Cumulative Production BPD


Opening Period days
Oil (bbl) Water (bbl) Oil Water
st rd
21 February – 23 February, 2023 18 22 0 1.22 0
13th March – 15th March, 2023 21 19 1 00.95 0.05
2nd April – 5th April, 2023 21 21 1 1 0.05
20th April – 24th April, 2023 20 26 0 1.3 0
16th July – 20th July, 2023 88 40 2 0.45 0.02
7th August, 2023 18 0 0 0 0

Put on production @ 1045 hrs on 7


August, 2023 through individual
system # 2.

Well remained shut-in 1145 - 1600


(4.25) hrs, due to change of jet pump
after 802 operating days.

Operating pressure of jet pump did not


increase from 2500 psi and dropped to
2380 psi at 0600 hrs.

Well shut in at 0600 hrs as no gross


production observed for consecutive 12
hrs.