Time Estimation Assignment
Time Estimation Assignment
Task
M2 - MEETING
2.1- Schedule meeting with GM and staff to introduce tablet rollout
2.2- Provide staff with satisfaction survey to fill at the end of the meet
2.3- Review survey results and confirm high satisfaction level
2.4- Have a brief question and answer session
M2 - MEETING
2.1- Schedule meeting with GM and staff to introduce tablet rollout
2.2- Provide staff with satisfaction survey to fill at the end of the meet
2.3- Review survey results and confirm high satisfaction level
2.4- Have a brief question and answer session
M5-COMPLETE TRAINING
5.1- Create a comprehensive training plan
5.2- Schedule training for Managers and Senior staffs
5.3- Schedule training for waitstaff at downtown location
5.4- Schedule training for waitstaff at the North location
5.5- Schedule post training reviews
5.6. Test run tablet ordering and POS features in house
Estimated Duration
Notes (Days)
1.1
1.1
4
1.2
Review quoates from vendors 2.3
2.1
1
Constantly check with Seydou for updades. 14.3
1.1
Inform Gilly and Alex about restaurant possible early closers. 5.6
Verify software version of POS 2
6.5
2
5
Seydou will train all senior staff and GMs 1.1
GMs or senior staff will train all other staff 1.1
1.1
1.1
Invite family and friends for the trial run 2
Confidence
Optimistic Most Likely Pessimistic Rating Known Dates
(H/M/L)