(ia WorleyParsons S resources @ energy alo sll Mechanical Equipment Data Sheet TITLE: ‘41kV ESP POWER GENERATION PACKAGE ‘TAG NUMBERS: PP00-850-U01, PP00-850-U02, PP00-850-U03, PP00-850-U04 PP00-850-U05, PP00-850-U06, PP00-850-U07, PP00-850-U08 DOCUMENT NUMBER: —00100W-C-PG-PP00-ME-DAS-0001 PROJECT TITLE: RUMAILA FEED PROJECT PROJECT NUMBER: 40500-00100 ORIGINATOR: R.DISs PAGE 1 of 11 Revisions and Approvals REV) Date Description By | RP TEAD TENS T a [oun A 23/11/12 _ [Issued for interdiscipline Check RD | GD | GD B 3/12/2012 _ [issued for Customer Review RD | GD | GD 0 09/01/2013 [issued for Use RD | KH | KH Rea Baa PROPRIETARY INFORMATION ‘THIS DOCUMENT CONTAINS INFORMATION BELONGING TO WORLEYPARSONS, NEITHER THE DOCUMENT, NOR ANY OF ITS ‘CONSTITUENT PARTS, MAY BE REPRODUCED OR DISCLOSED WITHOUT THE PRIOR WRITTEN AUTHORISATION OF WORLEYPARSONS, REVISION DESCRIPTION SHEET Rovision Description ISSUED FOR IDC ISSUED FOR CUSTOMER REVIEW ISSUED FOR USE Page/Line| Description of Hold 6/283 Fuel class and lower heating value. 11KV ESP POWER GENERATION PACKAGE [Date oa0T 2073 Doc No. 00100W-C-PG-PPOO-ME-DAS-0001 TABLE OF CONTENTS Title Table of Contents Package Description & Notes Package Site Data and General Requirements Data Sheet Diesel Engine Data Sheet Diesel Fuel Storage Tank Data Sheet, Weight & COG Data Sheet Noise Data Sheet TaN Dec No 00100Wv-0-P-PPCO-ME-DAS-0001 POWER fosno, —40s000.00100 ITEM NO (8) PPO0-850-U0" to Lod GENERATION PACKAGE frre “TKV ESP POWER GENERATION PACKAGE DATA SHEET Jbocument no. ‘00100W-C-PG-PPOO-ME-DAS-0001 SI UNITS seco no (0 100W.C-66-PPo0-ME-S°C.0001 JevectRIcaL oATASMEET _O0TOOW-C-PG-PPO3-EL-DAS.-0004 PAGKAGE DESCRIPTION & NOTES ‘Description The Power Generation Package shall include a combined cluster of Diese! Power Generation Sots to provide electrical power to electric submersible pumps located a various wolthead installations. SUPPLIER shall advise number of generator sels required to meet a {ota oad demand of £000KWe in an N+1 configuration. SUPPLIER shall provide @ minimum of 4 generator se, ‘All unis wil be required to run, however i one generator rps the remaining unis wil have to shave the toa oad Le. a spinning reserve 'srequied ‘The SUPPLIER shal offer identical generator Sts in a modular arrangement such hat reduced load is required one unit can be removed Each Power Generation Package shall be transportable |e. containerised generator st with transportable fel storage tanks and containerised Sub-station. Re‘er to specification 00100W-C-PG-PPOO-ME-SPC-0001 for details of scope of supply. Notes 1) Refer to electrical data shest no, 00100W-C-PG-PPOS-EL-DAS-0004 for technical detais ofthe 11KV diesel generator. 2). Refer to electrical data sheet no, 00100W-C-PG-PPOS-EL-DAS-0008 for technical details ofthe HV Switchgear 3) Refer o lactrcal specication no, O100W-C-PG-PPO3-EL-SPC-000! for technical detals ofthe packaged substation. 4) Refer to P&ID nos. 00100W-C-PG-FPOO-PR-PID-8521 & 8522 fr typical scope of supply forthe fue! distribution pipework. '5) Refer o plot plan no. 00100W..C-PG-PPOO-PE-DPP.0002-00" fr typical arrangement ofthe medium term ESP powerplant consisting of ‘1KV generator sos, package substation, transformer, diesel sorage tanks and fuel dlatrbuton pipework 8) SUPPLIER shall develop the plot plan showing the required spacing ofthe equipment and provide leak containment of he dese! storage tanks to meet the iraqi egulations and requirements referenced in document no. 00100W..C-G0-G000-EN-800-0001, Double skinned esel storage tanks shal be supplied as an option to provide leak detection. 7) SUPPLIER shal advise emission levels from the engine exhaust and comply with the emission lite detaied as follows; e [NOx emissions shall not exceed 1480 mg/Nm3 (or up to 1,600 ijustied to maintain high energy efficiency.) The emissions guidelines in Table 1.1.2 of he IFC IEHS guidelines: Environmental, Heath, and Safety Guidelines apply. The measurement from combustion sources should be @ reference conditions of 15% excess O, where normal means 0 deg C, 1 atm, dry basis, i {kV ESP POWER GENERATION PACKAGE Dae OoOTzOTS Pa [Doc No._00100W-C-PG-PPO0-ME-DAS-0001 aot itt WorleyParsons POWER GENERATION PACKAGE SITE DATA AND GENERAL REQUIREMENTS. DATA SHEET ‘SIUNITS {OTE CONDIGATES NFORNATION TO BE COMPLETED BY PURCHASER 405000-00100 _ITEMNO(S)_PPOO-850-UOT to U08 ‘kV ESP POWER GENERATION PACKAGE 0 100W-C.PG-PPOO-ME-DAS-0001 {0 100W-C-PG-PPOO-ME-SPC-0001 DOTUOW-C-PG-PPOSEL-DAS-O004 fave DATA lLocarion: |NOOOR HEATED UNDER ROOF J@ curoor © @unneateo parma ses J@ crave |= Onezzanne 1O wwvrenzaionrean, © TROPICALZATION REDD. }@ ELEVATION Seateve! BAROMETER _1024-062 APPLICABLE TO MACHINE SEESPECFICATION ECMUA WO [APPLICABLE TO NEIGHBORHOOD ‘SEE SPECIFICATION Owes Ono. SOUNDLEVEL 10 @1 (© RANGE OF AMBIENT TEMPS: DRY BULB WET EUS STERATED"C NORMAL ‘C axIMUM-c = nunc 2 [ELECTRICAL AREA CLASSIFICATION: (57.18, EO BOTH QZONE SAFE __GROUP SAFE. CLASS SAFE, INUSUAL CONDITIONS: @ousr O rues (@ OTHER __ FREQUENT AND SEVERE SANDSTORMS. MAX WIND SPEED -48 m3 SECOND GUST [AVERAGE WND SPEED Zane ‘REFER TO 001000-¢-Gt-Gn00-G=-000 o001 [@VeNCOR HAVING UNTT RESPONSIBLITY. ENGINE SUPPLER «48 RE: 20 MICRO PASTAL [APPLICABLE SPECIFICATIONS: (see peve 15 @ Acoustic ENCLOSURE @ Fenworors eo100W.c-Pa PPo9- Me: SPC- 0004 (01009-6-Ge-Go06-ESPC-0017 TH Proce: mer DISCHARGE. PACKAGE VENT PACKAGE DRAIN PACKAGE INST ‘CONNETIONS CUSTOMER INTERFACE: Fpantnc: FLT CONDITIONS: LECTRICTTY: WA Jvocrace MANUFACTURERS S1D OTHER ___o9100W-C-60.G000.MmL-$PC 0009, Jprase Jcoounc ware so MAX RETURN [sapmenT: a omesric Ovort LONG TERM STORAGE FOR @ exroRt soxNG READ press. worat bar RETURN Jnsreumenr are luexrress rc) [1] 707A. packace UnLiry CONSUMPTION CCoOUNG wareR Lose cReUT | CT asses nar DIESEL ENGINE ‘SYNCHRONOUS GENERATOR DIESEL ENGINE + SYNCHRONOUS (GENERATOR TOTAL SK ELECTRIC POWER NONE ‘SPACE REQUIREMENTS (wl DIESEL ENGINE + SYNCHRONOUS [SHOP INSPECTION AND TESTE) stoP nsPecTION levoRosranic actor accePrance Test Isounouever Test GENERATOR-TOTALSKDL FUEL TAN. u sta STA wsTa wate H_stA Hosta WorleyParsons ‘1k ESP POWER GENERATION PACKAGE [Dae oaoTa0T [Doc No, 00100W-C-PG-PROO-ME-DAS 000% [ORIEN WACHINE [rvPe oF service lrower [seco ReauiRED JAMBIENT TEMPERATURE louTo00Rs: [ARRANGENENT ‘1]NO. CYLINDERS STA 13}eNGINE COOUNG: ‘ul ENGINE CYLINDER 15] TURBOCHARGER so] AFTERCOOLER s7| on coousr 1a] _exnaust maniroLo sof INLET TEMP 2] 21)SPECIFIC FUEL CONSUMPTION @ LOADS: a 100% LOAD ‘ a 79% LOAD 2,| ‘50% LOAD as 21)FCTER CONFIGURATION 2a)FLTER MANUFACTURER 2a}MIN. NLET PRESSURE (NORMAL) sofeueL PUNE ‘2)FUEL DAY TANK: [VOLUME sal MATERIAL CARBON STEEL + EPOXY LINING TANK RETENSION @ FULL LOAD se] 6A. ORANG DIESEL ENGINE DATA SHEET SIUNITS, ‘OPERATING CONDITIONS: "SYNCHRONOUS GENERATOR ‘STA (1500 man) JaunrruDe REFER TO 00:00w-c-G0-co00-GE-800-0001 DESIGN AND PERFORMANCE ‘STA STROKE 12)NO.OF VALVES PER CYL INLETEXHAUST of tau rue everem ENGINE ORIEN 31 FILTRATION ABSOLUTE PARTICLE SIZE 49500000100 ____TEMNOS) PPO0-850-Uo! fo UO8. hme ‘HRV ESP POWER GENERATION PACKAGE DOCUMENT No. 00100W.C-PG-PPOO-ME-DAS.0001 SPEC NO. ootocw.c-P¢-PPoDAME-$PC-000" ELECTRICAL DATASHEET _O0100W.C-PC-PPus-€L.DAS-0004 FUELTYPE, __Diesolne.2 Cis HOLD? uv 42,780 (HOLD 1) cry haw cry SUPPLY PRESSURE FUEL TANK BY SUPPLIER Berg TURBO GrAROED Coupression nano sta No.orovcies—=~SCSTA SPLACEMENT STA ites MAX TURBOCHARGER SPEED STA ‘pm "SPEED, RPM EMEP, BAR G PISTON SPEED, mis ‘COMBUSTION AIR FLOW @MAK POWER FLUE GAS FLOWRATE @MAX POWER st DIESEL ENGINE OUTPUT POWER TAT SITE CONDITIONS NORMAL sta ww Sta om MN sta ww. STA ca HOUR STA wo STA ‘pm ‘HOURS STA KW STA em ‘CONTINUOUS STA Kw STA ‘pm BARRING SYSTEM TPE 'WANUAL | POWER ASST, WEIGHT AND DIMENSIONS 20)BARE ENGINE WITH FLYWHEEL 40] ORY / OPERATING WT 41] LENGTH xwoTH x HEIGHT «¢2}\aNIMUM HEIGHT TO REMOVE PISTONSICON RODS WorleyParsons Jor. cour: DRY / OPERATING WT STA LENGTH x WIDTH x HEXGHT STA IMAXIMUM MAINTENANCE WEIGHTS: STA TEM STA. WEKGHT STA ‘a Trem STA WechT STA o Trem sta weckr STA fo [Tilo 1 kV ESP POWER GENERATION PACKAGE Date oaTi2013 Page Doc. No. _00100W-C-PG-PPOO-ME-DAS-0001 Jeor tt Losno. csooncoto _ EWN. PP0O880.U01 to Vos DIESEL ENGINE TLE +1IkV ESP POWER GENERATION PACKAGE DATA SHEET DOCUMENT NO. 00100W-C-PG-PPO0-ME-DAS-0001 SIUNITS ISPEC NO. ‘00100W-C-PG-PPOO-ME-SPC.0001 EvecrRcaL oATASHET —OO0NCG PG PPUEEL OASOOGH TRETRUMENTATON [RSTRONENTATIONS STARTING PANEL ROONTNG FACE Fane Location micron cuwrex Jane. wounins aTbaRATION fivorauuic courte haciowereR froraue converrer MECHANCALELECTRUCAL lcear Box Lube Ot. pressure notcaroRs) jucio coven pressure weasunn Juexeue comune BEFORE aNDIOR AFTER FLTER EXTENDED SHAFT Lube on tewreRaTune jew. weasunIn hvsetreuuey BEFORE ANDIOR AFTER COOLERS let tenors Lacker waren PRES noIcaroR lonan senocker Lacker waren THERNOWETER Jovan enri ewe raeaSuRING. NLETANDIOR OUTLET braRtive AR vEssei PRESS wo. braRTiNG AR VESSEL RELIEF VALVE PEDESTAL lxrAUsT PYROWETER(S YESNO base ras ves, Tyee _— base PLATE NA bYRONETER KOUNTING NANFOLDIEAGH CruNOER leauwenr 80 parte RALER no himinwer wanirovo PRESS nD Founoarion BoLrs ves }ours mun METER Nctosure CONTAINER Frequency METER JOUNTING PADS YES -ANTIVIBR. SOLID we Room Na SAFETY oEwces [onan PRESSURE ve, JovERSPEED PROTECTOR Te ‘anus siuToown —_[Sarery cuaRos Yes STALOGATIONS How waren TEMP ves, fine oeTEcrioN ALAR Yes. REMARK? ‘wana SHUTDOWN PRESTARTWATER EATER STA INTAKE AIR SHUT OFF VALVE ves _ —___ PARK ARRESTER Yes lPRE START ON HEATER mA ves RANK CASE larger than 053) VOLTS: lpee.START WATER PUNE STA OOF CVINDERS sta bone SRK TA” CONFIG VEET UNE {NDER LINERS ES No TYPE WET/ORY "STON RINGS NO. & SE Cowpnessiow ou: (0.0F NAN BEARINGS Sze: STA TYPE STA -LYWNEEL BEARING Sze: sta Tyre STA RUST BEARING Size STA Tyee sta OER ROO BEARING Sze TYPE STA ETVALVE NO.OF SIE: at [i'StA= Supplertoawves 2: Output to generator common alarm (RTU) and microwave back to central control room in Rualla Cap. Fite inv E> POWER GENERATION PACKAGE WorleyParsons ae Bae soorzois Pave foe No._ 00100. PG-PPOO-ME-DAS.000% Tot DIESEL ENGINE DATA SHEET SLUNITS ENGIEACOESSORES ano STARTER jena sane [LecTme moron sranren JarreREs a cnanceR }ivorauuic sraareR sRSTARTER COMPRESSOR Jcoupnesson riow RATE couPRessoa worn PRESSURE [courressonoRven |coupnesson are & TYPE Janvesseis hie vesseis works paessune Jar PReSsune REDUCED vALve REDUCER VALVE WORKNG PRESSURE Jressune cnancen bressune cxancen TYEE Fre ouino Lae pun lextausr wawroto «BeuLows lexiausr eens lexiausr suencen lence coouNG lavsrem: SOOLING UNIT CIRCULATING WATER PUMP: [PUMP DRIVE: jon. cooueR: lcomsinen oi COOLER |wiTi ENGINE COOLING UNIT lnERCOOLER FOR PRESSURE CHARGER. jou. COOLER FOR HYDRAULIC COUPLING: JFtaNces: [coos WATER SUPPLY PRESSURE GAUGE Yes [EQUIPMENT STANDARDS SEE OOTOOWOPGPROOME. YES Yes Yes ‘CLOSED CIRCUIT WATER HORIZONTAL RADIATOR Yes ENGINE YES STA STA STA NA 108 NO. 406000.00100 _ ITEM NO(S) PPO0-850-U0! to UOB "TInV ESP POWER GENERATION PACKAGE POCUNENT No. 00108W-C-PG-PPOO.ME-DAS-000% 0100W-C-P@-PPOO-ME-SPC-000% LECTRICAL DATASHEET _OO1COW.C-G-PP0S-EL.DAS-0004 bad ELECTRONIC lconrro. class [SPEED RANGE STA lLusmicaTion lsverew TPE sta |uee ot consuuPrion sta PUMPS STA Te tA nuweR STA ORVE ARRANGEMENT ENGINE DRIVEN uur WERTER ~ laarreny cuarcine loenenaTor |vovracECURRENT RELAY lsarrenr re a larreny vourace sta MAN BATTERY CHARGER YES li AMWETER. VLTHETER AND LOW VOLTS NOIGATING LAP [ruet suepLy FUEL CONSUMPTION FUL LOAD |FUEL CONSUMPTION HALF LOAD |ruct Tank capaciry - luever cauae IcenrRiFucE Not Applicable [rues erpnc ‘By Supplier [ran wounTins By Suppior Jrers Jruet Fier laacnenic FLTER ie TIRV ESP POWER GENERATION PACKAGE fe Oo OTEOTS Pov [Pace JPoc. No,_00100W-C-PG-PPOO-ME-DAS.0001 goft2 J0BNO, _sstne-0tc0 [TENN (S| PPOD 850-001 fo Los DIESEL FUEL STORAGE TANK ~KV ESP POWER GENERATION PACKAGE DATA SHEET DOCUMENT NO. 00100W-C-PG-PPO0-ME-DAS-0001 ‘SIUNITS: SPEC NO. ‘00100W-C-PG-PPOO-ME-SPC-0001 LECTRICALOATASHEET — OT00W/C-PG-PPOS EL DAS CGO4 Eo ESET FUEL STONRGE TANK TANGFORTABLE Te Reged Rena acct Sanath 65 EW T6106 (out Simei Fon page Soa co ror STA GUPPUER TOADS] Pedal Sd Tea Sasa Tanpeae TO Eon aa [Desi an a esa Psst gh Graf ak of ater iy Cosy STA Based nT dye rag aa pOOT ert era Open Tenoaatre (Sj Anblot Tai Aiwa Wong Press ar a Spring Peso gy Aimeopa cat asoee Grea of tnt a alr» TOOT ean pee +S fer otal vaure (o) Favroated Wean Bor Newel Liquid Vue Emly Waist) Slope of Reo. Operating Weight Sipe of Base: Test weight [Corsten Alowarce (rm [mensions im nsuston (Spec an niewess): Surface Frit To Spee. OfOOW-C-GO.Co00 ML SPC 0008 [Sher 08 r Epoxy Unig (Romae) Te STA™ am [Fanges [Disned Ends: CS + Epony Lining (Remarke)—Thk _STA__mm | Sus (Beas: STA The STA_mm [nus Siucwrals STA (Gana Nowaies; STA nr INSPECTION & NOE [CODE & SPECIFICATION REQUIREMENTS Sess Rotel As por applicable CodeslStandarde Project Specioaione. 00100W-C-GO-GO00ML-SPC-0008 Racography. Per Code Oar Teste Tydrostate Tost irapecion cose ‘her Specteaons. _OOTOOW-C-GO-G0O0-ML-SPC-D00S ‘DoTOOW-C-G0.GO00-ML-SPC-0005 NOZZLES & CONNECTIONS. ‘Sere a Saree Furcsurecr FoEL FLUNG FUEL RETURN ent fpveRrtow. Iuanwav pean fever cauce LEVEL TRANSMITTER “Tank fo be fed wit level ndletor& level Wanariar “Al tank nozzles and valves shal be flanged. Allanges to comply with ASME B16.5 Fuel evertiow line to be provided wit sll back to grain pan gn shall incorporate a minimum of 8h sump, 10% expansion and 160 slope. Tank shall bo offuly welded construction. Bato part a tank up to 0.5m height shall be epoxy ined Tank wll be installed adjacent tothe generator skid, SUPPLIER to advise elevation and max horizontal dlstance rom the engine Tank valve isolation shall comply with the P&IO document no, 00100W-C-PG-PPOO-PR-PID 8522, Decleated storage per generator [Tite 11kV ESP POWER GENERATION PACKAGE WorleyParsons reece vee pate oniov/e01s boc. No. _00100W-C-PG-PPO0-ME-DAS-0001 WEIGHT AND COG DATA SHEET 4a the Sus » ght ig] Sas ELEVATION Inciviual conaineised Generator Set and Sub-staton dimensions are requires o es} Shipping jeaviest Maintenance rem Dy [Component 1 NO 67 [Conteris [Descrigton IReq No Test ght IPO No. 6 fame & THe Sa Date | Suppor Raters 70 Frarwegred “Sunpler ig Status tor Buyer 2 [Approval Signature waranty WorleyParsons > “dgo sll ba bnew, "IRV ESP POWER GENERATION PACKAGE Ter Pa odo Rev 05000-00100 TEMNo(s) PP00-850-U01 to Woe NOISE DATASHEET frre {IRV E5P POWER GENERATION PACKAGE SIUNITS, Jbocumenr no 00100W-6-PG-PPOo.ME-DAS-2001 = DDIDOW-E-PG-PPOONE-SPC-200% Diver Type: Diesel Engine Diver Power kW STA Diver Speed pm STH ‘anlanes noose ye: Ono Desorption of Auiares Noise Daa ncdes Driver mye DN Nols Data Obsaine By i teesurerent(see below aso) 1 Caleulaton (Speci) at C) Werkstop 2 Site cor; Ci terteat 2) Simtar Eaupment Mesturedin Aecrtarce Win: @ EEMUA 140 ‘Typlal Sound Level STA(THOMAX) BIA) at 1m Egdomenttvaor Dimensions nem Longin STA Weety STA Height: STA ‘GENERAL NOTES 4. GENERAL ‘This dala sheet covers the noise lms ofthe equement. given blow. 2. NOISE LINITS TO BE MET BY THE EQUIPMENT ‘The nose generated by the equpment shal not exceed te mare stngent ofthe noe iis gen nthe tale Blow, or any ofthe condo of operation er which he equprset may normaly be expected tobe uses, {piste maximum sound pressure even 8 20 uP, fr he mode of operation nicated at ary locaton at 1m om ‘te equipment surface or eperter poston, pect Livi the maximum 2ouns power lve, n 8 re 1 pW fx he mode of operation nates the equipment generates noise wih tora or impulsive components, the mts sel be taken & (A) more svoget. Noise evel wil be veri measured according othe flowing standards: EEMUA 140, 2. INFORMATION TO BE SUBMITTED WITH THE SUPPLIERS PROPOSAL “This oie deta shoot shal be reluried withthe ender and wth guareriged nis data led in ‘ner aplcable he completed slencer andlor acoustic enclosure data requistion sheet shal algo be relumed ‘Super shal supply a cmensional skelch of et rangement used nee the equpment oie nclues sencing messues, Supper shall stat below the unilenced nse dat. ‘Supplier sra sate and emis any slencng measures used to moot the noise requiremerts, ‘Supper era compete th datasheet orl s-componants thal compris the carpeted skilequipment package NORE LMS 5 sr se le WorleyParsons Equant ‘Sound presaurpower ovals guaranteed by SupRnOTA e iersocations (Upper werance 08) Nose Trneigingacave band eves cB A) Tai] eit | Tae ] 250] S00 | TO00 ] 2000] 000 | o000 He | te | He |e | ne | ne | te | ee | 95.00/08 0 |Sioncing measures [beer Enaine I [ow [Gereaer I [or [esa Corea [> Peerage Continent Paces i> lsucstaten [or co be [oe Istreequpmentnoseimpusivoin charac: . Yes CI No Does the equipment emit any audible pure tones: Yes CI No Incoumn’a’, the efereneed number indates whch of he folowing apples othe Supler rose ovls: 1) without acouste provisions 2) min aust provisions 8) special ow-cise design 4 supplies bes estimate, rot necessary guarantees Inco’ the fguenceates the specie A-weighted Sound pressurepowe lit wennbece aw Dae alo sl oc No. _on00w-c-PG-PPOO-ME-DAS- 2001 A ree “11KV ESP POWER GENERATION PACKAGE Far Pane set

You might also like