Professional Documents
Culture Documents
One Line Protection and Metering Diagram For 400v MCCS With Single Bus Bar and Two XFMR Incomings
One Line Protection and Metering Diagram For 400v MCCS With Single Bus Bar and Two XFMR Incomings
GENERAL NOTES :
1. Refer to 400V Load Center and Motor Control Center Load Schedule for details
(number and rating) of outgoing feeders.
H H
2. Breakers shall be operated electrically or manually.Breaker status (close / test /
available) shall be monitored and controlled by DCS.
3. Refer to 400V Schematic Diagrams for details.
4. An Auto / Manual Switch shall be fixed on the switch board.The position of the
switch is monitored by DCS as well as transfer device.
5. In manual operating mode , the incomings breakers shall have DCS initiated
commands executed via transfer device (PLC). DCS shall monitor status of breaker
(close / test / available).
6. For bus transfer in auto operating mode, transfer device (PLC) shall control the
operation of incomings breakers. In manual operating mode Local and DCS shall
control the operation of breakers via transfer device (PLC). Live bus transfer shall
be make-before-break in both operating modes, for detail operation philosophy refer
G Technical Specification for 400V Load Centers and MCC. G
REFERENCES :
DQR/00/K/001b---004/SD/001 MAIN SINGE LINE DIAGRAM
DQR/00/K/BF----EP24/ES/101 ... 108 400V SCHEMATIC DIAGRAMS
F DQR/00/K/BF----EP24/ES/002 TECHNICAL SPECIFICATION FOR 400V LOAD F
CENTERS AND MCC
DQR/00/K/BF----EP24/EL/001 400V LOAD CENTER AND MOTOR CONTROL
CENTER LOAD SCHEDULE
E E
D D
Revision History
PROJECT
C C
DHI QAR COMBINED CYCLE
POWER PLANT PROJECT
NASIRIYAH, IRAQ
OWNER
M
E
B B
CONTRACT NO: 1
Cross Checked
Department Name Date Signature
12 11 10 9 8 7 6 5 4 3 2 1