PROJECT TITLE / DỰ ÁN
SỐ BẢN VẼ/ SHEET NUMBER TÊN BẢN VẼ/ DRAWING TITLE KEY PLAN
PREPARED BY
D-T-311 DETAIL OF TECHNOLOGY PIPING (XI)
D-T-312 DETAIL OF P-101 A/B
D-T-313 DETAIL OF P-105 A/B
D-T-314 DETAIL OF P-106 A/B/C (I)
D-T-315 DETAIL OF P-106 A/B/C (II) NGUYEN BA SON
Issued
Rev. Description
D-T-316 DETAIL OF B-101 A/B date
SHEET LIST
A1:
A3:
A-G-001
CLIENT / CHỦ ĐẦU TƯ
PIPE LEGEND
+0.000 LEVEL REFERENCE/ CAO ĐỘ SÀN THỂ HIỆN COLOR COLOR PIPE TYPE/ LOẠI ỐNG ABBREVIATIONS
L01 SERIAL NUMBER OF LEVEL/ TÊN CAO TRÌNH WASTE WATER PIPE/ ỐNG NƯỚC THẢI WW APPROVED BY:
PREPARED BY
A-D-01
SHEET REFERENCE NUMBER/ BẢN VẼ THỂ HIỆN
NGUYEN BA SON
_
date
MECHANICAL WORK
ENTRANCE WAY/ LỐI VÀO (CƠ KHÍ)
PROJECT TITLE / DỰ ÁN
KEY PLAN
MCC RM
2000
800
800
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2000
2,534
2,800
APPROVED BY:
GRIT
3,550
CHAMBER
1,400
OPEN
5,750
800
M.H
600
600
M.H M.H M.H M.H OPEN
OPEN OPEN OPEN OPEN
200
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
200800 500 800 500 800 900 900 2,500 600300
2,000
2,850
3,116
600 1,200 600
200800
200 2,550 800300 APPROVED BY:
600
OPEN OPEN M.H
15,950
15,950
OPEN
200800
OPEN
600 950
3,300
5,400
APPROVED BY:
2,800
200
200
600
M.H
200800 OPEN
800 1,500 PARK JONG SEOK
OPEN
3,500
3,500
PREPARED BY
600
M.H
OPEN
∅300
200800 800 400 800 300
1,200
600
600
M.H OPEN M.H M.H
OPEN OPEN OPEN
200
200
NGUYEN BA SON
800
800
Rev. Issued Description
date
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
B-M-101
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
1,1502001,1002001,100
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2FL+0,00
800
800
H
APPROVED BY:
W
3,550
FL
#1~3 SEPARATION
TANK
FL+0,00
5,750
FLOW CONTROL TANK
500 2 1 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
300
300
200
300
3 4
SLUDGE
2,000
15,950
3 FL + 3,500 250W x 250H
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
1,000 1,200
6 4 FL + 3,500 250W x 250H
4,700
3,300
TANK APPROVED BY:
200
450 DISINFECT &
8 FL + 3,500 300W x 300H
200 1,300
EFFLUENT PARK JONG SEOK
SEDIMENTATION TANK
3th CONTACT 700
2,300
PREPARED BY
AERATION TANK TANK
9 FL + 3,500 300W x 300H
3,500
3,500
300
300
10 14
12 13
425
∅600
BIO FILTER FILTER
SLUDGE PIT TANK TANK 11 FL + 0.00 200W x 200H NGUYEN BA SON
Issued
200
Rev. Description
date
800
SLEEVES PLAN
B-M-102
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
2000
SITE LOCATION / ĐỊA ĐIỂM
KEY PLAN
2000
2534
S-101B S-102
4350
T-01
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS
1400
APPROVED BY:
P-101 A/B
S-101A S-103
2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08
SM-101
4645
220
3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
360
300
T-02 A T-02 B T-02 B T-03
300
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
200
2152
1000 3962
500
1000 3962 S-101A/B BAR SCREEN AL-101 SCUM SKIMMER PUMP
300
SM-102
T-04 S-102 BAR SCREEN P-104A/B SLUDGE PUMP
100 300
T-06 A
T-06 B
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
S-103 BAR SCREEN BF-101 BIO FILTER SYSTEM
4036
4700
NGUYEN BA SON
T-07 Issued
3720
Rev. Description
CR-101 325 275 275 1625 P-102A/B SLUDGE RETURN PUMP M-106 AIR DIFFUSER date
360
MECHANICAL WORK
CR-101 SLUDGE SCRAPER DS-101 DEODORIZATION SYSTEM (CƠ KHÍ)
420 360 220 420 360 520
800
P-104 A/B P-105 A/B P-103A/B SLUDGE FEED PUMP PDOS-101 DEODORIZATION SYSTEM DWG. TITLE / TÊN BẢN VẼ
A1:
A3:
1 GENERAL EQUIPMENT PLAN
STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1 : 75
B-M-103
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
2000
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
APPROVED BY:
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS
2534
S-101B S-102
T-01
2800
1 GRIT CHAMBER T-01 7 SEDIMENTATION TANK T-07
4945
S-101A S-103 SM-101
220
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
360
300
T-02 A T-02 B T-02 B T-03
220
5 ANOXIC TANK T-05 11 SLUDGE PIT T-11
300
6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
2152
APPROVED BY:
T-12
P-107
1000 3962
NO. EQUIPMENT NAME NO. EQUIPMENT NAME
B-101 A/B
1895 MT-101
S-101A/B BAR SCREEN AL-101 SCUM SKIMMER PUMP
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
S-102 BAR SCREEN P-104A/B SLUDGE PUMP
T-06 A
T-06 B APPROVED BY:
SM-102 M-101A/B/C T PIPE EF-101 EXFOLIATION SYSTEM
B-102 A/B
300 300 950
1000 3962
MT-101 MEASURING TANK & MESH SCREEN P-106A/B/C EFFLUENT PUMP
PARK JONG SEOK
6700
S-104 SLUDGE THICKENER CL-101 CHLORINATOR PREPARED BY
PDOS-101 T-05
MF-101 S-105 FM-101
SLUDGE DRYER FLOW METER
950
592
3674
B-101A/B BLOWER (VIBRATION PROOFING) M-104 SUPERNATANT RETURN PIPE
SM-102 MIXER (INCLUDE-LIFT WINCH) P-107 SLUDGE DISCHARGE PUMP NGUYEN BA SON
125 275 275 125 1400 Rev. Issued Description
date
777
SM-103A/B MIXER (INCLUDE-LIFT WINCH) M-105 AIR DIFFUSER
T-10
T-06 C P-102A/B SLUDGE RETURN PUMP M-106 AIR DIFFUSER
420 360 220
P-106 A/B/C
T-07 4450 B-102A/B BLOWER (VIBRATION PROOFING) SF-101 SUPPLY FAN
CR-101
3720
P-102 A/B
M-102 MEDIA EF-101 EXHAUST FAN ITEM / HẠNG MỤC
T-08 T-09
MECHANICAL WORK
M-103 MEDIA EF-102 EXHAUST FAN (CƠ KHÍ)
P-103 A/B
1750
1750 1750
T-11
P-103A/B SLUDGE FEED PUMP PDOS-101 DEODORIZATION SYSTEM EQUIPMENT PLAN FL+7.0M
220 360 220 400 220 360 220 300
A1:
A3:
1 : 75 B-M-104
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
2000
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2000
APPROVED BY:
S-101B S-102
T-01
360
T-02 A T-02 B T-02 B T-03
3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
2636
P-107 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
B-101 A/B
MT-101
NO. EQUIPMENT NAME NO. EQUIPMENT NAME MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
700
800
850
APPROVED BY:
T-06 B
SM-103 EXFOLIATION SYSTEM
M-101A/B/C T PIPE EF-101
550
500
550
PREPARED BY
T-05 MT-101 MEASURING TANK & MESH SCREEN P-106A/B/C EFFLUENT PUMP
500
MF-101
550
700
T-06 C
T-10 SM-102 MIXER (INCLUDE-LIFT WINCH) P-107 SLUDGE DISCHARGE PUMP
420 360 1620
P-106 A/B/C
SM-103A/B MIXER (INCLUDE-LIFT WINCH) M-105 AIR DIFFUSER
T-07
CR-101 500
P-102 A/B P-102A/B SLUDGE RETURN PUMP M-106 AIR DIFFUSER
ITEM / HẠNG MỤC
T-08 T-09
B-102A/B BLOWER (VIBRATION PROOFING) SF-101 SUPPLY FAN MECHANICAL WORK
(CƠ KHÍ)
T-11
M-103 MEDIA EF-102 EXHAUST FAN
320
420 360 220 200 420 360 520 CR-101 SLUDGE SCRAPER DS-101 DEODORIZATION SYSTEM
P-104 A/B P-105 A/B
P-103A/B SLUDGE FEED PUMP PDOS-101 DEODORIZATION SYSTEM DATED / HOÀN THÀNH SCALE / TỶ LỆ
A1:
A3:
1 : 75 B-M-105
CLIENT / CHỦ ĐẦU TƯ
11-11
D-T-311
PROJECT TITLE / DỰ ÁN
WW - SUS304 - DN80
Flow meter/ Đồng hồ đo lưu lượng DN65
KEY PLAN
S-101B S-102
T-01
700 mmx350 mm
1-1 1-1
D-T-301 D-T-301
APPROVED BY:
WW - SUS304 - DN80
P-101 A/B FL +4.800
550 mmx350 mm
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
T-12
P-107 A - SUS304 - DN65
FL +6.300
700 mmx350 mm
B-101 A/B
3-3 MT-101 3-3 APPROVED BY:
D-T-303 D-T-303
4-4 4-4
D-T-304 SM-102 D-T-304
T-04
T-06 A
T-06 B
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
SM-103
APPROVED BY:
CS - SUS304 - DN80
CS - SUS304 - DN80
CS - SUS304 - DN80 216 mmø 165 mmø
T-05
MF-101
5-5
D-T-305 5-5 PARK JONG SEOK
D-T-305 PREPARED BY
CS - SUS304 - DN80
CS - SUS304 - DN50
CS - SUS304 - DN80
P-106 A/B/C
216 mmø
6-6
D-T-306
T-10
6-6 T-06 C
P-102 A/B
D-T-306 FL +6.600 NGUYEN BA SON
T-07 Issued Description
WW - SUS304 - DN80 Rev.
216 mmø
date
CR-101 FL +4.300
WW - SUS304 - DN80
T-08 T-09
7-7
D-T-307
P-103 A/B
D-T-311 A3:
A MIDDLE PIPING PLAN FL+7.0M STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1 : 75 C-P-201
CLIENT / CHỦ ĐẦU TƯ
11-11
D-T-311
PROJECT TITLE / DỰ ÁN
WW - SUS304 - DN80
Flow meter/ Đồng hồ đo lưu lượng DN65
KEY PLAN
S-101B S-102
T-01
1-1 1-1
D-T-301 D-T-301
APPROVED BY:
WW - SUS304 - DN80
P-101 A/B FL +4.800
T-12
P-107 A - SUS304 - DN65
FL +6.300
B-101 A/B
3-3 MT-101 3-3 APPROVED BY:
D-T-303 D-T-303
4-4 4-4
D-T-304 SM-102 D-T-304
T-04
T-06 A
T-06 B
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
SM-103
FL +4.200
FL +4.200
APPROVED BY:
CS - SUS304 - DN80
CS - SUS304 - DN80
CS - SUS304 - DN80 216 mmø 165 mmø
T-05
MF-101
5-5
D-T-305 5-5 PARK JONG SEOK
D-T-305 PREPARED BY
CS - SUS304 - DN80
CS - SUS304 - DN50
CS - SUS304 - DN80
P-106 A/B/C
6-6
D-T-306
T-10
6-6 T-06 C
P-102 A/B
D-T-306 NGUYEN BA SON
T-07 Rev. Issued Description
216 mmø
date
CR-101 FL +4.300
WW - SUS304 - DN80
T-08 T-09
7-7
D-T-307
P-103 A/B
D-T-311 A3:
1 MIDDLE PIPING PLAN FL+6.6M STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1 : 75 C-P-202
CLIENT / CHỦ ĐẦU TƯ
11-11
D-T-311 PROJECT TITLE / DỰ ÁN
8-8 9-9 10-10
D-T-308 D-T-309 D-T-310
SITE LOCATION / ĐỊA ĐIỂM
KEY PLAN
1000
FL +3.500
WW - SUS304 - DN150 A - SUS304 - DN40
WW - SUS304 - DN150 P-101 A/B APPROVED BY:
WW - SUS304 - DN150 S-101A S-103
FL +3.500 SM-101
FL +0.100
2000
D-T-302
1000
T-12 A - SUS304 - DN40 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
WW - SUS304 - DN150
FL +3.500
SD - SUS304 - DN80 P-107
FL +3.900 FL +0.100
1375
B-101 A/B
3-3 3-3
1000
MT-101
D-T-303 D-T-303 APPROVED BY:
700
4-4 4-4
850
D-T-304 SM-102 D-T-304
T-04
T-06 A
550
T-06 B
500
550
500
A - SUS304 - DN50
A - SUS304 - DN50
A - SUS304 - DN50
A - SUS304 - DN50
A - SUS304 - DN50
SM-103
550
500
B-102 A/B
500
APPROVED BY:
550
500
550
T-05
500
MF-101
550
5-5
500
D-T-305 5-5
1200
700
550 1200 550
D-T-305 PARK JONG SEOK
PREPARED BY
P-106 A/B/C
6-6
600 600 600 600
D-T-306
T-10
6-6 A - SUS304 - DN32
D-T-306
T-07 NGUYEN BA SON
T-06 C WW - SUS304 - DN200
CR-101 Rev. Issued Description
1150
date
7-7 T-11
D-T-307 ITEM / HẠNG MỤC
MECHANICAL WORK
(CƠ KHÍ)
P-104 A/B P-105 A/B
DWG. TITLE / TÊN BẢN VẼ
D-T-309
DATED / HOÀN THÀNH SCALE / TỶ LỆ
11-11
D-T-311 A1:
2 MIDDLE PIPING PLAN FL+4.0M A3:
C-P-203
CLIENT / CHỦ ĐẦU TƯ
11-11
PROJECT TITLE / DỰ ÁN
D-T-311
2000
D-T-310 NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS KEY PLAN
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10 CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
1-1 1-1
D-T-301 D-T-301
P-101 A/B
S-101A S-103 SM-101
WW - SUS304 - DN80
FL +5.150
T-12
P-107
APPROVED BY:
WW - SUS304 - DN80
B-101 A/B
3-3 MT-101 3-3
D-T-303 D-T-303
WW - SUS304 - DN150
APPROVED BY:
SM-103
B-102 A/B
SD - SUS304 - DN80
FL +6.400
T-08 T-09
7-7
ITEM / HẠNG MỤC
D-T-307
P-103 A/B MECHANICAL WORK
(CƠ KHÍ)
7-7 T-11
D-T-307 DWG. TITLE / TÊN BẢN VẼ
FL +0.000
CS - SUS304 - DN150
FL +6.300 GENERAL PIPING PLAN
FL +2.875 P-104 A/B P-105 A/B
WW - SUS304 - DN200 CS - SUS304 - DN50
1 GENERAL PIPING PLAN 10-10 STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1 : 75 D-T-310
C-P-204
CLIENT / CHỦ ĐẦU TƯ
2000
D-T-310 KEY PLAN
WW - SUS304 - DN80
Flow meter/ Đồng hồ đo lưu lượng DN65
2000
NO. CATEGORIES ABBREVIATIONS No. CATEGORIES ABBREVIATIONS CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
1600
1557 3773 2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08
2534
S-101B S-102
2610
APPROVED BY:
T-01 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
300 200
1-1 1-1
D-T-301 D-T-301 4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
FL +6.300 1280 3415
WW - SUS304 - DN150
FL +3.500 FL +4.300 P-101 A/B 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11
WW - SUS304 - DN150 S-101A S-103 WW - SUS304 - DN65
FL +3.500 WW - SUS304 - DN80
220
650
FL +6.400 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
500
360
135
T-02 A T-02 B T-02 B T-03
2-2 2-2
292 220
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
D-T-302
400
400
SM-101 D-T-302
A
2100
WW - SUS304 - DN80
D-T-312
400
550 FL +5.150
P-107
WW - SUS304 - DN80 APPROVED BY:
FL +4.454
T-12
WW - SUS304 - DN150
FL +3.500 B-101 A/B
3-3 MT-101 3-3
D-T-303 400 D-T-303
2100
WW - SUS304 - DN150
WW - SUS304 - DN150
4-4 FL +3.600
405 4-4 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
D-T-304 SM-102 D-T-304
T-04
T-06 A
T-06 B
APPROVED BY:
2100
SM-103
12750
WW - SUS304 - DN80
FL +6.400
WW - SUS304 - DN80
B-102 A/B FL +6.600
WW - SUS304 - DN80
D-T-305 5-5
1476
D-T-305
1
150
P-106 A/B/C
D-T-314
6-6 NGUYEN BA SON
D-T-306 Issued
T-10 Rev.
date
Description
6-6 T-06 C
1700
1700
P-102 A/B
D-T-306
2000
7-7
ITEM / HẠNG MỤC
D-T-307
1800
1800
7-7 T-11 B
D-T-307 D-T-313 DWG. TITLE / TÊN BẢN VẼ
2000
D-T-310 KEY PLAN
2000
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
1375
A - SUS304 - DN40
FL +0.100
1 GRIT CHAMBER T-01 7 SEDIMENTATION TANK T-07
500 1300 1300 1300 450
S-101B S-102 2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08 APPROVED BY:
T-01
1-1 A - SUS304 - DN40 1-1 3 FLOW CONTROL TANK T-03 9 FILTER TANK T-09
D-T-301 FL +0.100 D-T-301
1000
1500 1500
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
S-101A S-103 SM-101 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11
T-02 A T-02 B T-02 B T-03 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
2-2 2-2 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
D-T-302
2000
A - SUS304 - DN40 P-101 A/B D-T-302
FL +0.100
A - SUS304 - DN32 1
1000
T-12 FL +0.100
D-T-316
APPROVED BY:
A - SUS304 - DN65
B-101 A/B
FL +6.300
P-107 MT-101
1000
3-3 3-3
550 1300 1300 600
D-T-303 FL +6.252 D-T-303
A - SUS304 - DN32 A - SUS304 - DN150
FL +6.315 550 1200 1200 550
700
T-06 B
550
APPROVED BY:
SM-103 1
550
D-T-317
A - SUS304 - DN200
B-102 A/B
550
A - SUS304 - DN50
550
A - SUS304 - DN50
A - SUS304 - DN50
PARK JONG SEOK
T-05
FL +0.100
MF-101
550
PREPARED BY
5-5
D-T-305 5-5
700
D-T-305
A - SUS304 - DN50
FL +0.100
A - SUS304 - DN32
FL +0.100 A - SUS304 - DN40 P-106 A/B/C
FL +6.333
2050 6-6 NGUYEN BA SON
D-T-306 Issued Description
T-10 Rev.
date
6-6 T-06 C A - SUS304 - DN50
P-102 A/B FL +0.747
D-T-306
T-07
CR-101
T-08 T-09
7-7 ITEM / HẠNG MỤC
D-T-307
1795
D-T-310 C-P-206
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
11-11
D-T-311
SITE LOCATION / ĐỊA ĐIỂM
9-9
8-8
D-T-309
D-T-308
10-10 KEY PLAN
2000
D-T-310
2000 2 SEPARATION TANK T-02 A/B/C 8 BIO FILTER TANK T-08 CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
S-101B S-102 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11 APPROVED BY:
T-01
1-1 1-1 6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
D-T-301 D-T-301
P-101 A/B
S-101A S-103 SM-101
T-02 A T-02 B T-02 B T-03 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
2-2 2-2
D-T-302 D-T-302
T-12
P-107 APPROVED BY:
906
150
1400
T-04
T-06 A
2400
T-06 B
2356
APPROVED BY:
SM-103
SD - SUS304 - DN80
B-102 A/B FL +6.400
5-5
150150150
D-T-305 5-5
CS - SUS304 - DN80 D-T-305
CS - SUS304 - DN80
CS - SUS304 - DN50
6900
FL +6.300
P-106 A/B/C NGUYEN BA SON
FL +6.300 6-6
FL +6.300 Issued
D-T-306 Rev.
date
Description
T-10
6-6 T-06 C 162 200 200
2400
D-T-306
T-07
CR-101
1 P-102 A/B
1312 400
T-08 T-09
D-T-318 7-7 ITEM / HẠNG MỤC
1 A1:
1 8-8 9-9 11-11
SLUDGE PIPING PLAN D-T-308 D-T-309 D-T-320 D-T-311
A3:
11-11
D-T-311
PROJECT TITLE / DỰ ÁN
2000
D-T-308 D-T-309 D-T-310
KEY PLAN
FL +6.600
4 ANAEROBIC TANK T-04 10 DISIFECT & EFFLUENT TANK T-10
T-01
700 mmx350 mm
1-1 1-1 5 ANOXIC TANK T-05 11 SLUDGE PIT T-11 APPROVED BY:
D-T-301 FL +6.600
D-T-301
6 CONTACT AERATION TANK T-06 A/B/C 12 SLUDGE STORAGE TANK T-12
550 mmx350 mm
T-12
FL +6.600
FL +6.600
APPROVED BY:
700 mmx350 mm
3-3 3-3
D-T-303 D-T-303
FL +6.426
4-4 4-4
D-T-304 D-T-304
T-04
T-06 A MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
T-06 B
APPROVED BY:
FL +4.200 FL +6.426
FL +6.400
400 mmx350 mm
D-T-305
T-07
216 mmø
T-08 T-09
7-7
D-T-307
ITEM / HẠNG MỤC
7-7 T-11 MECHANICAL WORK
D-T-307 (CƠ KHÍ)
DUCT PLAN
8-8 10-10
D-T-308 9-9 D-T-310 DATED / HOÀN THÀNH SCALE / TỶ LỆ
D-T-309
A1:
D-T-311
1 : 75 STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
C-P-208
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
MCC PANEL
2000
CABLE TRAY
800
800
APPROVED BY:
400W x 100H 2000
FL +6.500
3,550
5,750
M
SM-101 L/S
M M
1.5kw
200
APPROVED BY:
2,000
M M
P-107
5.5kw
FL +6.500 M
B-101A/B SM-102
200
M
15,950
15,950
B-102A/B
5.5kw
M
SM-103 APPROVED BY:
4,700
M M 0.75kw
3,300
CABLE TRAY
PDOS-101 200W x 100H
0.75kw
M
PARK JONG SEOK
FL +6.500
200
200
PREPARED BY
200 1,300
EF-102 M M M P-106A/B/C
M 1.5kw
FL +6.500 0.75kw
2,300
SF-101
1.5kw
P-102A/B
3,500
3,500
M M CR-101
0.75kw M 0.4kw NGUYEN BA SON
P-105A/B
Issued
2,000
1.5kw Rev. Description
1,000200
date
L/S
M M P-103A/B M M M M
0.75kw
CABLE TRAY P-104A/B
800
800
C-P-209
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2100
WW - SUS304 - DN80
2200
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
T-01
150
APPROVED BY:
818 836 3228
APPROVED BY:
4050
PREPARED BY
500 1300 1300 1300 450
100
300
NGUYEN BA SON
Issued
800 1150 200 1100 200 1100 200 4850 800 Rev.
date
Description
DETAIL OF TECHNOLOGY
PIPING (I)
A1:
A3:
D-T-301
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
165 mmø
165 mmø
165 mmø
WW - SUS304 - DN80
WW - SUS304 - DN80 A - SUS304 - DN40
2800
CONTROL ROOM
T-01
APPROVED BY:
150
700
700
WW - SUS304 - DN150 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
WW - SUS304 - DN150
WW - SUS304 - DN150
WW - SUS304 - DN80
APPROVED BY:
A - SUS304 - DN40
4050
PREPARED BY
P-101 A/B
A - SUS304 - DN40
300
NGUYEN BA SON
MECHANICAL WORK
C-P-201 1 : 50 (CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (II)
A1:
A3:
D-T-302
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
APPROVED BY:
150
WW - SUS304 - DN150
WW - SUS304 - DN150
A - SUS304 - DN32
APPROVED BY:
WW - SUS304 - DN80
A - SUS304 - DN40
4050
T-12 T-03
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
D-T-303
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
CONTROL ROOM
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
APPROVED BY:
2800
2100
2100
2100
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
150
APPROVED BY:
APPROVED BY:
PREPARED BY
300
NGUYEN BA SON
DETAIL OF TECHNOLOGY
PIPING (IV)
A1:
A3:
D-T-304
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
200
APPROVED BY:
1500
2800
2100
500
APPROVED BY:
800
150
APPROVED BY:
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
5-5 Section 5-5
DWG. TITLE / TÊN BẢN VẼ
C-P-201 1 : 50
DETAIL OF TECHNOLOGY
PIPING (V)
A1:
A3:
D-T-305
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
2800
2100
2100
CS - SUS304 - DN80
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
600
600
APPROVED BY:
150
CS - SUS304 - DN80
WW - SUS304 - DN80 CS - SUS304 - DN80 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
WW - SUS304 - DN80
WW - SUS304 - DN80
APPROVED BY:
T-10 T-07 T-06 C
4050
PREPARED BY
300
NGUYEN BA SON
DETAIL OF TECHNOLOGY
PIPING (VI)
A1:
A3:
D-T-306
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
2800
Lugged butterfly valve/ Van bướm tay gạt DN80 Lugged butterfly valve/ Van bướm tay gạt DN50
Check valve/ Van 1 chiều DN80 Check valve/ Van 1 chiều DN50 CONTROL ROOM
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
150
WW - SUS304 - DN80
CS - SUS304 - DN50
CS - SUS304 - DN50
CS - SUS304 - DN80
APPROVED BY:
T-07 T-11
4050
T-09 T-08
PREPARED BY
NGUYEN BA SON
300
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
D-T-307
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
CONTROL ROOM
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
2100
2100
T-01
APPROVED BY:
150
CS - SUS304 - DN80
CS - SUS304 - DN80
A - SUS304 - DN65
4050
A - SUS304 - DN50
APPROVED BY:
300
800 1000 200 2300 200 4700 200 2000 200 3250 1100
PARK JONG SEOK
PREPARED BY
MECHANICAL WORK
(CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (VIII)
A1:
A3:
D-T-308
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
165 mmø
165 mmø
165 mmø
216 mmø
216 mmø
216 mmø
APPROVED BY:
CS - SUS304 - DN80
CONTROL ROOM
SD - SUS304 - DN80
APPROVED BY:
SD - SUS304 - DN80
SD - SUS304 - DN80
APPROVED BY:
PREPARED BY
300
MECHANICAL WORK
(CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (IX)
A1:
A3:
D-T-309
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
200
APPROVED BY:
2800
CONTROL ROOM
WW - SUS304 - DN80
APPROVED BY:
A - SUS304 - DN40
A - SUS304 - DN40
A - SUS304 - DN40
T-08 T-10 T-05 T-04 T-03
WW - SUS304 - DN80
CS - SUS304 - DN50
4050
A - SUS304 - DN50
APPROVED BY:
PREPARED BY
300
800 2000 200 1300 200 3300 200 1200 200 5750 800
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (X)
A1:
A3:
D-T-310
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
WW - SUS304 - DN80
Gate valve/ Van cổng DN80 Gate valve/ Van cổng DN80
Gate valve/ Van cổng DN80 Gate valve/ Van cổng DN80
APPROVED BY:
WW - SUS304 - DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
WW - SUS304 - DN80 CONTROL ROOM
WW - SUS304 - DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
Check valve/ Van 1 chiều DN80
500
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
800
150
APPROVED BY:
WW - SUS304 - DN80
WW - SUS304 - DN80
APPROVED BY:
PREPARED BY
300
800 5750 200 1200 200 3300 200 1300 200 2000 800
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
DETAIL OF TECHNOLOGY
PIPING (XI)
A1:
A3:
D-T-311
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
WW - SUS304 - DN80
KEY PLAN
WW - SUS304 - DN80
2-2 2-2
D-T-312 D-T-312 CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
WW - SUS304 - DN80
WW - SUS304 - DN80
APPROVED BY:
P-101 A/B
1-1
D-T-312
APPROVED BY:
WW - SUS304 - DN80
WW - SUS304 - DN80
APPROVED BY:
WW - SUS304 - DN80
PARK JONG SEOK
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
A1:
1-1 Section 1-1 of P-101 A/B 2-2 Section 2-2 of P-101 A/B A3:
D-T-312
CLIENT / CHỦ ĐẦU TƯ
2-2
D-T-313
PROJECT TITLE / DỰ ÁN
WW - SUS304 - DN80
KEY PLAN
100
1-1 1-1 APPROVED BY:
D-T-313 P-105 A/B D-T-313
WW - SUS304 - DN80
WW - SUS304 - DN80
APPROVED BY:
D-T-313
WW - SUS304 - DN80
B DETAIL OF P-105 A/B APPROVED BY:
C-P-205 1 : 20
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
D-T-313
CLIENT / CHỦ ĐẦU TƯ
1-1
D-T-314
PROJECT TITLE / DỰ ÁN
2-2 2-2
D-T-315 D-T-315 SITE LOCATION / ĐỊA ĐIỂM
KEY PLAN
2400
APPROVED BY:
FL +6.600
Gate valve/ Van cổng DN80
500
Lugged butterfly valve/ Van bướm tay gạt DN80
500 500 Check valve/ Van 1 chiều DN80 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
800
P-106 A/B/C
3-3 3-3
D-T-315 125 550 125 WW - SUS304 - DN80 D-T-315 APPROVED BY:
100
FL +4.300
WW - SUS304 - DN80
FL +4.300
WW - SUS304 - DN80
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
D-T-314
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
200
KEY PLAN
WW - SUS304 - DN80
Lugged butterfly valve/ Van bướm tay gạt DN80 Lugged butterfly valve/ Van bướm tay gạt DN80
Check valve/ Van 1 chiều DN80 Check valve/ Van 1 chiều DN80
2200
APPROVED BY:
600
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
2-2 Section 2-2 of P-106 A/B MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
D-T-314 1 : 30
APPROVED BY:
WW - SUS304 - DN80
WW - SUS304 - DN80
WW - SUS304 - DN80
PARK JONG SEOK
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
P-106 A/B/C
DWG. TITLE / TÊN BẢN VẼ
A1:
A3:
3-3 Section 3-3 of P-106 A/B
STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-314 1 : 30
D-T-315
CLIENT / CHỦ ĐẦU TƯ
1-1
D-T-316
PROJECT TITLE / DỰ ÁN
KEY PLAN
A - SUS304 - DN65
A - SUS304 - DN32
2-2 2-2
D-T-316 D-T-316
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
A - SUS304 - DN150 A - SUS304 - DN80
APPROVED BY:
A - SUS304 - DN80
A - SUS304 - DN80
Silencer/ Ống giảm thanh DN80
Gate valve/ Van cổng DN80
Rubber flexible joint/ Nối mềm cao su DN80 PARK JONG SEOK
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
1-1 Section 1-1 of B-101 A/B 2-2 Section 2-2 of B-101 A/B A1:
A3:
D-T-316 1 : 25 D-T-316 1 : 25 STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-316
CLIENT / CHỦ ĐẦU TƯ
2-2
D-T-317
PROJECT TITLE / DỰ ÁN
KEY PLAN
APPROVED BY:
A - SUS304 - DN100
2-2
D-T-317
A - SUS304 - DN200
APPROVED BY:
A - SUS304 - DN100
A - SUS304 - DN100
1000
PREPARED BY
2100
2048
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
1-1 Section 1-1 of B-102 A/B 2-2 Section 2-2 of B-102 A/B STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
1-1
D-T-318
PROJECT TITLE / DỰ ÁN
CS - SUS304 - DN50
FL +6.300
CS - SUS304 - DN80
FL +6.300
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
CS - SUS304 - DN80
CS - SUS304 - DN80
3-3 P-102 A/B 3-3 CS - SUS304 - DN80
D-T-319 D-T-319 Lugged butterfly valve/ Van bướm tay gạt DN80
Check valve/ Van 1 chiều DN80
APPROVED BY:
2100
320
600
2-2 P-103 A/B 2-2
360
D-T-319 D-T-319
APPROVED BY:
120
APPROVED BY:
1-1
D-T-318
CS - SUS304 - DN80
CS - SUS304 - DN80
CS - SUS304 - DN80
1 DETAIL OF P-102 A/B & P-103 A/B
C-P-207 1 : 25
PARK JONG SEOK
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
1-1 Section 1-1 of P-102 A/B & P-103 A/B STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-318 1 : 30 D-T-318
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
KEY PLAN
CS - SUS304 - DN80
2100
APPROVED BY:
CS - SUS304 - DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
Check valve/ Van 1 chiều DN80 Lugged butterfly valve/ Van bướm tay gạt DN80
Lugged butterfly valve/ Van bướm tay gạt DN80
Check valve/ Van 1 chiều DN80
600
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
APPROVED BY:
CS - SUS304 - DN80
CS - SUS304 - DN80
CS - SUS304 - DN80
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
A1:
A3:
2-2 Section 2-2 of P-102 A/B & P-103 A/B 3-3 Section 3-3 of P-102 A/B & P-103 A/B
STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-318 1 : 30 D-T-318 1 : 30
D-T-319
CLIENT / CHỦ ĐẦU TƯ
CS - SUS304 - DN50
500
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
CS - SUS304 - DN50
220 360 220
FL +6.300
APPROVED BY:
1-1 1-1
D-T-320 D-T-320
P-104 A/B
CS - SUS304 - DN50
CS - SUS304 - DN50
C-P-207 1 : 20
CS - SUS304 - DN50
APPROVED BY:
PREPARED BY
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
1-1 Section 1-1 of P-104 A/B 2-2 Section 2-2 of P-104 A/B DATED / HOÀN THÀNH SCALE / TỶ LỆ
A1:
D-T-320 1 : 25 D-T-320 1 : 25 A3:
D-T-320
CLIENT / CHỦ ĐẦU TƯ
1-1
D-T-321
PROJECT TITLE / DỰ ÁN
200
KEY PLAN
APPROVED BY:
3500
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
800
2344
1-1
D-T-321
PREPARED BY
1 DETAIL OF SEDIMENTATION TANK
C-P-205 1 : 30
NGUYEN BA SON
MECHANICAL WORK
(CƠ KHÍ)
300
DETAIL OF SEDIMENTATION
TANK
A1:
1-1 Section 1-1 of sedimentation tank A3:
D-T-321 1 : 40 STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
D-T-321