KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND

SERVICES (MYP)

PROACTIVE NOTIFICATION
1. SEPCO(To complete):
Project Title/No:
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES (MYP)

PN No:
SAC-MYP-QA(P4)-PAN-0063
Location /
Package 4.(concrete bored piles)
Date Identified:
Date:
Responsibility:

Sinohydro Foundation Construction


Project Phase:

Construction

Violation / No Violation:

No Violation
Description of Notification:
It’s proactively advised to Sinohydro Foundation Construction that
If water for the Works is not available from a public supply, the Contractor shall use an alternative
source that shall comply with the requirements of 09-SAMSS-097.
the Contractor shall arrange
for tests of the water for the Works to be carried out in accordance with the specified schedule before
and during the progress of the work.

Reference Document (standards, specifications, drawings, etc.):


Project Specs:
RE-621012- 0A4
Sec.3.1 (water)

SEPCO QC Supervisor: Name: Mr Salahudin Signature: Date:


Prepared by: Name: Wasim Javeed Signature: Date:

Received by Name: Signature: Date:

Page1 of 2
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND
SERVICES (MYP)

PROACTIVE NOTIFICATION
Construction
representative:

Action Required: YES NO


Action Taken:

Action by: Name: Signature: Date:

Verification:

Verification by:

Name:
Signature:
Date:

Closed:
SEPCO QC Supervisor
Name:
Signature:
Date
SEPCO QC Manager:

Name:
Signature:
Date:

Page2 of 2