You are on page 1of 1

WORK SCHEDULE

PROJECT: Establishment of Monument Markers on the 50-meter Coastal Easement Along the Long Beach Area of the San Vicente Flagship TEZ
LOCATION: Long Beach Area, San Vicente, Palawan
Duration: 60.00 CD

Health & Safety, Temporary barracks (Rental Basis), Service Vehicle Operated Rental Rate
60 Days

Project
Billboard / Installation of Demobili
Mobiliza
Signboard Monument zation
tion
3.5 Days Markers 0.5 Days
0.5 Days
1 2 3 Permanent monuments and markers survey 4 Earthworks 5 6.5 Days 6 7
0 0 .5 .5 4 4 29 Days 33 33 20 Days 53 53 59.5 59.5 60 60

Stripping of Forms
6 Days

Concrete Works
20 Days

Prepared By: CHECKED AND VERIFIED BY: RECOMMENDING APPROVAL APPROVED:

ROYTHER P. PABLICO, CE.MP ARTHUR O. AÑONUEVO JEOFFREY L. MACALALAD GREGORY A. OLLER


Estimator Officer-in-Charge Officer-in-Charge Assistant Chief Operating Officer
Project Management Division Project Evaluation and Planning Department Architectural and Engineering Services Sector