NOTICE TO PROCEED 005

PHASE III EXPANSION: METAL TECHNOLOGIES®

DESCRIPTION
This is a confirmation of the verbal approval given to VICSA on July 11st, 2022, during the
foundation preparation inspection. The rebar assembly, rebar and formwork levels complies
with drawing specifications and measurements. Proceed with the concrete pouring on
foundations Z-01 of column line B axes 19-32 as marked on the drawing below.

Figure 1. Foundation floor plan

Photograph 1. Rebar assembly, footing level and trace inspection.


Figure 2. Foundation template detail.

The pedestals and anchors assembly complies with drawing specifications and measurements.
They are aceptable and inside the standars.
The pedestals and anchors assembly from de axes 33-38 and 40 is cleared to proceed with their
collocation on site.

Notice to Ptoceed 005


Phase III Expansion | Metal Technologies®
General Contractor: Constructora Vidal S.A. de C.V.
Revisión 00
1 de 2
¡Error! No se encuentra el origen de la referencia.. Foundation floor plan

Figure 4. AN-01 detail.

Photograph 2. Pedestals and anchors inspection.

EDUARDO VELARDE LOBATÓN ALDO IVÁN GARCÍA OCAÑA


GT-CONSULTING® GT-CONSULTING®
PROJECT SUPERVISOR PM & ASSET INSPECTOR
evelarde@gtconsulting.mx aldogarcia@gtconsulting.mx

Notice to Ptoceed 005


Phase III Expansion | Metal Technologies®
General Contractor: Constructora Vidal S.A. de C.V.
Revisión 00
2 de 2