- Document8680- Abans Enguploaded by
Lakshan Fonseka
- Document0415_Master Plan for BD 1.2 & B3_v5 _EL & ES_Duploaded by
Lakshan Fonseka
- DocumentGTEC-IRE-0195 Observation Report for Witness Inspection schedule item Nr 9 on 15.09.2022_Building 2uploaded by
Lakshan Fonseka
- DocumentProcurement Scheduleuploaded by
Lakshan Fonseka
- DocumentGTEC-IRE-0059uploaded by
Lakshan Fonseka
- DocumentGTEC-IRE-0201 Observation Report for Witness Inspection Schedule Item Nr 3 & 4 on 03.10.2022_BD 2uploaded by
Lakshan Fonseka
- DocumentGTEC-IRE-0202 Observation Report for Witness Inspection schedule item Nr 5 on 04.10.2022_Building 2uploaded by
Lakshan Fonseka
- DocumentSBD-STEAM-Connection_Resources-1-Materials_engineeruploaded by
Lakshan Fonseka
- DocumentWitness inspection schedule (04th October 2022)uploaded by
Lakshan Fonseka
- DocumentSubmit 3rd Party Inspection Reports of Elevators at Building 4,5 & 6uploaded by
Lakshan Fonseka
- Document852903uploaded by
Lakshan Fonseka
- DocumentPerformance_Criterion_BSc-Eng-2011_21stMarch2012uploaded by
Lakshan Fonseka
- DocumentHKN-MCD-CN-13517-Abans Eng & CAN I(1)uploaded by
Lakshan Fonseka
- DocumentGTEC-IRE-0204_ Observation Report on non-conformances observed in lift lobby area_Level 1 & BOH area_Level 3_Building 2uploaded by
Lakshan Fonseka
- DocumentInstallation Schedule (1)uploaded by
Lakshan Fonseka
- DocumentStudying Overseasuploaded by
Lakshan Fonseka
- DocumentInformation for Candidatesuploaded by
Lakshan Fonseka
- DocumentIELTS PRACTICE TEST 01uploaded by
Lakshan Fonseka
- DocumentHKN-SUB-HAJV-4735uploaded by
Lakshan Fonseka
- DocumentHKN-MCD-CN-13555-Abans Engineeringuploaded by
Lakshan Fonseka
- DocumentReplacement of wear and tear parts of construction use elevator_FSL6.2(1)uploaded by
Lakshan Fonseka
- DocumentWater Front Inetgrated Resort Maintainance Agreementuploaded by
Lakshan Fonseka
- DocumentNon-Comprehensive Maintenance Agreement_Waterfront Integrated Resort (003)uploaded by
Lakshan Fonseka
- DocumentBD 123 Progress Work (Autosaved)uploaded by
Lakshan Fonseka
- DocumentElevator and Escalator Installation Progress of WaterFront Projectuploaded by
Lakshan Fonseka
- DocumentRevised (1) BD 4 Elevator Balance Works Schedule_2021!11!16uploaded by
Lakshan Fonseka
- DocumentRevised (1) BD 4 Elevator balance works Schedule_2021_11_16uploaded by
Lakshan Fonseka
- DocumentElevator and Escalator Installation Progress of WaterFront Projectuploaded by
Lakshan Fonseka
- DocumentBD 123 Progress Work (Autosaved)uploaded by
Lakshan Fonseka
- DocumentElevator and Escalator Installation Templateuploaded by
Lakshan Fonseka
- DocumentBD#4 Rectification Workuploaded by
Lakshan Fonseka
- DocumentCladding SubCon Analysisuploaded by
Lakshan Fonseka
- DocumentREPORT ON DAMAGES A 1uploaded by
Lakshan Fonseka
- DocumentReplacement parts of the temporary liftsuploaded by
Lakshan Fonseka
- DocumentNew Microsoft Word Documentuploaded by
Lakshan Fonseka
- DocumentReply to Letter Dated 29th Dec 2021uploaded by
Lakshan Fonseka
- DocumentNew Microsoft Word Document (2)uploaded by
Lakshan Fonseka
- DocumentSL 2.09 Sill modificationuploaded by
Lakshan Fonseka
- DocumentSL 2.09 Jamb Modificationuploaded by
Lakshan Fonseka
- DocumentSL 6.1 Modificationuploaded by
Lakshan Fonseka
- DocumentSL 2.09 Header Modificationuploaded by
Lakshan Fonseka
- DocumentSL 2.09 Core Cuttinguploaded by
Lakshan Fonseka
- DocumentES 2.3 Chippinguploaded by
Lakshan Fonseka
- DocumentGmail - Water Seeping Through Drain Pipe in to FSL 2.1 & FSL 2.2uploaded by
Lakshan Fonseka
- DocumentGmail - Chipping details of FSL 2.1 & 2.02uploaded by
Lakshan Fonseka
- DocumentDocument 12 - Ribbon Cables Were Damaged Due to Rats in Machine Roomuploaded by
Lakshan Fonseka
- DocumentGmail - FW_ requesting to remove glass materials in level 25 shaft entranceuploaded by
Lakshan Fonseka
- DocumentGmail - BD#2 pit wateruploaded by
Lakshan Fonseka
- DocumentDocument 13 - Fwd_ BD#2 Pit Wateruploaded by
Lakshan Fonseka