- DocumentNCTM-1000uploaded byJCS
- DocumentNCTM-2000uploaded byJCS
- Documentdensit manualuploaded byJCS
- Document80059110-BID-RAW MILL.pdfuploaded byJCS
- Document80058880-BID-Cement Mill.pdfuploaded byJCS
- DocumentApplication procedure ROCKHARD-90.docxuploaded byJCS
- DocumentApplication procedure ROCKHARD-90uploaded byJCS
- DocumentRockhard presentationuploaded byJCS
- DocumentRockhard Catalogueuploaded byJCS
- DocumentPLANT EQPT LIST BASED ON CRITICALITYuploaded byJCS
- DocumentInst DEPT OBJSuploaded byJCS
- DocumentCalibration Instruments INDEX_1 FINALuploaded byJCS
- DocumentINT. COMN. MTX-Inst.uploaded byJCS
- DocumentEXT. COMN. MTX-Inst.uploaded byJCS
- DocumentI-P-1.01-W-3 (kiln feed flowmeter).docuploaded byJCS
- DocumentI-P-1.01-W-4(NOX Analyser)uploaded byJCS
- DocumentI-P-1.01-W-6 (RTD Transimetter).docuploaded byJCS
- DocumentI-P-1.01-W-6 (RTD Transimetter)uploaded byJCS
- DocumentI-P-1.01-W-7(Weigh Feeder)uploaded byJCS
- DocumentI-P-1.01-W-8(O2 Analyser)uploaded byJCS
- DocumentI-P-1.01-W-9(Thermocouple Transmitter)uploaded byJCS
- DocumentI-P-1.01-W-12 (DP & Pressure Transmitter).docuploaded byJCS
- DocumentI-P-1.01-W-10(Weigh Bridge)uploaded byJCS
- DocumentI-P-1.01-W-12 (DP & Pressure Transmitter).docuploaded byJCS
- DocumentI-P-1.01-W-12 (DP & Pressure Transmitter).docuploaded byJCS
- DocumentI-P-1.01-W-13(Digtial Multimeter)uploaded byJCS
- DocumentI-P-1.01-W-14 (Pressure Calibrator)uploaded byJCS
- DocumentI-P-1.01-W-15(Universal Calibrator)uploaded byJCS
- DocumentStandard Operating Procedure for Particle Size Analyseruploaded byJCS
- DocumentI-P-1.01-W-19(Approved Sub Contractors)uploaded byJCS
- DocumentStandard Operating Procedure for Belt Weigheruploaded byJCS
- DocumentStandard Operating Procedure for Error less energy Managementuploaded byJCS
- DocumentStandard Operating Procedure for (MAINTENANCE SM)uploaded byJCS
- DocumentStandard Operating Procedure for (ELECTRONIC WASTE DISPOSAL)uploaded byJCS
- DocumentI-P-1.01-W-2(Packer Spouts).docuploaded byJCS
- DocumentI-P-1.01-W-1 (CO Analyser).docuploaded byJCS
- DocumentStandard Operating Procedure For Logic Modificationuploaded byJCS
- DocumentSMSM V3 R0 2019uploaded byJCS
- DocumentSMPRM V3 RO 2019uploaded byJCS
- DocumentQMSM V2 R1 2019.pdfuploaded byJCS
- DocumentIMSPM V2 R1 2019uploaded byJCS
- DocumentEMSM V2 R1 2019.pdfuploaded byJCS
- DocumentEMPR V2 R0 2018uploaded byJCS
- DocumentSOP-flows measuring work in various ductsuploaded byJCS
- DocumentSOP-Manometer operationuploaded byJCS
- DocumentSOP-Flue gas Analyzer Operationuploaded byJCS
- DocumentSOP-Anemometer Operationuploaded byJCS
- DocumentSOP-Digital Thermometer Operationuploaded byJCS
- DocumentSOP-Startup shutdown and operation of Cement Millsuploaded byJCS