2nd day, we went to the Registry of Deeds to request for the E-copy of a certain
title, registered to a certain person. This is for the purpose of the case study that Engr.
Agub assigned us to make. After that, Engr Agub gave us some details of what we did
during the 1st day. He was able to give us idea on how the process of collecting data
can help us register land and lots. He discussed the process of surveying a land,
plotting through Geomax, collecting data, making survey returns and lot data
computation.
3rd day, Engr. Agub gave us the whole day to practice making survey returns, lot
data computation, technical descriptions, field notes and field notes cover. We practiced
the whole day doing Geomax works. There is a specific step for each requirements that
we must follow so that those will come up with the correct numbers. This day is very
challenging because sometimes we were unable to bring those requirements out and
numbers sometimes do not match.
4th day, the whole team together with Engr. Agub relocated a specific land from
Bambang Nueva Vizcaya. It is a 180sq.m as part of a hectare land property. Thru the
use of Real-time Kinematic, Total Station and Tapping. We were able to identify where
the 180sq.m lot is. After that we had lunch. We ate tinola from a native chicken with
many potato and moringa(malunggay). After we had so much lunch. We began placing
mohon(monuments) in each corners and boundaries that we have traversed. This day is
very tiring and very exhausting because we
5th day,