Professional Documents
Culture Documents
PROJECT TITLE / DỰ ÁN
D-T-307 DETAIL OF TECHNOLOGY PIPING (VII) SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
D-T-319 DETAIL OF P-102 A/B & P-103 A/B (II) MECHANICAL WORK
(CƠ KHÍ)
D-T-320 DETAIL OF P-104 A/B
DW G. TITLE / TÊN BẢN VẼ
D-T-321 DETAIL OF SEDIMENTATION TANK SR
SEWAGE TREATMENT PLAN
SHEET LIST
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
A-G-001
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
HATCH/ KÝ HIỆU DESCRIPTION/ DIỄN GIẢI ABBREVIATIONS/ VIẾT TẮT DESCRIPTION/ DIỄN GIẢI
SUS STEEL USE STAINLESS/ THÉP KHÔNG GỈ SITE LOCATION / ĐỊA ĐIỂM
CONCRETE/ BÊ TÔNG
PP POLYPROPYLENE
GS GALVANISED STEEL/ SẮT TRÁNG KẼM
BRICK/ TƯỜNG XÂY GẠCH
PPR POLYPROPYLENE RANDOM COPOLYMER
DN DIAMETER NOMINAL/ ĐƯỜNG KÍNH DANH NGHĨA
SAND/ CÁT
TOP TOP OF PIPE/ ĐỈNH ỐNG CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
PIPE LEGEND
+0.000 LEVEL REFERENCE/ CAO ĐỘ SÀN THỂ HIỆN COLOR COLOR PIPE TYPE/ LOẠI ỐNG ABBREVIATIONS
L01 SERIAL NUMBER OF LEVEL/ TÊN CAO TRÌNH WASTE WATER PIPE/ ỐNG NƯỚC THẢI WW PARK JONG SEOK
PREPARED BY
I=1% SLUDGE PIPE/ ỐNG BÙN CS
SLOPE DIRECTION/ ĐỘ DỐC AIR PIPE/ ỐNG KHÍ A
CHEMICAL PIPE/ ỐNG HÓA CHẤT C
SECTION NUMBER & DIRECTION/ SỐ MẶT CẮT ODOR PIPE/ ỐNG HÚT MÙI OP NGUYEN BA SON
1 2 3 4
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
A-D-01
SHEET REFERENCE NUMBER/ BẢN VẼ THỂ HIỆN KIM YOUNG KYUNG
MECHANICAL WORK
ENTRANCE WAY/ LỐI VÀO (CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
A1: 1 : 100
A3: 1 : 200
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
MCC RM
2000
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
800
800
2000
APPROVED BY:
2, 53 4
2, 80 0
GRIT
3, 55 0
CHAMBER
OPEN
1, 40 0
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
5, 75 0
M. H
800
M. H M. H M. H M. H
600
600
OPEN
OPEN OPEN OPEN OPEN
200
200800 500 800 500 800 900 900 2, 5 00 600300
APPROVED BY:
2, 00 0
2, 85 0
3, 11 6
600 1, 20 0 600
200800
200 2, 5 50 800 300
200 1, 20 0 200
M. H M. H
M. H
600
OPEN OPEN
15, 95 0
15, 95 0
OPEN
200800
M. H APPROVED BY:
4, 70 0
OPEN
600 950
3, 30 0
PARK JONG SEOK
5, 40 0
2, 80 0
PREPARED BY
200
200
NGUYEN BA SON
M. H
600
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
200800 OPEN
800 1, 5 00
OPEN
SHINSUNG VINA
3, 50 0
3, 50 0
M. H
600
OPEN ∅300
APPROVAL REQUESTED BY:
200800 800 400 800 300
1, 20 0
M. H OPEN M. H M. H
600
600
OPEN OPEN OPEN
200
200
KIM YOUNG KYUNG
800
800 2, 4 00 200 3, 5 00 200 2, 2 00 300 800
10, 4 00
MECHANICAL WORK
(CƠ KHÍ)
1 : 100
MIDDLE SLAB PLAN
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
B-M-101
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
800
APPROVED BY:
H
W
3, 55 0
FL
#1~3 SEPARATION SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
TANK
FL+0,00
5, 75 0
FLOW CONTROL TANK
500 2 1
300
300
200
APPROVED BY:
300
3 4
SLUDGE
2, 00 0
200 1, 20 0 200
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
500
15, 95 0
3 FL + 3,500 250W x 250H
APPROVED BY:
1, 0 00 1, 2 00
6 4 FL + 3,500 250W x 250H
4, 70 0
3, 30 0
TANK
PREPARED BY
200
NGUYEN BA SON
3, 50 0
300
300
10 14
12 13
425
∅600
BIO FILTER FILTER
KIM YOUNG KYUNG
SLUDGE PIT TANK TANK 11 FL + 0.00 200W x 200H
Revision Issued date Description
200
800
2, 4 00 3, 5 00 2, 5 00 MECHANICAL WORK
800 200 200 800 (CƠ KHÍ)
15 FL + 3,600 250W x 250H
DW G. TITLE / TÊN BẢN VẼ
10, 4 00
SR
SEWAGE TREATMENT PLAN
SLEEVES PLAN
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
2000
KEY PLAN
2000
S-101B S-102
4350
T-01
2800
2234
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS
APPROVED BY:
S-105 1 GRIT CHAMBER T-01 7 SEDIMENTATION TANK T-07
P-101 A/B
S-101A S-103
2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08
220
3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
360
300
T-02 A T-02 B T-02 B T-03 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
220
300
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
SM-101
B-101 A/B
200
915
T-12 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
APPROVED BY:
2000
1000
MT-101
NO. EQUIPMENT NAME NO. EQUIPMENT NAME
200
P-107
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
500
S-101A/B BAR SCREEN AL-101 SCUM SKIMMER PUMP
2405
300
T-06 B T-04 S-102 BAR SCREEN P-104A/B SLUDGE PUMP
100 300
T-06 A
APPROVED BY:
SM-102 BF-101 BIO FILTER SYSTEM
S-103 BAR SCREEN
4086
1100
S-104
4700
900 B-101A/B BLOWER (VIBRATION PROOFING) M- 1 0 4 SUPERNATANT RETURN PIPE APPROVAL REQUESTED BY:
4100
P-102 A/B S M- 1 0 3 A / B MIXER (INCLUDE-LIFT WINCH) M- 1 0 5 AIR DIFFUSER KIM YOUNG KYUNG
2300
MECHANICAL WORK
CR - 1 0 1 SLUDGE SCRAPER DS - 1 0 1 DEODORIZATION SYSTEM (CƠ KHÍ)
200 219 360 221 200 218 360 222 220 360 220 300
800
P-104 A/B P-105 A/B P-103A/B SLUDGE FEED PUMP P DOS - 1 0 1 DEODORIZATION SYSTEM DW G. TITLE / TÊN BẢN VẼ
SR
SEWAGE TREATMENT PLAN
800 2400 200 3500 200 1000 200 1300 800 GENERAL EQUIPMENT PLAN
A1: 1 : 100
1 GENERAL EQUIPMENT PLAN A3: 1 : 200
1 : 75 DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
B-M-103
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
2000
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
APPROVED BY:
2534
S-101B S-102
T-01
2800
1 GRIT CHAMBER T-01 7 SEDIMENTATION TANK T-07
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
S-105 2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08
P-101 A/B 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
S-101A S-103
4700
220
SM-101 4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
360
300
T-02 A T-02 B T-02 B T-03 APPROVED BY:
6450
220
5 ANOXIC TANK T-05 11 SLUDGE PIT T-11
300
6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
T-12 915
B-101 A/B
1000
2168
MT-101 AL-101 SCUM SKIMMER PUMP
S-101A/B BAR SCREEN
APPROVED BY:
P-107
BIO FILTER SYSTEM
300
NGUYEN BA SON
300 300 950
MT - 1 0 1 MEASURING TANK & MESH SCREEN P-106A/B/C EFFLUENT PUMP SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
MECHANICAL WORK
P-102 A/B
M- 1 0 3 MEDIA EF-102 EXHAUST FAN (CƠ KHÍ)
P-103 A/B
1750
A1: 1 : 100
A3: 1 : 200
1 EQUIPMENT PLAN FL+4.2M DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
1 : 75 B-M-104
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
2000
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2000
774
APPROVED BY:
S-101B S-102
1600
T-01
2800
2234
700 1150 1150 1150 700
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
220
2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08
360
300
T-02 A T-02 B T-02 B T-03
3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09 APPROVED BY:
220
300
2001
P-101 A/B 4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
T-12
P-107 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
2350
640
640
SM-102
S-101A/B BAR SCREEN AL-101 SCUM SKIMMER PUMP
300
570
T-04
570
570
100 300
T-06 A S-102 BAR SCREEN P-104A/B SLUDGE PUMP PARK JONG SEOK
PREPARED BY
570
570
570
NGUYEN BA SON
P-101A/B FLOW CONTROL PUMP P-105A/B FILTER PUMP
570
570
570
570
SHINSUNG VINA
T-05 MT - 1 0 1 MEASURING TANK & MESH SCREEN P-106A/B/C EFFLUENT PUMP
APPROVAL REQUESTED BY:
570
570
570
640
640
1200
600 1200 600 550 1200 550 S-105 SLUDGE DRYER F M- 1 0 1 FLOW METER
KIM YOUNG KYUNG
T-11 SR
M- 1 0 3 MEDIA EF-102 EXHAUST FAN SEWAGE TREATMENT PLAN
418 360 222 200 420 360 520 CR - 1 0 1 SLUDGE SCRAPER DS - 1 0 1 DEODORIZATION SYSTEM EQUIPMENT PLAN FL+0.0M
200 219 360 221
P-104 A/B P-105 A/B
P-103A/B SLUDGE FEED PUMP P DOS - 1 0 1 DEODORIZATION SYSTEM
DATED / HOÀN THÀNH SCALE / TỶ LỆ
A1: 1 : 100
A3: 1 : 200
1 EQUIPMENT PLAN FL+0.0M
DWG NO. REFER/
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
11-11
D-T-311 PROJECT TITLE / DỰ ÁN
550 mmx350 mm
S-101B S-102
T-01
700 mmx350 mm
1-1 1-1 APPROVED BY:
D-T-301 D-T-301
P-101 A/B
S-101A S-103 SM-101
T-03
T-02 A T-02 B T-02 B
2-2 2-2
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
D-T-302 D-T-302
550 mmx350 mm
T-12
APPROVED BY:
700 mmx350 mm
4-4 4-4
D-T-304 SM-102 D-T-304
T-04
T-06 A
T-06 B
APPROVED BY:
SM-103
PARK JONG SEOK
B-102 A/B
PREPARED BY
400 mmx350 mm
T-05
MF-101 NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
6-6
T-06 C
216 mmø D-T-306
P-106 A/B/C T-10
6-6
KIM YOUNG KYUNG
D-T-306 P-102 A/B
T-07 WW - SUS304 - DN80 Revision Issued date Description
216 mmø
FL +6.756
CR-101
T-08 T-09
T-11 7-7
P-103 A/B D-T-307
SR
SEWAGE TREATMENT PLAN
D-T-308 9-9
D-T-309 10-10
CS - SUS304 - DN50
FL +6.360
D-T-310
DATED / HOÀN THÀNH SCALE / TỶ LỆ
A1: 1 : 100
11-11 A3: 1 : 200
A GENERAL PIPING PLAN D-T-311
DWG NO. REFER/
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
11-11
D-T-311 PROJECT TITLE / DỰ ÁN
S-101B S-102
T-01
1-1 1-1 APPROVED BY:
D-T-301 D-T-301
P-101 A/B
S-101A S-103 SM-101
165 mmø
T-02 A T-02 B T-02 B T-03
2-2 2-2
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
D-T-302 D-T-302
WW - SUS304 - DN80
FL +5.200
T-12
APPROVED BY:
165 mmø
3-3 MT-101 3-3
D-T-303 D-T-303
P-107
B-101 A/B MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
4-4 4-4
D-T-304 D-T-304
T-04
T-06 A
T-06 B
APPROVED BY:
SM-102
SM-103
165 mmø
B-102 A/B PARK JONG SEOK
WW - SUS304 - DN80
WW - SUS304 - DN80 PREPARED BY
FL +6.100 FL +6.300
WW - SUS304 - DN80 CS - SUS304 - DN80
FL +6.100 FL +6.300
CS - SUS304 - DN80
FL +6.300
T-05
MF-101 NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
216 mmø
FL +5.700
CS - SUS304 - DN80
FL +5.700
APPROVAL REQUESTED BY:
CS - SUS304 - DN50
FL +5.700
6-6
216 mmø D-T-306
T-10
T-06 C P-106 A/B/C
6-6
KIM YOUNG KYUNG
D-T-306 P-102 A/B T-07 Revision Issued date Description
216 mmø
CR-101
T-08 T-09
7-7
P-103 A/B D-T-307
T-11
7-7 ITEM / HẠNG MỤC
D-T-307
MECHANICAL WORK
230
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
1 : 75
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
C-P-202
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
11-11
D-T-311
8-8 9-9 10-10 SITE LOCATION / ĐỊA ĐIỂM
KEY PLAN
775
A - SUS304 - DN40
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2375
FL +0.100
T-01 4850
1599
1-1 1-1
D-T-301 D-T-301 APPROVED BY:
FL +3.500
WW - SUS304 - DN150 A - SUS304 - DN40
WW - SUS304 - DN150
WW - SUS304 - DN150
FL +3.500 SM-101
T-02 A T-02 B T-02 B FL +0.100
T-03
2-2 2-2
D-T-302
2000
2001
P-101 A/B D-T-302 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
999
WW - SUS304 - DN150 A - SUS304 - DN40
T-12 FL +3.500
P-107 APPROVED BY:
FL +0.100
3750
1375
1375
3-3 3-3
1001
D-T-303 D-T-303
540
640
4-4 SM-102 4-4 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
D-T-304 D-T-304
570
T-04
570
T-06 B T-06 A
570
APPROVED BY:
570
A - SUS304 - DN50
A - SUS304 - DN50
A - SUS304 - DN50
A - SUS304 - DN50
SM-103
570
A - SUS304 - DN50
570
PARK JONG SEOK
570
570
PREPARED BY
570
570
T-05
MF-101
570
570
NGUYEN BA SON
390
5-5 5-5
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
640
550 1200 1200 550
D-T-305 D-T-305
SHINSUNG VINA
6-6 APPROVAL REQUESTED BY:
T-08
P-102 A/B T-09
500 500
7-7
D-T-307
P-103 A/B
7-7 T-11
D-T-307 ITEM / HẠNG MỤC
MECHANICAL WORK
(CƠ KHÍ)
P-104 A/B P-105 A/B
DW G. TITLE / TÊN BẢN VẼ
SR
SEWAGE TREATMENT PLAN
8-8 10-10
D-T-308 9-9 D-T-310 BOTTOM PIPING LAYOUT
D-T-309 FL+0.0M
11-11
D-T-311 DATED / HOÀN THÀNH SCALE / TỶ LỆ
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
11-11
D-T-311
SITE LOCATION / ĐỊA ĐIỂM
9-9
8-8
D-T-309
D-T-308 KEY PLAN
10-10
2000
D-T-310
2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08 APPROVED BY:
2534
S-101B S-102
T-01 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
1-1 1-1
D-T-301 D-T-301 4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
P-101 A/B 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
S-101A S-103
220
6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
T-02 B
360
T-02 A T-02 B T-03
2-2 2-2
220
D-T-302 D-T-302
SM-101 A
APPROVED BY:
3000
D-T-312
WW - SUS304 - DN80
FL +5.200
WW - SUS304 - DN80
FL +4.454
T-12 B-101 A/B
3-3 MT-101 3-3 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
D-T-303 D-T-303
P-107 WW - SUS304 - DN150
MF-101
SHINSUNG VINA
APPROVAL REQUESTED BY:
5-5 5-5
D-T-305 D-T-305
1
P-106 A/B/C D-T-314
6-6 KIM YOUNG KYUNG
D-T-306 Revision Issued date Description
T-10
6-6 T-06 C
D-T-306 WW - SUS304 - DN80
T-07 FL +6.844
275 275 1625
CR-101
P-102 A/B
T-08 T-09
7-7 ITEM / HẠNG MỤC
D-T-307
P-103 A/B MECHANICAL WORK
(CƠ KHÍ)
7-7 T-11 B
D-T-307 D-T-313 DW G. TITLE / TÊN BẢN VẼ
SR
180 180 520 SEWAGE TREATMENT PLAN
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
11-11
D-T-311
SITE LOCATION / ĐỊA ĐIỂM
9-9
8-8
D-T-309
D-T-308 KEY PLAN
10-10
2000
D-T-310
2000
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS
2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08 APPROVED BY:
S-101B S-102
2754
T-01 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
1-1 1-1
D-T-301 D-T-301 4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
WW - SUS304 - DN150
FL +3.500 P-101 A/B 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
650
6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
500
500
360
T-02 A T-02 B T-02 B T-03
2-2 2-2
D-T-302
400
400
D-T-302
SM-101
APPROVED BY:
400
WW - SUS304 - DN150
FL +3.500
3-3 MT-101 3-3 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
B-102 A/B
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
T-05
MF-101
SHINSUNG VINA
APPROVAL REQUESTED BY:
5-5 5-5
D-T-305 D-T-305
P-106 A/B/C
6-6 KIM YOUNG KYUNG
D-T-306 Revision Issued date Description
T-10
6-6 T-06 C
1700
SR
180 180 520 SEWAGE TREATMENT PLAN
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
11-11
D-T-311 SITE LOCATION / ĐỊA ĐIỂM
9-9
8-8
D-T-309 KEY PLAN
D-T-308
10-10
2000
D-T-310
S-101B S-102 2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08
T-01
1-1 1-1 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
D-T-301 D-T-301
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
T-02 A T-02 B T-02 B T-03 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
2-2 2-2
D-T-302 P-101 A/B D-T-302
APPROVED BY:
A - SUS304 - DN65
FL +5.958
A - SUS304 - DN150
T-12 FL +6.200
1
D-T-316
MT-101
3-3 3-3
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
D-T-303 D-T-303
B-101 A/B
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
T-05
A - SUS304 - DN100
MF-101 FL +6.000
SHINSUNG VINA
APPROVAL REQUESTED BY:
5-5 5-5
D-T-305 D-T-305
A - SUS304 - DN50
FL +6.327
P-106 A/B/C
FL +6.327 6-6 KIM YOUNG KYUNG
A - SUS304 - DN50 D-T-306 Revision Issued date Description
T-10
6-6 T-06 C
D-T-306 P-102 A/B
T-07
CR-101
T-08 T-09
7-7 ITEM / HẠNG MỤC
P-104 A/B P-105 A/B D-T-307
P-103 A/B MECHANICAL WORK
(CƠ KHÍ)
7-7 T-11
D-T-307 DW G. TITLE / TÊN BẢN VẼ
SR
SEWAGE TREATMENT PLAN
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
11-11
D-T-311 SITE LOCATION / ĐỊA ĐIỂM
9-9
8-8
D-T-309 KEY PLAN
D-T-308
10-10
2000
D-T-310
2000
A - SUS304 - DN40
FL +0.100
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS
775
1 GRIT CHAMBER T-01 7 SEDIMENTATION TANK T-07
APPROVED BY:
S-101B S-102 2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08
T-01
1600
1-1 A - SUS304 - DN40 1-1 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
FL +0.100
D-T-301 D-T-301
1500 1500
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
T-02 A T-02 B T-02 B T-03 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
2-2 2-2
D-T-302
2000
A - SUS304 - DN40 P-101 A/B D-T-302
FL +0.100 APPROVED BY:
A - SUS304 - DN32
1000
T-12 FL +0.100
3-3 3-3
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
B-101 A/B
D-T-303 D-T-303
A - SUS304 - DN50
550 1200 1200 550
540
640
640
T-04
570
570
T-06 A
T-06 B
570
570
PREPARED BY
SM-103
570
570
570
B-102 A/B
FL +0.100
570
570
570
FL +0.100
570
A - SUS304 - DN50
600 1200 600 FL +0.100
MF-101
570
SHINSUNG VINA
570
570
T-05
APPROVAL REQUESTED BY:
5-5 5-5
740
640
640
D-T-305 D-T-305
A - SUS304 - DN50
FL +0.100
P-106 A/B/C
A - SUS304 - DN32 6-6 KIM YOUNG KYUNG
SR
SEWAGE TREATMENT PLAN
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
11-11
D-T-311 SITE LOCATION / ĐỊA ĐIỂM
9-9
8-8 KEY PLAN
D-T-309
D-T-308
10-10
2000
D-T-310
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10 APPROVED BY:
P-101 A/B
S-101A S-103 SM-101
SM-103
CS - SUS304 - DN80
FL +6.000
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
CS - SUS304 - DN80
CS - SUS304 - DN80 B-102 A/B
CS - SUS304 - DN50
T-05 MF-101 SHINSUNG VINA
APPROVAL REQUESTED BY:
3000
5-5 5-5
D-T-305 CS - SUS304 - DN80
D-T-305
FL +6.300
FL +5.700
2145
CS - SUS304 - DN80
FL +5.700 FL +6.300 KIM YOUNG KYUNG
FL +6.300 6-6
Revision Issued date Description
D-T-306
T-10
6-6 T-06 C 250 250 200
P-106 A/B/C
D-T-306 P-102 A/B
T-07
CR-101
1
200
T-08 T-09
D-T-318 7-7 ITEM / HẠNG MỤC
PROJECT TITLE / DỰ ÁN
11-11
D-T-311 SITE LOCATION / ĐỊA ĐIỂM
9-9
8-8 KEY PLAN
D-T-309
D-T-308
10-10
2000
D-T-310
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10 APPROVED BY:
P-101 A/B
S-101A S-103 SM-101
APPROVED BY:
4-4 4-4
D-T-304 SM-102 D-T-304
T-04
T-06 A
T-06 B
PARK JONG SEOK
PREPARED BY
SM-103
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
B-102 A/B
T-05 MF-101 SHINSUNG VINA
APPROVAL REQUESTED BY:
5-5 5-5
D-T-305 D-T-305
T-08 T-09
ITEM / HẠNG MỤC
7-7
D-T-307 MECHANICAL WORK
P-103 A/B (CƠ KHÍ)
7-7 T-11
DW G. TITLE / TÊN BẢN VẼ
D-T-307
SR
SEWAGE TREATMENT PLAN
FL +0.000
CS - SUS304 - DN150
P-104 A/B P-105 A/B SLUDGE PIPING PLAN FL+0.0M
D-T-311
2000
D-T-308 D-T-309 D-T-310 KEY PLAN
1481
550 mmx350 mm 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
FL +0.226
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
T-01
700 mmx350 mm
APPROVED BY:
1-1 1-1 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11
D-T-301 FL +6.600
D-T-301
6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
2500
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
550 mmx350 mm
APPROVED BY:
T-12
FL +6.600
FL +6.600
700 mmx350 mm
3-3 3-3
3000
3000
D-T-303 D-T-303
3000
FL +6.426
FL +4.200
400 mmx350 mm
NGUYEN BA SON
FL +6.400
T-05 SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
6-6
3000
T-08 T-09
7-7
D-T-307
ITEM / HẠNG MỤC
7-7 T-11 MECHANICAL WORK
D-T-307 (CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
DUCT PLAN
8-8 10-10
D-T-308 9-9 D-T-310
D-T-309 DATED / HOÀN THÀNH SCALE / TỶ LỆ
? - ? - DN?
1 DUCT PLAN 11-11 A1: 1 : 100
A3: 1 : 200
D-T-311
1 : 75 DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
C-P-210
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
∅3 x 4P x 380V x 40kw
MCC PANEL
2000
APPROVED BY:
CABLE TRAY
800
800
400W x 100H
2000
5, 75 0
APPROVED BY:
M
SM-101 L/S
M M
1.5 kw
200
2, 00 0
M M
P-107 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
5.5 kw
FL +6.500 M
B-101A/B SM-102
200
200 1, 20 0 200
3.7 5k w 0.7 5k w
APPROVED BY:
M
15, 95 0
15, 95 0
B-102A/B
5.5 kw
PARK JONG SEOK
M
SM-103
PREPARED BY
4, 70 0
M M 0.7 5k w
3, 30 0
CABLE TRAY
P D OS - 1 0 1 200W x 100H
0.7 5k w NGUYEN BA SON
M SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
FL +6.500
200
200
SHINSUNG VINA
M APPROVAL REQUESTED BY:
P-106A/B/C
200 1, 30 0
E F- 1 0 2 M
M M M
FL +6.500 0.7 5k w 1.5 kw
2, 30 0
S F- 1 0 1
1.5 kw
P-102A/B CR-101
3, 50 0
3, 50 0
M M
0.7 5k w M 0.4 kw KIM YOUNG KYUNG
P-105A/B
Revision Issued date Description
1.5 kw
2, 00 0
1, 00 0200
L/S
M M P-103A/B M M M M
0.7 5k w
800
POWER PLAN
POWER PLAN
1 : 100 DATED / HOÀN THÀNH SCALE / TỶ LỆ
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
C-P-211
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
2800
CONTROL ROOM
2100
APPROVED BY:
T-01
150
APPROVED BY:
PREPARED BY
T-02 A T-02 B T-02 C T-03
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
A - SUS304 - DN40
SR
SEWAGE TREATMENT PLAN
DETAIL OF TECHNOLOGY
PIPING (I)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-301
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
165 mmø
165 mmø
165 mmø
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
CONTROL ROOM A - SUS304 - DN40
2800
1758
APPROVED BY:
T-01
150
700
700
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
WW - SUS304 - DN150
WW - SUS304 - DN80
PARK JONG SEOK
A - SUS304 - DN40 PREPARED BY
4050
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
P-101 A/B
SHINSUNG VINA
A - SUS304 - DN40
APPROVAL REQUESTED BY:
MECHANICAL WORK
C-P-201 1 : 50 (CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
DETAIL OF TECHNOLOGY
PIPING (II)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-302
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
CONTROL ROOM
APPROVED BY:
1773
150
? DN? DN? /?
APPROVED BY:
WW - SUS304 - DN150
WW - SUS304 - DN150
PARK JONG SEOK
A - SUS304 - DN32
WW - SUS304 - DN80 PREPARED BY
A - SUS304 - DN40
4050
T-12 T-03
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
3750 4850
MECHANICAL WORK
(CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (III)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-303
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
CONTROL ROOM
APPROVED BY:
2800
APPROVED BY:
150
? - ? - DN?
A - SUS304 - DN50
NGUYEN BA SON
550 1200 1200 550 600 1200 600 SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
300
SR
SEWAGE TREATMENT PLAN
DETAIL OF TECHNOLOGY
PIPING (IV)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-304
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
CONTROL ROOM
APPROVED BY:
150
APPROVED BY:
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
MECHANICAL WORK
(CƠ KHÍ)
5-5 Section 5-5
DW G. TITLE / TÊN BẢN VẼ
C-P-201 1 : 50 SR
SEWAGE TREATMENT PLAN
DETAIL OF TECHNOLOGY
PIPING (V)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-305
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
CS - SUS304 - DN80
CONTROL ROOM
? - ? - DN?
1500
APPROVED BY:
150
CS - SUS304 - DN80
APPROVED BY:
CS - SUS304 - DN80
SHINSUNG VINA
APPROVAL REQUESTED BY:
SR
SEWAGE TREATMENT PLAN
DETAIL OF TECHNOLOGY
PIPING (VI)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-306
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
CONTROL ROOM
APPROVED BY:
150
APPROVED BY:
WW - SUS304 - DN80
WW - SUS304 - DN80
CS - SUS304 - DN50
CS - SUS304 - DN50
CS - SUS304 - DN80
PARK JONG SEOK
PREPARED BY
T-07 T-11
4050
T-09 T-08
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
7-7 Section 7-7
DETAIL OF TECHNOLOGY
C-P-201 1 : 50 PIPING (VII)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-307
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
CONTROL ROOM
2100
T-01 APPROVED BY:
150
APPROVED BY:
CS - SUS304 - DN80
4050
? - ? - DN?
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
APPROVED BY:
A - SUS304 - DN50
NGUYEN BA SON
800 1000 200 2300 200 4700 200 2000 200 3250 1100 SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
DETAIL OF TECHNOLOGY
PIPING (VIII)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-308
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
APPROVED BY:
165 mmø
165 mmø
165 mmø
216 mmø
216 mmø
216 mmø
CONTROL ROOM
APPROVED BY:
150
SD - SUS304 - DN80
SD - SUS304 - DN80
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
300
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
DETAIL OF TECHNOLOGY
PIPING (IX)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-309
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
2800
CONTROL ROOM
APPROVED BY:
150
APPROVED BY:
A - SUS304 - DN40
A - SUS304 - DN40
A - SUS304 - DN40
T-08 T-10 T-05 T-04 T-03
WW - SUS304 - DN80
CS - SUS304 - DN50
4050
A - SUS304 - DN50
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
300
800 2000 200 1300 200 3300 200 1200 200 5750 800
KIM YOUNG KYUNG
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
DETAIL OF TECHNOLOGY
PIPING (X)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-310
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
WW - SUS304 - DN80
165 mmø
165 mmø
WW - SUS304 - DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
CONTROL ROOM
CS - SUS304 - DN80
2556
Gate valve/ Van cổng DN80
Check valve/ Van 1 chiều DN80
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
1800
APPROVED BY:
150
APPROVED BY:
WW - SUS304 - DN80
WW - SUS304 - DN80
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
300
800 5750 200 1200 200 3300 200 1300 200 2000 800
KIM YOUNG KYUNG
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
DETAIL OF TECHNOLOGY
PIPING (XI)
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-311
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
2-2 2-2
D-T-312 D-T-312
APPROVED BY:
P-101 A/B
WW - SUS304 - DN80
APPROVED BY:
1-1
D-T-312
360
A DETAIL OF P-101 A/B MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
C-P-204 1 : 20
APPROVED BY:
WW - SUS304 - DN80
WW - SUS304 - DN80
PARK JONG SEOK
PREPARED BY
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
1-1 Section 1-1 of P-101 A/B 2-2 Section 2-2 of P-101 A/B A1: 1 : 100
A3: 1 : 200
D-T-312 1 : 25 D-T-312 1 : 25
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-312
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
KEY PLAN
D-T-313 D-T-313
WW - SUS304 - DN80
APPROVED BY:
P-105 A/B
APPROVED BY:
WW - SUS304 - DN80
WW - SUS304 - DN80
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
APPROVED BY:
2-2
D-T-313
WW - SUS304 - DN80
PARK JONG SEOK
B DETAIL OF P-105 A/B PREPARED BY
C-P-204 1 : 20
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
1-1 Section 1-1 of P-105 A/B 2-2 Section 2-2 of P-105 A/B DATED / HOÀN THÀNH SCALE / TỶ LỆ
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
1-1
D-T-314 SITE LOCATION / ĐỊA ĐIỂM
KEY PLAN
2-2 2-2
D-T-315 D-T-315
WW - SUS304 - DN80
WW - SUS304 - DN80
2556
2400
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
? DN? DN? /?
FL +6.756
WW - SUS304 - DN80
3-3 3-3
D-T-315 D-T-315 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
APPROVED BY:
P-106 A/B/C
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
1-1 APPROVAL REQUESTED BY:
D-T-314
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
A1: 1 : 100
A3: 1 : 200
DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-314
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
WW - SUS304 - DN80
APPROVED BY:
Check valve/ Van 1 chiều DN80
APPROVED BY:
D-T-314 1 : 30
WW - SUS304 - DN80
WW - SUS304 - DN80
WW - SUS304 - DN80
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
MECHANICAL WORK
(CƠ KHÍ)
P-106 A/B/C
DW G. TITLE / TÊN BẢN VẼ
SR
SEWAGE TREATMENT PLAN
A1: 1 : 100
3-3 Section 3-3 of P-106 A/B A3: 1 : 200
D-T-314 1 : 30 DWG NO. REFER/
DWGTHAM CHIẾU DWG No./ BẢN VẼ SỐ
D-T-315
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
1-1
D-T-316
PROJECT TITLE / DỰ ÁN
A - SUS304 - DN150
KEY PLAN
B-101 A/B
APPROVED BY:
2-2 2-2
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
D-T-316 D-T-316
APPROVED BY:
1-1
D-T-316
1 DETAIL OF B-101 A/B
C-P-206 1 : 25
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
APPROVED BY:
A - SUS304 - DN80
A - SUS304 - DN80
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
A - SUS304 - DN32
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
2-2
D-T-317
PROJECT TITLE / DỰ ÁN
KEY PLAN
A - SUS304 - DN200
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
1-1 1-1
D-T-317 D-T-317
APPROVED BY:
APPROVED BY:
D-T-317
A - SUS304 - DN200
APPROVED BY:
A - SUS304 - DN100
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
1898
KIM YOUNG KYUNG
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
A1: 1 : 100
A3: 1 : 200
1-1 Section 1-1 of B-102 A/B 2-2 Section 2-2 of B-102 A/B DWG NO. REFER/
DWG No./ BẢN VẼ SỐ
D-T-317 1 : 20 D-T-317 1 : 20
DWGTHAM CHIẾU
D-T-317
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
1-1
D-T-318 PROJECT TITLE / DỰ ÁN
KEY PLAN
CS - SUS304 - DN80
360 FL +5.700
FL +5.700
CS - SUS304 - DN50
CS - SUS304 - DN80
FL +6.300 CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
CS - SUS304 - DN80
Gate valve/ Van cổng DN80
Check valve/ Van 1 chiều DN80
CS - SUS304 - DN80
P-102 A/B
3-3 3-3
D-T-319 D-T-319 APPROVED BY:
1500
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
P-103 A/B
2-2 2-2
D-T-319 D-T-319 APPROVED BY:
APPROVED BY:
1-1 PREPARED BY
D-T-318
CS - SUS304 - DN80
CS - SUS304 - DN80
1 DETAIL OF P-102 A/B & P-103 A/B NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
C-P-208 1 : 25
SHINSUNG VINA
APPROVAL REQUESTED BY:
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
A1: 1 : 100
1-1 Section 1-1 of P-102 A/B & P-103 A/B A3: 1 : 200
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
CS - SUS304 - DN80
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
1500
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
APPROVED BY:
360
360 PARK JONG SEOK
PREPARED BY
CS - SUS304 - DN80
CS - SUS304 - DN80
CS - SUS304 - DN80
CS - SUS304 - DN80
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
A1: 1 : 100
2-2 Section 2-2 of P-102 A/B & P-103 A/B 3-3 Section 3-3 of P-102 A/B & P-103 A/B A3: 1 : 200
D-T-318 1 : 30 D-T-318 1 : 30 DWG NO. REFER/
DWG No./ BẢN VẼ SỐ
DWGTHAM CHIẾU
D-T-319
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
2-2
D-T-320 Gate valve/ Van cổng DN80
Gate valve/ Van cổng DN80 SITE LOCATION / ĐỊA ĐIỂM
Check valve/ Van 1 chiều DN50 Gate valve/ Van cổng DN80
Check valve/ Van 1 chiều DN50 Check valve/ Van 1 chiều DN50
KEY PLAN
1300
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
1-1 1-1
D-T-320 D-T-320
CS - SUS304 - DN50
APPROVED BY:
2-2
D-T-320
222 360 418
1 DETAIL OF P-104 A/B MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
CS - SUS304 - DN50
CS - SUS304 - DN50
C-P-208 1 : 20
APPROVED BY:
CS - SUS304 - DN50
PARK JONG SEOK
PREPARED BY
NGUYEN BA SON
SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
SHINSUNG VINA
APPROVAL REQUESTED BY:
MECHANICAL WORK
(CƠ KHÍ)
SR
SEWAGE TREATMENT PLAN
1-1 Section 1-1 of P-104 A/B 2-2 Section 2-2 of P-104 A/B DATED / HOÀN THÀNH SCALE / TỶ LỆ
REFER DWG_NO1
CLIENT / CHỦ ĐẦU TƯ
1-1
D-T-321
PROJECT TITLE / DỰ ÁN
200
KEY PLAN
APPROVED BY:
3500
APPROVED BY:
APPROVED BY:
800
2344
1-1
NGUYEN BA SON
D-T-321 SUB CONTRACTOR / NHÀ THẦU PHỤ : xxx
MECHANICAL WORK
(CƠ KHÍ)
300
SR
SEWAGE TREATMENT PLAN
DETAIL OF SEDIMENTATION
TANK
REFER DWG_NO1