Saudi Aramco Inspection Checklist: Recorder / Indicator - Material Receiving SAIC-J-6016 24-Jul-18 Inst
Saudi Aramco Inspection Checklist: Recorder / Indicator - Material Receiving SAIC-J-6016 24-Jul-18 Inst
00 30-Jun-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Recorder / Indicator - Material Receiving SAIC-J-6016 24-Jul-18 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Schedule G
A3 New and Unused - Instrumentation materials shall be new and unused.
Sec. 2.1
Verify that the contractor or it's Saudi Aramco approved third party
Schedule Q
inspector performed the quality activities at the supplier and sub-supplier
A8 Att. III
locations as required by the inspection level assigned for the materials
3.2
and equipment identified in SAEP-1150 Inspection Requirements.
C Multi-Point Indicators and Multiplexers for Thermocouple & RTD based devises - Based Devices
Multipoint temperature indicators shall consist of a panel-mounted readout SAES-J-100
C1
and a means of selecting the desired thermocouple to display. Section 8.6.5.1
Signals from multipoint indicators or multiplexers shall not be used for SAES-J-100
C4
control. Section 8.6.5.4
REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract)
2. Schedule Q - Quality Requirements (Pro Forma Contract)
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material or services either meets appropriate designated standards or has been tested and found suitable for a specified purpose.
4. Labeled - Equipment or materials to which has been attached a label symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date: