Professional Documents
Culture Documents
Name of Practicumer: ASUNCION, ALYSSA MARIE R. Program: BS Civil Engineering Student No: 201912244
Company Name: Ybalai Builders Name of Project: Proposed 2-Storey Residential Renovation
Company Address: 1254 Don Pedro St., Brgy. 759, Santa Ana Manila, 1004 Project Address: 102 Apitong, Ayala Alabang
DESCRIPTION OF SUPERVISOR’S
INCLUSIVE DATES DETAILS OF THE ACTIVITY PERSONAL REMARKS
ACTIVITY ASSIGNED REMARKS
Intern learn the meaning of
quotation and its purpose.
Supervisor ask the intern to
Also intern have an idea how
ask the requirements for
Quotation for Ceiling to talk to suppliers, for
July 18,2022 quotation of ceiling N/A
Materials example is the basic
materials to the supplier via
information of the project
email.
and company that will be
needed by the supplier.
Supervisor gave a task to Intern was able to make a
interns wherein they have summary of payments using
to make a summary of excel for an easy monitoring
Monitoring of
payments per subcon. of their contracts. Intern was
payments per subcon,
Supervisor taught interns able to inspect the spacing of
CHB Laying
July 19,2022 how to inspect the CHB. Horizontal and Vertical bars N/A
Inspection, checking
Interns was tasks to check and was able to understand
of openings, Checking
the openings and lightings why is there a requirement of
lighting layout
layout at the balcony, spacing on it. Intern was able
library, and the whole 2F for to double check the lightings
lighting. layout for 2F.
Intern was able to call some
suppliers that are offering the
Architect task intern to find
products and was able to
a supplier of power track
Quotation for Power report the prices to the
and power dock and ask for
July 20,2022 track and power dock. architect and ask for a N/A
a quote. Project Engineer
Cutting list quotation. Intern was able to
tasks intern to do a cutting
understand on how to do a
list in a specific site.
cutting list and how to do it in
CAD.
Prepared by: Checked by: