Site Test Report

Contract No. – N-6166.1


CONSORTIUM
New 132/11KV Substations at E12,Zayed Sports SIEMENS
City, ADNEC Capital Centre, 132/22kv ELECTROMECHANICAL
Substations at New Airport and Capital District
and All Related 132kv Cable works

Substation ADNEC Capital Centre


Bay /Feeder =E02 Transformer Feeder 1 Page 1 of 6

High Voltage Switchgear Type 8DN8 - 132kVInterlocking Test


Release Circuit Breaker Q0 Close
Trip Circuit-1 healthy

NO SF6 LOCK OUT

11KV SWG=K10

O&C Checked
11L+ interlocking.

Spring charge

NER & NES3)


control release 2)

NO LOCK

Release
Trip Circuit-2

OUT

Q1

Q2

Q9

Q0
BCU/MIMIC

Voltage 4)

healthy

BCU YES YES YES YES YES YES YES CLOSED OPEN CLOSED CLOSED OPEN YES OK
BCU YES YES YES YES YES YES YES OPEN OPEN CLOSED CLOSED OPEN NO OK
BCU YES YES YES YES YES YES YES INTER.P OPEN CLOSED CLOSED OPEN NO OK
BCU YES YES YES YES YES YES YES CLOSED OPEN OPEN CLOSED OPEN NO OK
BCU YES YES YES YES YES YES YES CLOSED OPEN INTER.P CLOSED OPEN NO OK
BCU YES YES YES YES YES YES YES OPEN CLOSED CLOSED CLOSED OPEN YES OK
BCU YES YES YES YES YES YES YES OPEN OPEN CLOSED CLOSED OPEN NO OK
BCU YES YES YES YES YES YES YES OPEN INTER.P CLOSED CLOSED OPEN NO OK
BCU YES YES YES YES YES YES YES OPEN CLOSED OPEN CLOSED OPEN NO OK
BCU YES YES YES YES YES YES YES OPEN CLOSED INTER.P CLOSED OPEN NO OK
BCU NO YES YES YES YES YES YES CLOSED OPEN CLOSED CLOSED OPEN NO OK
BCU YES NO YES YES YES YES YES CLOSED OPEN CLOSED CLOSED OPEN NO OK
BCU YES YES NO YES YES YES YES CLOSED OPEN CLOSED CLOSED OPEN NO OK
BCU YES YES YES NO YES YES YES CLOSED OPEN CLOSED CLOSED OPEN NO OK
BCU YES YES YES YES NO YES YES CLOSED OPEN CLOSED CLOSED OPEN NO OK
BCU YES YES YES YES YES YES YES CLOSED OPEN CLOSED OPEN OPEN NO OK
BCU YES YES YES YES YES YES YES OPEN CLOSED CLOSED CLOSED CLOSED NO OK
BCU YES YES YES YES YES YES YES OPEN OPEN OPEN - - YES OK
BCU YES YES YES YES YES NO YES OPEN OPEN OPEN - - NO OK
MIMIC YES YES YES YES YES YES YES OPEN OPEN OPEN - - NO OK
BCU YES YES YES YES YES YES NO OPEN OPEN OPEN - - NO OK

Remarks: 1) INTER. P: Intermediate Position


2) Control release = Double command lockout, Intermediate position Block.
3) NER OR NES (Q6 or Q7) any one in the closed condition
4) Interlocking Voltage (11L±) MCB (F141)

Release Circuit Breaker Q0 Open


NO Sf6 LOCK OUT Release Checked

TESTED BY WITNESSED BY CONSULTANT WITNESSED / APPROVED BY

Signature: Signature: Signature:

Name: Name: Name:

Date Date Date


Site Test Report
Contract No. – N-6166.1
CONSORTIUM
New 132/11KV Substations at E12,Zayed Sports SIEMENS
City, ADNEC Capital Centre, 132/22kv ELECTROMECHANICAL
Substations at New Airport and Capital District
and All Related 132kv Cable works

Substation ADNEC Capital Centre


Bay /Feeder =E02 Transformer Feeder 1 Page 2 of 6

YES YES OK
NO NO OK

Release Busbar Isolator Q1


voltage & Control
3L+ & 11L+ int.

O&C Checked
BCU/MIMIC

release 2)

Q15 Release
BBES =E06 Bus for DS &
Q0 Q2 Q51 Q52 Q53 =E06 Q9 coupler Solenoid
BCU YES OPEN OPEN OPEN OPEN OPEN OPEN − − YES OK
BCU NO OPEN OPEN OPEN OPEN OPEN OPEN − − NO OK
BCU YES CLOSED OPEN OPEN OPEN OPEN OPEN − − NO OK
BCU YES OPEN CLOSED OPEN OPEN OPEN OPEN − − NO OK
BCU YES OPEN INTER.P OPEN OPEN OPEN OPEN − − NO OK
BCU YES OPEN OPEN CLOSED OPEN OPEN OPEN − − NO OK
BCU YES OPEN OPEN INTER.P OPEN OPEN OPEN − − NO OK
BCU YES OPEN OPEN OPEN CLOSED OPEN OPEN − − NO OK
BCU YES OPEN OPEN OPEN INTER.P OPEN OPEN − − NO OK
BCU YES OPEN OPEN OPEN OPEN CLOSED OPEN - - NO OK
BCU YES OPEN OPEN OPEN OPEN INTER.P OPEN - - NO OK
BCU YES OPEN OPEN OPEN OPEN OPEN CLOSED − − NO OK
BCU YES CLOSED CLOSED − − − − CLOSED CLOSED YES OK
BCU YES OPEN CLOSED − − − − CLOSED CLOSED NO OK
BCU YES CLOSED OPEN − − − − CLOSED CLOSED NO OK
BCU YES CLOSED CLOSED − − − − OPEN CLOSED NO OK
BCU YES CLOSED CLOSED − − − − INTER.P CLOSED NO OK
BCU YES CLOSED CLOSED − − − − CLOSED OPEN NO OK
BCU YES CLOSED CLOSED − − − − CLOSED INTER.P NO OK
BCU YES − − − CLOSED − CLOSED − YES OK
MIMIC YES OPEN OPEN OPEN OPEN OPEN OPEN − − NO OK

Remarks: 1) INTER.P: Intermediate position


2) Interlocking Voltage (3L±) MCB F145 (Bus Coupler) & (11L±) MCB (F141)
Control release= Double command lockout.
Bus coupler closed: Q1 & Q2 & Q0 Closed
Bus coupler open: Q1 or Q2 or Q0 open

TESTED BY WITNESSED BY CONSULTANT WITNESSED / APPROVED BY

Signature: Signature: Signature:

Name: Name: Name:

Date Date Date


Site Test Report
Contract No. – N-6166.1
CONSORTIUM
New 132/11KV Substations at E12,Zayed Sports SIEMENS
City, ADNEC Capital Centre, 132/22kv ELECTROMECHANICAL
Substations at New Airport and Capital District
and All Related 132kv Cable works

Substation ADNEC Capital Centre


Bay /Feeder =E02 Transformer Feeder 1 Page 3 of 6

Release Busbar Isolator Q2


voltage & Control
3L+ & 11L+ int.

O&C Checked
BCU/MIMIC

release 2)

Q25 Release
BBES =E06 Bus for DS &
Q0 Q1 Q52 Q51 Q53 =E06 Q9 coupler Solenoid
BCU YES OPEN OPEN OPEN OPEN OPEN OPEN − − YES OK
BCU NO OPEN OPEN OPEN OPEN OPEN OPEN − − NO OK
BCU YES CLOSED OPEN OPEN OPEN OPEN OPEN − − NO OK
BCU YES OPEN CLOSED OPEN OPEN OPEN OPEN − − NO OK
BCU YES OPEN INTER.P OPEN OPEN OPEN OPEN − − NO OK
BCU YES OPEN OPEN CLOSED OPEN OPEN OPEN − − NO OK
BCU YES OPEN OPEN INTER.P OPEN OPEN OPEN − − NO OK
BCU YES OPEN OPEN OPEN CLOSED OPEN OPEN − − NO OK
BCU YES OPEN OPEN OPEN INTER.P OPEN OPEN − − NO OK
BCU YES OPEN OPEN OPEN OPEN CLOSED OPEN - - NO OK
BCU YES OPEN OPEN OPEN OPEN INTER.P OPEN - - NO OK
BCU YES OPEN OPEN OPEN OPEN OPEN CLOSED − − NO OK
BCU YES CLOSED CLOSED − − − − CLOSED CLOSED YES OK
BCU YES OPEN CLOSED − − − − CLOSED CLOSED NO OK
BCU YES CLOSED OPEN − − − − CLOSED CLOSED NO OK
BCU YES CLOSED CLOSED − − − − OPEN CLOSED NO OK
BCU YES CLOSED CLOSED − − − − INTER.P CLOSED NO OK
BCU YES CLOSED CLOSED − − − − CLOSED OPEN NO OK
BCU YES CLOSED CLOSED − − − − CLOSED INTER.P NO OK
BCU YES − − − CLOSED − CLOSED - − YES OK
MIMIC YES OPEN OPEN OPEN OPEN OPEN OPEN − − NO OK

Remarks: 1) INTER.P: Intermediate position


2) Interlocking Voltage (3L±) MCB F145 (Bus Coupler) & (11L±) MCB (F141)
Control release= Double command lockout.
Bus coupler closed: Q1 & Q2 & Q0 Closed
Bus coupler open: Q1 or Q2 or Q0 open

Release Line Isolator Q9


TESTED BY WITNESSED BY CONSULTANT WITNESSED / APPROVED BY

Signature: Signature: Signature:

Name: Name: Name:

Date Date Date


Site Test Report
Contract No. – N-6166.1
CONSORTIUM
New 132/11KV Substations at E12,Zayed Sports SIEMENS
City, ADNEC Capital Centre, 132/22kv ELECTROMECHANICAL
Substations at New Airport and Capital District
and All Related 132kv Cable works

Substation ADNEC Capital Centre


Bay /Feeder =E02 Transformer Feeder 1 Page 4 of 6
11L+ Int. voltage &
Control release 2)

11KV SWG =K10

O&C Checked
BCU/MIMIC

Release

Q5
Q0 Q8 Q51 Q52 Q53 for DS &
Solenoid

BCU YES OPEN OPEN OPEN OPEN OPEN OPEN YES OK


BCU NO OPEN OPEN OPEN OPEN OPEN OPEN NO OK
BCU YES CLOSED OPEN OPEN OPEN OPEN OPEN NO OK
BCU YES OPEN CLOSED OPEN OPEN OPEN OPEN NO OK
BCU YES OPEN OPEN CLOSED OPEN OPEN OPEN NO OK
BCU YES OPEN OPEN INTER.P OPEN OPEN OPEN NO OK
BCU YES OPEN OPEN OPEN CLOSED OPEN OPEN NO OK
BCU YES OPEN OPEN OPEN INTER.P OPEN OPEN NO OK
BCU YES OPEN OPEN OPEN OPEN CLOSED OPEN NO OK
BCU YES OPEN OPEN OPEN OPEN INTER.P OPEN NO OK
BCU YES OPEN OPEN OPEN OPEN OPEN CLOSED NO OK
BCU YES CLOSED CLOSED CLOSED OPEN − − YES OK
BCU YES CLOSED CLOSED OPEN CLOSED − − YES OK
BCU YES OPEN CLOSED OPEN CLOSED − − NO OK
BCU YES CLOSED OPEN OPEN CLOSED − − NO OK
MIMIC YES OPEN OPEN OPEN OPEN OPEN OPEN NO OK

Remarks: 1) INTER.P: Intermediate position


2) Interlocking Voltage (11L±) MCB (F141)
Control release= Double command lockout,

Release Maintenance Earthing Switch Q51


TESTED BY WITNESSED BY CONSULTANT WITNESSED / APPROVED BY

Signature: Signature: Signature:

Name: Name: Name:

Date Date Date


Site Test Report
Contract No. – N-6166.1
CONSORTIUM
New 132/11KV Substations at E12,Zayed Sports SIEMENS
City, ADNEC Capital Centre, 132/22kv ELECTROMECHANICAL
Substations at New Airport and Capital District
and All Related 132kv Cable works

Substation ADNEC Capital Centre


Bay /Feeder =E02 Transformer Feeder 1 Page 5 of 6

Release O&C
BCU/MIMIC S2041) 11L+ Intl. Voltage & for ES & Checked
Control release3) Q1 Q2 Q9 Solenoid
BCU YES YES OPEN OPEN OPEN YES OK
BCU NO YES OPEN OPEN OPEN NO OK
BCU YES NO OPEN OPEN OPEN NO OK
BCU YES YES CLOSED OPEN OPEN NO OK
BCU YES YES INTER.P OPEN OPEN NO OK
BCU YES YES OPEN CLOSED OPEN NO OK
BCU YES YES OPEN INTER.P OPEN NO OK
BCU YES YES OPEN OPEN CLOSED NO OK
BCU YES YES OPEN OPEN INTER.P NO OK
MIMIC NO YES OPEN OPEN OPEN NO OK

Release Maintenance Earthing Switch Q52


Release O&C
BCU/MIMIC S2041) 11L+ Intl. Voltage & for ES & Checked
Control release3) Q1 Q2 Q9 Solenoid
BCU YES YES OPEN OPEN OPEN YES OK
BCU NO YES OPEN OPEN OPEN NO OK
BCU YES NO OPEN OPEN OPEN NO OK
BCU YES YES CLOSED OPEN OPEN NO OK
BCU YES YES INTER.P OPEN OPEN NO OK
BCU YES YES OPEN CLOSED OPEN NO OK
BCU YES YES OPEN INTER.P OPEN NO OK
BCU YES YES OPEN OPEN CLOSED NO OK
BCU YES YES OPEN OPEN INTER.P NO OK
MIMIC NO YES OPEN OPEN OPEN NO OK
Remarks: 1) S204: Release Earth Switch Interlock
2) INTER.P: Intermediate position
3) Interlocking Voltage (11L±) MCB (F141)
Control release= Double command lockout,

Release Maintenance Earthing Switch Q53

TESTED BY WITNESSED BY CONSULTANT WITNESSED / APPROVED BY

Signature: Signature: Signature:

Name: Name: Name:

Date Date Date


Site Test Report
Contract No. – N-6166.1
CONSORTIUM
New 132/11KV Substations at E12,Zayed Sports SIEMENS
City, ADNEC Capital Centre, 132/22kv ELECTROMECHANICAL
Substations at New Airport and Capital District
and All Related 132kv Cable works

Substation ADNEC Capital Centre


Bay /Feeder =E02 Transformer Feeder 1 Page 6 of 6

Release O&C
BCU/MIMIC S2041) 11L+ Intl. Voltage & for ES & Checked
Control release 3) Q1 Q2 Q9 Solenoid
BCU YES YES OPEN OPEN OPEN YES OK
BCU NO YES OPEN OPEN OPEN NO OK
BCU YES NO OPEN OPEN OPEN NO OK
BCU YES YES CLOSED OPEN OPEN NO OK
BCU YES YES INTER.P OPEN OPEN NO OK
BCU YES YES OPEN CLOSED OPEN NO OK
BCU YES YES OPEN INTER.P OPEN NO OK
BCU YES YES OPEN OPEN CLOSED NO OK
BCU YES YES OPEN OPEN INTER.P NO OK
MIMIC NO YES OPEN OPEN OPEN NO OK

Release High Speed Earthing Switch Q8

11KV SWG Release O&C


BCU/MIMIC 11L+ Intl. Voltage & =K10 for ES & Checked
Control release 3) Q1 Q9 Solenoid
BCU YES OPEN OPEN YES OK
BCU NO OPEN OPEN NO OK
BCU YES OPEN CLOSED NO OK
BCU YES OPEN INTER.P NO OK
BCU YES CLOSED OPEN NO OK
MIMIC YES OPEN OPEN NO OK

Remarks: 1) S204: Release Earth Switch Interlock


2) INTER.P: Intermediate position
3) Interlocking Voltage (11L±) MCB (F141)
Control release= Double command lockout,

TESTED BY WITNESSED BY CONSULTANT WITNESSED / APPROVED BY

Signature: Signature: Signature:

Name: Name: Name:

Date Date Date