Name of Project: NESTLE PHILIPPINES INC.

- CDO FACTORY

Nature of Project: UPGRADING OF WWTP MILK WASTE STREAM

ACTIVITY ITEMS/PARTS INSPECTED SPECIFIC CHECK AREA TEST/ EXTENT APPLICABLE


INSPECTION OF TEST/ INSPECTION DOCUMENTS
QC OP
1. MATERIAL Pipes Material Specification Verification Random 100% Approved Project

RECEIVING Fittings Traceability Visual Random 100% Specification

Flanges Markings. Sizes, Dimensional Random 100% Approved Drawing

Valves, etc. Schedule, Rating

Physical Appearance

2. BLASTING and External Surface Surface Preparation Visual Random 100% Approved Project

PRIME COAT OF Specification

STRAIGHT PIPES

Dry Film Thickness Dimensional Random 100% Approved Painting

Specification
Location: Brgy. Tablon, Cagayan de Oro City

Cover Period: September 2014 - February 2015

ACCEPTANCE REQUIREMENT PROJECT INSP. TEAM


BIPI - FMN BIPI QC NPI

1.1Shall have identification marking or accompanying Material Test C H/R R

Certificate (MTC) or Mill Certificate (MC)

1.2 Material shall be traceable to the corresponding MTC or MC C H/R R

1.3 Shall be properly marked/color coded for easy identification

1.4 All materials shall be free from injurious surface defects, distortions, C H/R R

etc.

1.5 Material specifications, sizes, schedules, ratings shall conform to C C R

approved project specifications.

2.1 Surface preparation shall meet the requirement stated in project D/C C W/R

specification.

2.2 Protective coating (primer) shall be as per painting specification C C W/R

as based on service line.

2.3 Surface preparation and coating shall not be undertaken when D/C C W/R

there is a likelihood of a change in weather conditions within 4 hours

of the application which would result in air temperature below the

specified or will cause deposition of moisture on the surface.

2.4 Shall be prime coated and dry film thickness meet the D/C C W/R

requirements stated in the specification.