Name of Practicumer: ASUNCION, ALYSSA MARIE R. Program: BS Civil Engineering Student No: 201912244
Company Name: Ybalai Builders Name of Project: Proposed 2-Storey Residential Renovation
Company Address: 1254 Don Pedro St., Brgy. 759, Santa Ana Manila, 1004 Project Address: 102 Apitong, Ayala Alabang
DESCRIPTION OF SUPERVISOR’S
INCLUSIVE DATES DETAILS OF THE ACTIVITY PERSONAL REMARKS
ACTIVITY ASSIGNED REMARKS
Supervisors ask questions Intern reflected from the
Supervisors scheduled
about the intern’s situation learnings from the 1st week.
a meeting to see how
in the project sites and also And looking forward to learn
July 4,2022 the interns are doing N/A
checked if we are learning more. Intern take notes of
in their respective
anything for the 1st week of other information that could
sites.
the OJT. be helpful when in site.
Intern know how to inspect a
After the workers finished
footing by checking the size
the fabrication of steel for
of rebars, correct spacing of
footing, supervisor taught
stirrups, and also how to see
Inspection of footing the intern how to inspect it.
July 5,2022 a fixed tire wire. Intern N/A
and openings Also, we were taught on
experienced to measure an
how to inspect the
opening and see if there is an
openings by checking the
issue in the measurement of
architectural plan.
an opening.
Project Engineer gave the Intern was able to learn that
interns a task of segmenting there are functions in excel
expenses. After I finish that will be useful in doing
Segmenting of segmenting the expenses. I the segmenting of expenses.
Expenses, BOQ of was task to get the prices of Intern learn some basic
July 6,2022 N/A
Structural, and BOQ of all the materials in the construction terms in
Architectural Structural table in excel. Tagalog. Intern learn the
Also, I was task to estimate commercial lengths and
the area of the openings in weight per meter, and the
the architectural plan. bars prices per piece.