SUPERSTRUCTURE WORK Safe Lifting Plan Of Mobile Crane/Hydra

Please inform this plan to all concern in advance of commencement of work.

3A(R)(ICB No.CT P-3A(R)Project Planned Date: JFEG


Execution Safety Execution
Engineer engineer supervisor
Work date: Operator Name:

Crane Name: Location 1


Hydra name: Location 2

1.WORK DESCRIPTION
Subcon Work description Max Considered Signal Lifting
Size of wire Leader Signal Man Rigger
No name Weight as Method Method
sub-1 ton ton
sub-2 ton ton

2.Time Schedule
No 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:30
Sub-1
Sub-2

3.Specification of Crane
4.SV's Checklist YES NO Sub-1 Boom length
A) Information: is work Procedure known? 1)Wire Capacity
B) Barricade: Is Barricading done arround Swing area? mm
C)Wire Check: Is wire rope inspected by appored person during last 6 months? points
D)Tag line: Is Tag line is provided ? degree
F)Ground: Is ground is Properly Levelled & Compacted? ton
G)Electric Line: Is There any Electrical wire within working space? 2)Weight considered
H)Divices: Is All the divices are in working condition? ton
3)Maximum Radius
Engineer Signature: m
4)Working Radius

working radius
5. Operator Check List YES NO m
A)Organization: Is organization apporved by Sub-2
B)Signal Method: Is signal method is known to operator & Signal Man? 1)Wire Capacity
C)Barricade: Is Barricading done arround Swing area? mm
D)Outtrigger Base: Is Outtrigger base compacted & levelled? points
E) Max outtrigger: Is maximum length of outtrigger open? degree
F)SLS: Is safe Load signal is working? ton
2)Weight considered
Operator Signature: ton
3)Maximum Radius
Check in Advance m
4)Working Radius
m
4)Working Radius