TEST CERTIFICATE OF LT BREAKER AKSHAR ELECINFRA PVT. LTD.


Client M/S. RELIANCE INDUSTRIES LTD., ASOJ Tested On 20/01/2022
Plant FIRE SUBSTATION Tested By MRUGESH
Location INCOMER‐2 Comp. Code ‐

1.0 EQUIPMENT DETAILS :


1.1 Make L&T
1.2 Breaker Sr. No. JU811368
1.3 Rated voltage 415 V
1.4 Rated current 2500 A
1.5 Model No. CN‐CS 250051
1.6 Breaking capacity 60 kA
1.7 Lightning impulse voltage 12 kV

2.0 GENERAL CHECK‐UP :


2.1 Check for physical damage if any OK
2.2 Check enclosure for cleanliness and vermin proofing OK
2.3 Check with breaker rack in from test to service position and vice‐versa. OK

3.0 MAINTENANCE AND OPERATIONAL TESTS :


3.1 Fixed contacts OK
3.2 Moving contacts OK
3.3 Jaw contact ‐ upper / lower OK
3.4 Blade contacts – upper / lower OK
3.5 Airing contacts OK
3.6 Arc chutes OK
3.7 Greasing of moving parts OK
3.8 Alignment of breaker OK

4.0 CONTROL CIRCUIT AND OPERATIONAL TESTS :


4.1 Check mechanical charging‐closing‐tripping of breaker OK
4.2 Check mechanical interlocks of breaker OK
4.3 Check electrical charging‐closing‐tripping of breaker OK

Date 20/01/2022 Date 20/01/2022 Date 28/01/2022


DILIP
Witness by RIL Witness by MRUGESH SHAH Prepared by NOEL
PARMAR
Sign Sign Sign
AKSHAR ELECINFRA PVT. LTD.
P a g e | 21

4.4 Tripping through protective relays OK


5.0 INSULATION RESISTANCE TEST OF BREAKER:
Megger Used : 500 V, Range : 0 ‐1 TΩ
BKR ON CONDITION
PHASE R‐Y Y‐B B‐R R‐N Y‐N B‐N
Values in G >1.0 G >1.0 G >1.0 G >1.0 G >1.0 G >1.0 G
PHASE R‐E Y‐E B‐E N‐E
Values in G >1.0 G >1.0 G >1.0 G >1.0 G

BKR OFF CONDITION


PHASE R‐R’ Y‐Y’ B‐B' N‐N'
Values in G >1.0 G >1.0 G >1.0 G >1.0 G

6.0 CONTACT RESISTANCE TEST OF BREAKER:


PHASE R‐R’ Y‐Y’ B‐B' N‐N'
Values in µ 26.8 µ 19.3 µ 17.9 µ 25.1 µ

7.0 OPERATING MECHANICAL TIMING TEST: (ALL VALUES IN mSec)


PHASE R Y B
CLOSE 62 64 65
OPEN 45 47 48
CLOSE‐OPEN 44 43 45

8.0 COIL RESISTANCE TEST :


CLOSING COIL (Ω) TRIPPING COIL (Ω) SPRING CHARGING MOTOR (Ω)
45.2 275 31.6

9.0 REMARKS : TESTED OK.

Date 20/01/2022 Date 20/01/2022 Date 28/01/2022


DILIP
Witness by RIL Witness by MRUGESH SHAH Prepared by NOEL
PARMAR
Sign Sign Sign
AKSHAR ELECINFRA PVT. LTD.