DAILY LESSON LOG

October 15-19 , 2018

SECTOR: Construction Industry COURSE: Electrical Inastallation and maintenance NC-II


MPONDAY/TUESDAY/WEDNESDAY THURSDAY/FRIDAY
LESSON: PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION AND
AND DISTRIBUTION SYSTEM (RC) DISTRIBUTION SYSTEM (RC)
Learning competency LO 4. Install cable bridge LO 4.1 Prepare tools/equipment and materials needed for the
installation of cable bridge in line with job requirements/Determine
the mass of the bridge/calculate the length of wire needed.
the Content/Topic PEC provisions on cable bridge Procedure in installing cable bridge
Content standard The learner demonstrates an understanding of the principles in The learner demonstrates an understanding of the principles in
performing roughing-in activities. performing roughing-in activities.
Code TLE_IAEI9- 12RC-IIa-j-1 TLE_IAEI9- 12RC-IIa-j-1
Materials PEC chart on cable bridge Procedures of wire ways and cable tray installation.
Reference/s: 1. Azares, Efren F and Recana, Cirilo B. Practical Electricity III TG pp—13
2. Fajardo,Module
Max B.and
title:
Fajardo, Leo R. Electrical Layouts and Estimates. 2. Lay-out and estimate
LM pp____
TG pp____
Learning Procedure: Preliminaries: Preliminaries:
a. Prayer a. Prayer
Activities b. Greetings b. Greetings
Drill/Review Drill/Review
Methodology: Demonstration/Discussion Demonstration/Discussion
Strategy: Group work/Reporting Group work/Reporting
Assessment: Demonstrate to the class pec provision on cable bridge Label all the needed tools for cable bridge installation.
Assignment: Bring tools needed in the installation of cable bridge. Bring your own tools for the next activity.
Remarks: No. of Learners with
a. Mastery
b. Needing enrichment
Refinement lessons:
Teachers Reflection

Prepared by: ________________ Checked by: _____________________