SWT SR 350M3 01.07.2022
SWT SR 350M3 01.07.2022
PROJECT TITLE / DỰ ÁN
SỐ BẢN VẼ/ SHEET NUMBER TÊN BẢN VẼ/ DRAWING TITLE KEY PLAN
PREPARED BY
D-T-311 DETAIL OF TECHNOLOGY PIPING (XI)
D-T-312 DETAIL OF P-101 A/B
D-T-313 DETAIL OF P-105 A/B
D-T-314 DETAIL OF P-106 A/B/C (I)
D-T-315 DETAIL OF P-106 A/B/C (II) NGUYEN BA SON
Issued
Rev. Description
D-T-316 DETAIL OF B-101 A/B date
SHEET LIST
A1:
A3:
A-G-001
CLIENT / CHỦ ĐẦU TƯ
PIPE LEGEND
+0.000 LEVEL REFERENCE/ CAO ĐỘ SÀN THỂ HIỆN COLOR COLOR PIPE TYPE/ LOẠI ỐNG ABBREVIATIONS
L01 SERIAL NUMBER OF LEVEL/ TÊN CAO TRÌNH WASTE WATER PIPE/ ỐNG NƯỚC THẢI WW APPROVED BY:
PREPARED BY
A-D-01
SHEET REFERENCE NUMBER/ BẢN VẼ THỂ HIỆN
NGUYEN BA SON
_
date
MECHANICAL WORK
ENTRANCE WAY/ LỐI VÀO (CƠ KHÍ)
PROJECT TITLE / DỰ ÁN
KEY PLAN
MCC RM
2000
800
800
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2000
2,534
2,800
APPROVED BY:
GRIT
3,550
CHAMBER
1,400
OPEN
5,750
800
M.H
600
600
M.H M.H M.H M.H OPEN
OPEN OPEN OPEN OPEN
200
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
200800 500 800 500 800 900 900 2,500 600300
2,000
2,850
3,116
600 1,200 600
200800
200 2,550 800300 APPROVED BY:
600
OPEN OPEN M.H
15,950
15,950
OPEN
200800
OPEN
600 950
3,300
5,400
APPROVED BY:
2,800
200
200
600
M.H
200800 OPEN
800 1,500 PARK JONG SEOK
OPEN
3,500
3,500
PREPARED BY
600
M.H
OPEN
∅300
200800 800 400 800 300
1,200
600
600
M.H OPEN M.H M.H
OPEN OPEN OPEN
200
200
NGUYEN BA SON
800
800
Rev. Issued Description
date
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
B-M-101
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
1,1502001,1002001,100
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2FL+0,00
800
800
H
APPROVED BY:
W
3,550
FL
#1~3 SEPARATION
TANK
FL+0,00
5,750
FLOW CONTROL TANK
500 2 1 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
300
300
200
300
3 4
SLUDGE
2,000
15,950
3 FL + 3,500 250W x 250H
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
1,000 1,200
6 4 FL + 3,500 250W x 250H
4,700
3,300
TANK APPROVED BY:
200
450 DISINFECT &
8 FL + 3,500 300W x 300H
200 1,300
EFFLUENT PARK JONG SEOK
SEDIMENTATION TANK
3th CONTACT 700
2,300
PREPARED BY
AERATION TANK TANK
9 FL + 3,500 300W x 300H
3,500
3,500
300
300
10 14
12 13
425
∅600
BIO FILTER FILTER
SLUDGE PIT TANK TANK 11 FL + 0.00 200W x 200H NGUYEN BA SON
Issued
200
Rev. Description
date
800
SLEEVES PLAN
B-M-102
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
2000
SITE LOCATION / ĐỊA ĐIỂM
KEY PLAN
2000
S-101B S-102
4350
T-01
2800
2234
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS
S-105 1 GRIT CHAMBER T-01 7 SEDIMENTATION TANK T-07 APPROVED BY:
P-101 A/B
S-101A S-103
2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08
220
3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
360
300
T-02 A T-02 B T-02 B T-03
220
300
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
SM-101
B-101 A/B
200
915
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
T-12 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
2000
1000
MT-101 APPROVED BY:
P-107
T-06 A
T-04 S-102 BAR SCREEN P-104A/B SLUDGE PUMP
S-104
4700
900
B-101A/B BLOWER (VIBRATION PROOFING) M-104 SUPERNATANT RETURN PIPE
4100
MECHANICAL WORK
CR-101 SLUDGE SCRAPER DS-101 DEODORIZATION SYSTEM (CƠ KHÍ)
200 220 360 220 200 220 360 220 220 360 220 300
800
P-104 A/B P-105 A/B P-103A/B SLUDGE FEED PUMP PDOS-101 DEODORIZATION SYSTEM DWG. TITLE / TÊN BẢN VẼ
A1:
A3:
1 GENERAL EQUIPMENT PLAN
STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1 : 75
B-M-103
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
2000
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
APPROVED BY:
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS
2534
S-101B S-102
T-01
2800
1 GRIT CHAMBER T-01 7 SEDIMENTATION TANK T-07
4700
220
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
SM-101 4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
360
300
T-02 A T-02 B T-02 B T-03
6450
220
5 ANOXIC TANK T-05 11 SLUDGE PIT T-11
300
6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
915
APPROVED BY:
T-12
B-101 A/B
1000
T-06 B T-06 A
550 APPROVED BY:
SM-102 M-101A/B/C T PIPE EF-101 EXFOLIATION SYSTEM
T-05
MF-101 S-105 FM-101
4100
SLUDGE DRYER FLOW METER
600
MECHANICAL WORK
P-102 A/B
M-103 MEDIA EF-102 EXHAUST FAN (CƠ KHÍ)
P-103 A/B
1750
A1:
A3:
1 : 75 B-M-104
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
2000
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2000
774
APPROVED BY:
S-101B S-102
T-01
2800
2234
700 1150 1150 1150 700
1600
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS
220
2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
360
300
T-02 A T-02 B T-02 B T-03
3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
220
300
2001
P-101 A/B 4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
T-12
P-107 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
2350
1374
NO. EQUIPMENT NAME NO. EQUIPMENT NAME MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
500
640
640
SM-102
850
T-04
570
570
100 300
APPROVED BY:
570
T-06 B
SM-103 EXFOLIATION SYSTEM
M-101A/B/C T PIPE EF-101
570
570
500
570
570
570
PREPARED BY
T-05 MT-101 MEASURING TANK & MESH SCREEN P-106A/B/C EFFLUENT PUMP
500
570
570
640
640
1200
600 1200 600 550 1200 550 S-105 SLUDGE DRYER FM-101 FLOW METER
NGUYEN BA SON
B-101A/B BLOWER (VIBRATION PROOFING) M-104 SUPERNATANT RETURN PIPE Rev. Issued
date
Description
T-06 C
T-10 SM-102 MIXER (INCLUDE-LIFT WINCH) P-107 SLUDGE DISCHARGE PUMP
200 220 360 220 1400
P-106 A/B/C
200 125 275 275 125 SM-103A/B MIXER (INCLUDE-LIFT WINCH) M-105 AIR DIFFUSER
T-07
CR-101 500
P-102 A/B P-102A/B SLUDGE RETURN PUMP M-106 AIR DIFFUSER
ITEM / HẠNG MỤC
T-08 T-09
B-102A/B BLOWER (VIBRATION PROOFING) SF-101 SUPPLY FAN MECHANICAL WORK
(CƠ KHÍ)
P-103 A/B M-102 MEDIA EF-101 EXHAUST FAN DWG. TITLE / TÊN BẢN VẼ
T-11
M-103 MEDIA EF-102 EXHAUST FAN
EQUIPMENT PLAN FL+4.0M
A1:
A3:
1 : 75 B-M-105
CLIENT / CHỦ ĐẦU TƯ
11-11
D-T-311
PROJECT TITLE / DỰ ÁN
KEY PLAN
S-101B S-102
T-01
700 mmx350 mm
1-1 1-1
D-T-301 D-T-301
APPROVED BY:
P-101 A/B
S-101A S-103 SM-101
T-03
T-02 A T-02 B T-02 B
2-2 2-2
D-T-302 D-T-302
550 mmx350 mm
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
T-12
700 mmx350 mm
D-T-303 D-T-303
B-101 A/B
P-107
4-4 4-4
D-T-304 SM-102 D-T-304
T-04
T-06 A
T-06 B
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
SM-103
T-05
MF-101
5-5
216 mmø 165 mmø
D-T-305 5-5 PARK JONG SEOK
D-T-305 PREPARED BY
FL +4.800
CS - SUS304 - DN80
6-6
T-06 C
216 mmø D-T-306
P-106 A/B/C T-10
6-6
D-T-306 FL +6.300 NGUYEN BA SON
T-07 WW - SUS304 - DN80 Rev. Issued Description
216 mmø
date
CR-101
D-T-311 A3:
A MIDDLE PIPING PLAN FL+7.0M STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1 : 75 C-P-201
CLIENT / CHỦ ĐẦU TƯ
11-11
D-T-311
PROJECT TITLE / DỰ ÁN
KEY PLAN
S-101B S-102
T-01
1-1 1-1
D-T-301 D-T-301
APPROVED BY:
P-101 A/B
S-101A S-103 SM-101
T-12
P-107 WW - SUS304 - DN80
B-101 A/B
3-3 MT-101 3-3 APPROVED BY:
D-T-303 D-T-303
4-4 4-4
D-T-304 D-T-304
T-04
T-06 A
T-06 B
SM-102 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
SM-103
APPROVED BY:
WW - SUS304 - DN80
B-102 A/B WW - SUS304 - DN80
T-05
MF-101
5-5
216 mmø 165 mmø
D-T-305 5-5 PARK JONG SEOK
D-T-311 A3:
1 MIDDLE PIPING PLAN FL+6.6M STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1 : 75 C-P-202
CLIENT / CHỦ ĐẦU TƯ
11-11
D-T-311 PROJECT TITLE / DỰ ÁN
8-8 9-9 10-10
D-T-308 D-T-309 D-T-310
SITE LOCATION / ĐỊA ĐIỂM
KEY PLAN
775
A - SUS304 - DN40
1600
1-1 1-1
D-T-301 D-T-301
FL +3.500
4375
WW - SUS304 - DN150 A - SUS304 - DN40
WW - SUS304 - DN150 APPROVED BY:
WW - SUS304 - DN150
FL +3.500 SM-101
T-02 A T-02 B T-02 B FL +0.100
T-03
2-2 2-2
D-T-302
2000
P-101 A/B D-T-302
SD - SUS304 - DN80
FL +3.811
999
WW - SUS304 - DN150 A - SUS304 - DN40
T-12 FL +3.500
P-107
FL +0.100
3750
1375
1375
3-3 3-3
1001
D-T-303 D-T-303 APPROVED BY:
640
4-4 SM-102 4-4
850
D-T-304 D-T-304
T-04
570
500
T-06 B T-06 A
570
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
500
A - SUS304 - DN50
A - SUS304 - DN50
A - SUS304 - DN50
A - SUS304 - DN50
A - SUS304 - DN50
SM-103
570
500
500
APPROVED BY:
570
500
570
T-05
500
MF-101
570
5-5
500
D-T-305 5-5
640
550 1200 1200 550
D-T-305 PARK JONG SEOK
PREPARED BY
?
6-6
600 600 600 600
D-T-306
T-10
6-6 A - SUS304 - DN32
P-106 A/B/C
D-T-306
T-07 NGUYEN BA SON
T-06 C WW - SUS304 - DN200
CR-101 Rev. Issued Description
1150
date
T-08
P-102 A/B T-09
500 500
7-7
D-T-307
P-103 A/B
7-7 T-11
D-T-307 ITEM / HẠNG MỤC
MECHANICAL WORK
(CƠ KHÍ)
P-104 A/B P-105 A/B
DWG. TITLE / TÊN BẢN VẼ
D-T-309
DATED / HOÀN THÀNH SCALE / TỶ LỆ
11-11
D-T-311 A1:
2 MIDDLE PIPING PLAN FL+4.0M A3:
C-P-203
CLIENT / CHỦ ĐẦU TƯ
11-11
PROJECT TITLE / DỰ ÁN
D-T-311
2000
D-T-310 NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS KEY PLAN
1-1 1-1
D-T-301 D-T-301
WW - SUS304 - DN80
FL +5.150
T-12
P-107
APPROVED BY:
WW - SUS304 - DN80
B-101 A/B
3-3 MT-101 3-3
D-T-303 D-T-303
WW - SUS304 - DN150
APPROVED BY:
SM-103
B-102 A/B
WW - SUS304 - DN80
FL +6.400
P-106 A/B/C
6-6
NGUYEN BA SON
D-T-306
T-10 Rev. Issued Description
date
6-6 T-06 C
P-102 A/B
D-T-306
T-07
CR-101 FL +6.300
CS - SUS304 - DN50
T-08 T-09 WW - SUS304 - DN80
7-7
CS - SUS304 - DN80 ITEM / HẠNG MỤC
D-T-307
P-103 A/B MECHANICAL WORK
(CƠ KHÍ)
7-7 T-11
D-T-307 DWG. TITLE / TÊN BẢN VẼ
FL +0.000
CS - SUS304 - DN150
GENERAL PIPING PLAN
FL +2.875 P-104 A/B P-105 A/B
WW - SUS304 - DN200
1 GENERAL PIPING PLAN 10-10 STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1 : 75 D-T-310
C-P-204
CLIENT / CHỦ ĐẦU TƯ
2000
D-T-310 KEY PLAN
2000
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2754
T-01 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
1-1 1-1
D-T-301 FL +4.300 D-T-301 4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
WW - SUS304 - DN150 WW - SUS304 - DN65
FL +3.500 P-101 A/B 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11
4710
1280
WW - SUS304 - DN150 S-101A S-103
FL +3.500
650
6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
500
360
T-02 A T-02 B T-02 B T-03
2-2 2-2 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
D-T-302
400
400
D-T-302
SM-101 A
WW - SUS304 - DN80 D-T-312
400
FL +6.400
WW - SUS304 - DN80
FL +5.150
WW - SUS304 - DN80 APPROVED BY:
FL +4.454
T-12 B-101 A/B
WW - SUS304 - DN150
FL +3.500
3-3 MT-101 3-3
D-T-303 D-T-303
2100
P-107
WW - SUS304 - DN150 WW - SUS304 - DN150
FL +3.600
4-4 4-4 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
D-T-304 SM-102 D-T-304
T-04
T-06 A
T-06 B
14350
APPROVED BY:
2100
SM-103
B-102 A/B
WW - SUS304 - DN80
FL +6.400
WW - SUS304 - DN80
5-5
D-T-305 5-5
1476
D-T-305
1
P-106 A/B/C
D-T-314
6-6 NGUYEN BA SON
D-T-306 Issued
T-10 Rev.
date
Description
6-6 T-06 C
1700
FL +6.300
D-T-306
T-07 WW - SUS304 - DN80
275 275 1625
2000
CR-101
P-102 A/B
3650
T-08 T-09
7-7
ITEM / HẠNG MỤC
D-T-307
1800
T-11
D-T-307 D-T-313 DWG. TITLE / TÊN BẢN VẼ
2000
D-T-310 KEY PLAN
2000
A - SUS304 - DN40 CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
FL +0.100
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS
775
1 GRIT CHAMBER T-01 7 SEDIMENTATION TANK T-07
S-101B S-102 2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08 APPROVED BY:
T-01
1600
1-1 A - SUS304 - DN40 1-1 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
D-T-301 FL +0.100 D-T-301
1500 1500
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
S-101A S-103 SM-101 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11
T-02 A T-02 B T-02 B T-03 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
2-2 2-2 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
A - SUS304 - DN150
D-T-302 A - SUS304 - DN40 P-101 A/B D-T-302
FL +0.100
A - SUS304 - DN65
A - SUS304 - DN32 1
1000
FLT-12
+0.100
D-T-316
APPROVED BY:
P-107 MT-101
1000
FL +4.865
3-3 B-101 A/B 3-3
3750
D-T-303 D-T-303
A - SUS304 - DN50
A - SUS304 - DN200
550 1200 1200 550
640
T-06 A
T-06 B
570
APPROVED BY:
SM-103 1
570
B-102 A/B
D-T-317
570
A - SUS304 - DN50
570
A - SUS304 - DN50
A - SUS304 - DN50
PARK JONG SEOK
T-05
MF-101
PREPARED BY
570
FL +0.100
5-5
D-T-305 5-5
640
D-T-305
A - SUS304 - DN50
FL +0.100
A - SUS304 - DN32
FL +0.100 A - SUS304 - DN40 P-106 A/B/C
FL +6.333
1868 6-6 NGUYEN BA SON
D-T-306 Issued Description
T-10 Rev.
date
6-6 T-06 C A - SUS304 - DN50
P-102 A/B FL +6.327
D-T-306
T-07
CR-101
T-08 T-09
7-7 ITEM / HẠNG MỤC
D-T-307
1795
D-T-310 C-P-206
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
11-11
D-T-311
SITE LOCATION / ĐỊA ĐIỂM
9-9
8-8
D-T-309
D-T-308
10-10 KEY PLAN
2000
D-T-310
2000 2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08 CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
S-101B S-102 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11 APPROVED BY:
T-01
1-1 1-1 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
D-T-301 D-T-301
P-101 A/B
S-101A S-103 SM-101
T-02 A T-02 B T-02 B T-03 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
2-2 2-2
D-T-302 D-T-302
SD - SUS304 - DN80
FL +6.300
APPROVED BY:
CS - SUS304 - DN80
T-12 B-101 A/B CS - SUS304 - DN80
FL +6.300
3-3 MT-101 3-3
D-T-303 D-T-303
SD - SUS304 - DN80 P-107
FL +6.300 SM-103
B-102 A/B
CS - SUS304 - DN80
NGUYEN BA SON
FL +6.300 6-6
Issued
FL +6.300
D-T-306 Rev.
date
Description
T-10
6-6 T-06 C 200 162150
2400
P-106 A/B/C
D-T-306
T-07
CR-101
1 P-102 A/B
150
T-08 T-09
D-T-318 7-7 ITEM / HẠNG MỤC
CS - SUS304 - DN50
D-T-307 MECHANICAL WORK
P-103 A/B (CƠ KHÍ)
1 A1:
1 8-8 9-9 11-11
SLUDGE PIPING PLAN D-T-308 D-T-309 D-T-320 D-T-311
A3:
11-11
D-T-311
PROJECT TITLE / DỰ ÁN
2000
D-T-308 D-T-309 D-T-310
KEY PLAN
FL +0.226
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
T-01
700 mmx350 mm
1-1 1-1 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11 APPROVED BY:
D-T-301 FL +6.600
D-T-301
6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
550 mmx350 mm
T-12
FL +6.600
FL +6.600
APPROVED BY:
700 mmx350 mm
3-3 3-3
D-T-303 D-T-303
4-4 4-4
D-T-304 FL +3.099 D-T-304
T-04
T-06 A MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
T-06 B
APPROVED BY:
FL +6.426
FL +4.200
400 mmx350 mm
FL +6.400
T-05
D-T-305
FL +5.540
6-6
216 mmø D-T-306
T-10
6-6 T-06 C FL +6.400
NGUYEN BA SON
Issued
D-T-306 FL +6.400 Rev.
date
Description
T-07
216 mmø
T-08 T-09
7-7
D-T-307
ITEM / HẠNG MỤC
7-7 T-11 MECHANICAL WORK
D-T-307 (CƠ KHÍ)
DUCT PLAN
8-8 10-10
D-T-308 9-9 D-T-310 DATED / HOÀN THÀNH SCALE / TỶ LỆ
D-T-309
A1:
D-T-311
1 : 75 STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
C-P-208
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
MCC PANEL
2000
CABLE TRAY
800
800
APPROVED BY:
400W x 100H 2000
FL +6.500
3,550
5,750
M
SM-101 L/S
M M
1.5kw
200
APPROVED BY:
2,000
M M
P-107
5.5kw
FL +6.500 M
B-101A/B SM-102
200
M
15,950
15,950
B-102A/B
5.5kw
M
SM-103 APPROVED BY:
4,700
M M 0.75kw
3,300
CABLE TRAY
PDOS-101 200W x 100H
0.75kw
M
PARK JONG SEOK
FL +6.500
200
200
PREPARED BY
200 1,300
EF-102 M M M P-106A/B/C
M 1.5kw
FL +6.500 0.75kw
2,300
SF-101
1.5kw
P-102A/B
3,500
3,500
M M CR-101
0.75kw M 0.4kw NGUYEN BA SON
P-105A/B
Issued
2,000
1.5kw Rev. Description
1,000200
date
L/S
M M P-103A/B M M M M
0.75kw
CABLE TRAY P-104A/B
800
800
C-P-209
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
CONTROL ROOM
2200
WW - SUS304 - DN80
T-01
150
APPROVED BY:
2556
APPROVED BY:
4050
PREPARED BY
4850
100
300
NGUYEN BA SON
Issued
800 1150 200 1100 200 1100 200 4850 800 Rev.
date
Description
DETAIL OF TECHNOLOGY
PIPING (I)
A1:
A3:
D-T-301
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
165 mmø
165 mmø
165 mmø
WW - SUS304 - DN80
CONTROL ROOM A - SUS304 - DN40
2800
Lugged butterfly valve/ Van bướm tay gạt DN80 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
1758
Check valve/ Van 1 chiều DN80
T-01
APPROVED BY:
150
700
700
WW - SUS304 - DN150 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
WW - SUS304 - DN150
WW - SUS304 - DN150
WW - SUS304 - DN80
APPROVED BY:
A - SUS304 - DN40
4050
PREPARED BY
P-101 A/B
A - SUS304 - DN40
300
NGUYEN BA SON
MECHANICAL WORK
C-P-201 1 : 50 (CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (II)
A1:
A3:
D-T-302
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
2800
APPROVED BY:
150
WW - SUS304 - DN150
WW - SUS304 - DN150
A - SUS304 - DN32 APPROVED BY:
WW - SUS304 - DN80
A - SUS304 - DN40
4050
T-12 T-03
PREPARED BY
NGUYEN BA SON
3750 4850
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
D-T-303
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
CONTROL ROOM
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
APPROVED BY:
2800
2200
2100
2100
2100
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
150
APPROVED BY:
APPROVED BY:
PREPARED BY
300
NGUYEN BA SON
DETAIL OF TECHNOLOGY
PIPING (IV)
A1:
A3:
D-T-304
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
200
APPROVED BY:
1500
2800
2100
499
APPROVED BY:
800
150
APPROVED BY:
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
5-5 Section 5-5
DWG. TITLE / TÊN BẢN VẼ
C-P-201 1 : 50
DETAIL OF TECHNOLOGY
PIPING (V)
A1:
A3:
D-T-305
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
2800
600
APPROVED BY:
150
CS - SUS304 - DN80
CS - SUS304 - DN80 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
APPROVED BY:
T-10 T-07 T-06 C
4050
PREPARED BY
300
NGUYEN BA SON
DETAIL OF TECHNOLOGY
PIPING (VI)
A1:
A3:
D-T-306
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
2800
Lugged butterfly valve/ Van bướm tay gạt DN80 Lugged butterfly valve/ Van bướm tay gạt DN50
Check valve/ Van 1 chiều DN80 Check valve/ Van 1 chiều DN50 CONTROL ROOM
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
150
WW - SUS304 - DN80
CS - SUS304 - DN50
CS - SUS304 - DN50
CS - SUS304 - DN80
APPROVED BY:
T-07 T-11
4050
T-09 T-08
PREPARED BY
NGUYEN BA SON
300
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
D-T-307
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
CONTROL ROOM
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2100
T-01
APPROVED BY:
150
CS - SUS304 - DN80
A - SUS304 - DN65
4050
A - SUS304 - DN50
APPROVED BY:
300
800 1000 200 2300 200 4700 200 2000 200 3250 1100
PARK JONG SEOK
PREPARED BY
MECHANICAL WORK
(CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (VIII)
A1:
A3:
D-T-308
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
165 mmø
165 mmø
165 mmø
216 mmø
216 mmø
216 mmø
APPROVED BY:
CS - SUS304 - DN80
CONTROL ROOM
? - ? - DN?
APPROVED BY:
SD - SUS304 - DN80
SD - SUS304 - DN80
APPROVED BY:
PREPARED BY
300
MECHANICAL WORK
(CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (IX)
A1:
A3:
D-T-309
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
2800
CONTROL ROOM
WW - SUS304 - DN80
2000
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
150
APPROVED BY:
A - SUS304 - DN40
A - SUS304 - DN40
A - SUS304 - DN40
T-08 T-10 T-05 T-04 T-03
WW - SUS304 - DN80
CS - SUS304 - DN50
4050
A - SUS304 - DN50
APPROVED BY:
PREPARED BY
300
800 2000 200 1300 200 3300 200 1200 200 5750 800
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (X)
A1:
A3:
D-T-310
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
Gate valve/ Van cổng DN80 Gate valve/ Van cổng DN80
Gate valve/ Van cổng DN80 Gate valve/ Van cổng DN80
APPROVED BY:
WW - SUS304 - DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
WW - SUS304 - DN80 CONTROL ROOM
WW - SUS304 - DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
2100
2100
499
Check valve/ Van 1 chiều DN80
800
150
APPROVED BY:
WW - SUS304 - DN80
WW - SUS304 - DN80
APPROVED BY:
PREPARED BY
300
800 5750 200 1200 200 3300 200 1300 200 2000 800
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (XI)
A1:
A3:
D-T-311
CLIENT / CHỦ ĐẦU TƯ
KEY PLAN
2-2 2-2
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
D-T-312 D-T-312
WW - SUS304 - DN80
APPROVED BY:
P-101 A/B
WW - SUS304 - DN80
FL +4.800
1-1
D-T-312
APPROVED BY:
WW - SUS304 - DN80
WW - SUS304 - DN80
APPROVED BY:
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
A1:
1-1 Section 1-1 of P-101 A/B 2-2 Section 2-2 of P-101 A/B A3:
D-T-312
CLIENT / CHỦ ĐẦU TƯ
2-2
D-T-313
PROJECT TITLE / DỰ ÁN
WW - SUS304 - DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
Check valve/ Van 1 chiều DN80
SITE LOCATION / ĐỊA ĐIỂM
1-1 1-1
D-T-313 D-T-313 CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
WW - SUS304 - DN80
APPROVED BY:
P-105 A/B
WW - SUS304 - DN80
WW - SUS304 - DN80
APPROVED BY:
D-T-313
WW - SUS304 - DN80
B DETAIL OF P-105 A/B APPROVED BY:
C-P-205 1 : 20
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
D-T-313
CLIENT / CHỦ ĐẦU TƯ
1-1
D-T-314
PROJECT TITLE / DỰ ÁN
2-2 2-2
D-T-315 D-T-315 SITE LOCATION / ĐỊA ĐIỂM
KEY PLAN
WW - SUS304 - DN80
FL +6.600
WW - SUS304 - DN80
WW - SUS304 - DN80
Gate valve/ Van cổng DN80 WW - SUS304 - DN80
Gate valve/ Van cổng DN80 CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2400
APPROVED BY:
2100
FL +4.370
Lugged butterfly valve/ Van bướm tay gạt DN80
WW - SUS304 - DN80 Check valve/ Van 1 chiều DN80 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
3-3 3-3
D-T-315 FL +6.300 D-T-315 APPROVED BY:
WW - SUS304 - DN80
P-106 A/B/C
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
D-T-314
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
200
KEY PLAN
2200
APPROVED BY:
APPROVED BY:
2-2 Section 2-2 of P-106 A/B MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
D-T-314 1 : 30
APPROVED BY:
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
P-106 A/B/C
DWG. TITLE / TÊN BẢN VẼ
A1:
A3:
3-3 Section 3-3 of P-106 A/B
STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-314 1 : 30
D-T-315
CLIENT / CHỦ ĐẦU TƯ
1-1
D-T-316
PROJECT TITLE / DỰ ÁN
KEY PLAN
B-101 A/B
APPROVED BY:
2-2 2-2
D-T-316 D-T-316 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
A - SUS304 - DN80
A - SUS304 - DN80
2000
1758
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
1-1 Section 1-1 of B-101 A/B 2-2 Section 2-2 of B-101 A/B A1:
A3:
D-T-316 1 : 25 D-T-316 1 : 25 STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-316
CLIENT / CHỦ ĐẦU TƯ
2-2
D-T-317
PROJECT TITLE / DỰ ÁN
KEY PLAN
1-1 1-1
D-T-317 D-T-317
APPROVED BY:
APPROVED BY:
2-2
D-T-317
A - SUS304 - DN200
APPROVED BY:
1898
2048
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
1-1 Section 1-1 of B-102 A/B 2-2 Section 2-2 of B-102 A/B STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1-1
D-T-318
CS - SUS304 - DN50 PROJECT TITLE / DỰ ÁN
360
KEY PLAN
CS - SUS304 - DN80
CS - SUS304 - DN80
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
CS - SUS304 - DN80
3-3 P-102 A/B 3-3 CS - SUS304 - DN80
D-T-319 D-T-319 Lugged butterfly valve/ Van bướm tay gạt DN80
Check valve/ Van 1 chiều DN80
APPROVED BY:
2100
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
2-2 2-2
600
D-T-319 D-T-319
P-103 A/B
APPROVED BY:
APPROVED BY:
1-1
D-T-318
CS - SUS304 - DN80
CS - SUS304 - DN80
1 DETAIL OF P-102 A/B & P-103 A/B
C-P-207 1 : 25
PARK JONG SEOK
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
1-1 Section 1-1 of P-102 A/B & P-103 A/B STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-318 1 : 30 D-T-318
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
CS - SUS304 - DN80
CS - SUS304 - DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
2100
APPROVED BY:
Check valve/ Van 1 chiều DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
Check valve/ Van 1 chiều DN80
600
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
APPROVED BY:
CS - SUS304 - DN80
CS - SUS304 - DN80
CS - SUS304 - DN80
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
2-2 Section 2-2 of P-102 A/B & P-103 A/B 3-3 Section 3-3 of P-102 A/B & P-103 A/B
STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-318 1 : 30 D-T-318 1 : 30
D-T-319
CLIENT / CHỦ ĐẦU TƯ
KEY PLAN
500
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
1-1 1-1
D-T-320 P-104 A/B D-T-320
CS - SUS304 - DN50
APPROVED BY:
CS - SUS304 - DN50
CS - SUS304 - DN50
C-P-207 1 : 20
CS - SUS304 - DN50
APPROVED BY:
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
1-1 Section 1-1 of P-104 A/B 2-2 Section 2-2 of P-104 A/B DATED / HOÀN THÀNH SCALE / TỶ LỆ
A1:
D-T-320 1 : 25 D-T-320 1 : 25 A3:
D-T-320
CLIENT / CHỦ ĐẦU TƯ
1-1
D-T-321
PROJECT TITLE / DỰ ÁN
200
KEY PLAN
APPROVED BY:
3500
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
800
2344
1-1
D-T-321
PREPARED BY
1 DETAIL OF SEDIMENTATION TANK
C-P-205 1 : 30
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
300
DETAIL OF SEDIMENTATION
TANK
A1:
1-1 Section 1-1 of sedimentation tank A3:
D-T-321 1 : 40 STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-321