ACCOMPLISHMENT REPORT NO.3


JULY 4 - JULY 9,2022

Name of Practicumer: ASUNCION, ALYSSA MARIE R. Program: BS Civil Engineering Student No: 201912244
Company Name: Ybalai Builders Name of Project: Proposed 2-Storey Residential Renovation
Company Address: 1254 Don Pedro St., Brgy. 759, Santa Ana Manila, 1004 Project Address: 102 Apitong, Ayala Alabang

DESCRIPTION OF SUPERVISOR’S
INCLUSIVE DATES DETAILS OF THE ACTIVITY PERSONAL REMARKS
ACTIVITY ASSIGNED REMARKS
Supervisors ask questions Intern reflected from the
Supervisors scheduled
about the intern’s situation learnings from the 1st week.
a meeting to see how
in the project sites and also And looking forward to learn
July 4,2022 the interns are doing N/A
checked if we are learning more. Intern take notes of
in their respective
anything for the 1st week of other information that could
sites.
the OJT. be helpful when in site.
Intern know how to inspect a
After the workers finished
footing by checking the size
the fabrication of steel for
of rebars, correct spacing of
footing, supervisor taught
stirrups, and also how to see
Inspection of footing the intern how to inspect it.
July 5,2022 a fixed tire wire. Intern N/A
and openings Also, we were taught on
experienced to measure an
how to inspect the
opening and see if there is an
openings by checking the
issue in the measurement of
architectural plan.
an opening.
Project Engineer gave the Intern was able to learn that
interns a task of segmenting there are functions in excel
expenses. After I finish that will be useful in doing
Segmenting of segmenting the expenses. I the segmenting of expenses.
Expenses, BOQ of was task to get the prices of Intern learn some basic
July 6,2022 N/A
Structural, and BOQ of all the materials in the construction terms in
Architectural Structural table in excel. Tagalog. Intern learn the
Also, I was task to estimate commercial lengths and
the area of the openings in weight per meter, and the
the architectural plan. bars prices per piece.
Prepared by: Checked by:

ALYSSA MARIE R. ASUNCION ENGR. JOYCE C. VILLAMAR


Electronic Signature Date: 9-Jul-2022 Electronic Signature Date: 9-Jul-2022
Intern learn how to estimate
the plastering of openings
and CHB. Intern learn that
Always starting our day to when plastering an opening,
get the manpower of the the interior and exterior are
site. Supervisor gave a task different in lengths and
to interns by doing an height. There are times that
Manpower,
estimation in the plastering the plastered exterior part is
Estimating the
of interior and exterior of much bigger compared to the
plastering of openings
July 7,2022 openings. And also, to interior part of an opening. N/A
and CHB, Taking
estimate the CHB in every Intern learned that when
pictures of every room
opening both Ground and taking a picture of a room it is
for the progress report
Second Floor. Supervisor very important to do it in a
tasks us to take a picture in wide capture because the
every room to put in the progress report will be sent
progress report of the site. to the owner or client. It
should be seen in the picture
what room is making a
progress.
Started to do the
breakdown of workers in
In the toolbox meeting,
each room. Supervisor
Intern learned about all the
Manpower, Listing of assigned interns to do a list
issues and concerns of each
issues and concerns, of issues and concerns in
worker on the site. Intern
pictures for progress the site starting from July 4-
learned how to inspect a
report, Toolbox July 8. Scheduled a toolbox
grade beam by checking its
meeting, Inspection of meeting at exactly 9:30 AM.
form and spacing of stirrups.
Grade Beam, and Supervisor taught us how to
Intern was able to estimate
Estimation of volume inspect a grade beam.
July 8,2022 the volume of concrete for N/A
of concrete for plas Supervisor tasks interns to
plas wall, CHB wall, and grade
walls and CHB wall. do an estimation of the
beam. Intern learned what
Estimation of volume volume of concrete for plas
does a lintel beam looks like
of concrete for grade wall, CHB wall, and grade
and was able to estimate the
beam. Estimation of beam. Supervisor taught us
opening of each door and
opening for lintel a little background of the
windows on the Ground Floor
beam. lintel beam and tasks us to
to Second Floor for the lintel
Estimate the opening for
beam.
lintel beam, starting from
Ground to Second floor.
July 9,2022 N/A
Prepared by: Checked by:

ALYSSA MARIE R. ASUNCION ENGR. JOYCE C. VILLAMAR


Electronic Signature Date: 9-Jul-2022 Electronic Signature Date: 9-Jul-2022