FIRE FIGHTING TECHNICAL REPORT

Rev: 00

Effective Date: Oct,2023


‫مؤسسة الهدف واإلتقان للمقاوالت‬ Page 1 of 1

‫قسم أنظمة األمن والسالمة‬

CITY REGION: Dammam TR NO.:

PROJECT NAME: TBC DATE: 02-10-2023

BUILDING NO.: 53 UNIT NO.:

CLIENT CONTACT PERSON: Eng. Obay Saifeldin Bashir


Yes ☒ No ☐ (Please
TECHNICAL ISSUE REPORTED BY: Eng. Mohammed Saad ANY EVIDENCE/PHOTOS:
Attach)
REPORTED BY: Eng. Mohamed Saad

DETAILED DESCRIPTION (WHO, WHAT, WHEN, WHERE)


We have sent our maintenance team to buildings no. (53) to inspect the firefighting system and this is
❖ Topics Covered in the inspection:
• Duty pump.
• Jockey pump.
• Starting system.
• Electrical system.
• internal electronic parts in the pump control panel

❖ conclusions: THE FIRE FIGHTING SYSTEM IS OUT OF SERVICE DUE TO UNDERGROUND LEAKAGE

ROOT CAUSE ANALYSES (WHY, HOW)


• Corrosion.
• the Rust
• Incorrect Pipe Laying.
• Damaged Pipes and Joints.
• Wear and tear over the years

CORRECTIVE ACTION/ RECOMMENDATION


CORRECTIVE ACTION:
Some electronic and mechanical parts were changed
Recommendation:
• New underground pipelines (HDPE pipe).

NOTE / REMARKS
FIRE FIGHTING TECHNICAL REPORT
Rev: 00

Effective Date: Oct,2023


‫مؤسسة الهدف واإلتقان للمقاوالت‬ Page 2 of 1

‫قسم أنظمة األمن والسالمة‬