Professional Documents
Culture Documents
Column (N Mx&My)
Column (N Mx&My)
b = 100 cm
t = 300 cm
Mxu' = 146.7 mt Nu = 1297.4 ton
e = M/N = 11.30 cm
e/t = 0.038 < 0.05 Neglect Mxu
1.00
b = 300 cm
t = 100 cm
e = M/N = 0.20
e/t = 0.20 > 0.05 Don't Neglect Myu
Nu/Fcu*b*t = 0.144
Mu'/Fcu*b*t2 = 0.029
b = 100 cm
t = 300 cm
Mxu' = 49.0 mt Nu = 1902.3 ton
e = M/N = 2.58 cm
e/t = 0.009 < 0.05 Neglect Mxu
1.00
b = 100 cm
t = 300 cm
Mxu' = 362.0 mt Nu = 1753.5 ton
e = M/N = 20.64 cm
e/t = 0.069 > 0.05 Don't Neglect Mxu
b = 300 cm
t = 100 cm
e = M/N = 0.05
e/t = 0.05 > 0.05 Don't Neglect Myu
Nu/Fcu*b*t = 0.195
Mu'/Fcu*b*t2 = 0.010
b = 100 cm
t = 300 cm
Mxu' = 441.7 mt Nu = 1078.2 ton
e = M/N = 40.97 cm
e/t = 0.137 > 0.05 Don't Neglect Mxu
b = 300 cm
t = 100 cm
e = M/N = 0.23
e/t = 0.23 > 0.05 Don't Neglect Myu
Nu/Fcu*b*t = 0.120
Mu'/Fcu*b*t2 = 0.027
b = 100 cm
t = 300 cm
Mxu' = 2438.9 mt Nu = 1457.6 ton
e = M/N = 167.33 cm
e/t = 0.558 > 0.05 Don't Neglect Mxu
b = 300 cm
t = 100 cm
e = M/N = 0.82
e/t = 0.82 > 0.05 Don't Neglect Myu
Nu/Fcu*b*t = 0.162
Mu'/Fcu*b*t2 = 0.132
b = 100 cm
t = 300 cm
Mxu' = 1905.2 mt Nu = 1353.3 ton
e = M/N = 140.78 cm
e/t = 0.469 > 0.05 Don't Neglect Mxu
Designed By: Eng. Shereen Ibrahim Checked by :Dr. Eng. Hesham Arafat
Nile Engineering Consultant Office Project : Wasta Bridge Over The Nile
(N.E.C.B) Railway Bridge _(W1-W5)
b = 300 cm
t = 100 cm
e = M/N = 1.01
e/t = 1.01 > 0.05 Don't Neglect Myu
Nu/Fcu*b*t = 0.150
Mu'/Fcu*b*t2 = 0.151
Designed By: Eng. Shereen Ibrahim Checked by :Dr. Eng. Hesham Arafat
Nile Engineering Consultant Office Project :Wasta Bridge Over The Nile
(N.E.C.B) Railway Bridge_(W1-W5)
b = 100 cm
t = 300 cm
Mxu' = 1090.2 mt Nu = 1189.4 ton
e = M/N = 91.66 cm
e/t = 0.306 > 0.05 Don't Neglect Mxu
Designed By: Eng. Shereen Ibrahim Checked by :Dr. Eng. Hesham Arafat
Nile Engineering Consultant Office Project :Wasta Bridge Over The Nile
(N.E.C.B) Railway Bridge_(W1-W5)
b = 300 cm
t = 100 cm
e = M/N = 1.25
e/t = 1.25 > 0.05 Don't Neglect Myu
Nu/Fcu*b*t = 0.132
Mu'/Fcu*b*t2 = 0.165
Designed By: Eng. Shereen Ibrahim Checked by :Dr. Eng. Hesham Arafat
Nile Engineering Consultant Office Project :Wasta Bridge Over The Nile
(N.E.C.B) Railway Bridge_(W1-W5)
b = 100 cm
t = 200 cm
Mxu' = 702.7 mt Nu = 1344.7 ton
e = M/N = 52.26 cm
e/t = 0.261 > 0.05 Don't Neglect Mxu
b = 200 cm
t = 100 cm
e = M/N = 0.61
e/t = 0.61 > 0.05 Don't Neglect Myu
Nu/Fcu*b*t = 0.224
Mu'/Fcu*b*t2 = 0.136
b = 100 cm
t = 200 cm
Mxu' = 348.4 mt Nu = 967.8 ton
e = M/N = 35.99 cm
e/t = 0.180 > 0.05 Don't Neglect Mxu
b = 200 cm
t = 100 cm
e = M/N = 0.09
e/t = 0.09 > 0.05 Don't Neglect Myu
Nu/Fcu*b*t = 0.161
Mu'/Fcu*b*t2 = 0.015
b = 100 cm
t = 300 cm
Mxu' = 1733.6 mt Nu = 1493.4 ton
e = M/N = 116.08 cm
e/t = 0.387 > 0.05 Don't Neglect Mxu
b = 300 cm
t = 100 cm
e = M/N = 0.74
e/t = 0.74 > 0.05 Don't Neglect Myu
Nu/Fcu*b*t = 0.166
Mu'/Fcu*b*t2 = 0.124