Professional Documents
Culture Documents
السلامة فى عمليات الهدم
السلامة فى عمليات الهدم
HEALTH ADMINISTRATION
OSHA
.
( .....)
.
.
.
() .
.
.
) (PCBs
111
OSHA
:
.1
.2
.3
.4
.
.
(
)
.
112
OSHA
POWER
LINE
WATER
LINE
GAS
LINE
SEWER
LINE
.5
.
.6
.
.7
.
.8 1.8 ( 6)
.
.9
.
.11
.
.11
.
:
113
OSHA
:
Lead Based Painting
) (50 g/m3
( ).
:
(
)(HEPA Filters High Efficiency Particulate Air Filters
:
Silicosis
114
OSHA
:
6 ( 21)
.
( +) (
) ( )
.
3 ( 11)
115
OSHA
.
..
.
.
.
.
2.4 ( 8) .
0.6
( 2) .
Min
150PSF
Min 8
Min 1
Min 1
The canopy of
the bldg. being
demolished
should overhang
by minimum 8
.
.
116
OSHA
.
.
:
(
) .
.
.
.
.
.
.
.
.
6 ( 21)
.
.
:
1.05 ( 42)
.
117
OSHA
( )
1.05 ( 42)
1.8 ( 6).
25%
.
.
.
.
45
.
1.2 ( 48) .
.
) (CHUTE
.
118
OSHA
.
11 ( 4) 15 (6
)
.
.
119
OSHA
45
Height from floor to bottom of any
wall opening minimum 42 or fall
protection should be provided.
Max48
The openings of
the chutes shall
not exceed 48
When operations are NOT in progress, the area shall be closed off.
.
.
.
.
.
.
:
.
.
5 25 x ( 2 11 x)
120
OSHA
.
41 ( 16).
45 ( 18)
5 ( 2)
.
.
0.3
( 1)
.
:
.
.
.
:
/
.
.
:
/
:
-1
.
-2
121
OSHA
122
OSHA
STEP 1
/ :
-1
.
-2 .
38.
-3
.
-4
.
********************************************************
123