
15. Implementing Math through
Art Project
Project SIS.COM Annual/Monthly 1. Orienting teachers on the School Head
Strengthening Instructional indicators of the COT. Teachers
Instructional Supervisory Plan 2. Preparing schedule for class
Supervision COT Rating Sheet observation.
through Accomplishment 3. Monitoring teachers’ delivery
Coaching, Report on of instruction through class
Observation and Checking of DLL, DLP observation, and checking
Mentoring of DLL, DLP
Performance Monitoring
4. Providing technical
and Coaching Form
assistance to teachers.
Certificate of
5. Recognizing teachers who
Recognition
have shown exemplary
Activity Completion performance at the end of
Report every quarter
Project CRAFT Inventory of Learning 1. Checking and inventory of Principal
Contextualizing Resources learning materials Teachers
Resources Inventory of Reusable 2. Contextualizing learning
Appropriate for LAS materials considering the
Teaching Quality Assured KSA of learners and the
IMs/Assessment tools implementation of academic
ease.
3. Providing of technical
assistance in the
contextualization,
indigenization and
innovation of learning
materials.
4. Printing of the quality
assured learning materials.
Project ESIP Mapping of learning 1. Assessing learners’ School Head
Enhanced competencies by performance. Teachers
Strategies to learning areas 2. Analyzing test results. Parents
Improve Quality assured periodic 3. Developing Intervention
Performance test in all learning areas Program for Least Mastered
Test results Competencies and
List of Most/Least Enrichment Program for
Learned Competencies Most Learned
Intervention Programs Competencies.
M and E Report 4. Providing technical
assistance
5. Monitoring and evaluation
Project HEART Human Resource 1. Planning Principal,
Honing and - Consolidating results of LAC Focal Person
3
10537
Santa Rosa National
High School
4
10537
Santa Rosa National
High School
activities
c. Love of Nature
•YES-O
d. Love of Family
•Family Day
2. Accomplishing Activity
Completion Report.
5
10537
Santa Rosa National
High School
6
10537
Santa Rosa National
High School
GOVERNANCE
STRATEGIES OUTPUT INDICATORS M&E ACCOUNTABLE
7
10537
Santa Rosa National
High School
PERSON
Project SES Inventory of 1. Conducting inventory of Principal
CARES classrooms/facilities/buildi classrooms and facilities Property Officer
Sustaining ngs that need repair/ BAC Members
Enchanting and Approved Letter enhancement. Teachers
Safe Environment 2. Preparing program of PTA Officers
Requests
through works. LGU Barangay
Creation Approved Program of 3. Allocating budget from
Accumulation Works possible resources.
Restoration and Liquidation Report 4. Preparing Purchase
Enhancement of Request.
School Facilities 5. Conducting meetings with
BAC members.
6. Procuring
supplies/equipment/
materials.
7.Implementing the project.
8. Monitoring and evaluation.
Request Letter 1. Identifying possible sources Principal
Resolutions for the construction of Teachers
school building. Parents
2. Preparing and submitting
request letters/resolutions
to the potential sources.
3. Making follow-ups.
Approved APP 1. Conducting inventory of Principal
Program of Works needed materials/ BAC Members
Purchase Request supplies. Teachers
2. Preparing APP.
Liquidation Report
3. Preparing program of
Activity Completion works.
Report 4. Allocating budget from
possible resources.
5. Preparing Purchase
Request.
6. Conducting meetings with
BAC members.
7. Procuring supplies/
equipment/materials.
8. Liquidating used fund.
Request Letter 1. Conducting inspection on Principal
Activity Completion building by the school School Property
Report property custodian. Custodian
2. Preparing and submitting LGU
request letter for school
inspection to the municipal
engineering office, DILG
and Bureau of Fire
Protection.
3. Complying with the
findings if any.
4. Securing certificate of
compliance.
8
10537
Santa Rosa National
High School
9
10537
Santa Rosa National
High School
10