S/N Breakdown of Work Activities and Processes Review Dates Review Trigger Rev. No Reference
S/N Breakdown of Work Activities and Processes Review Dates Review Trigger Rev. No Reference
8
Appointed by: (Contractor's Top Management)
Logitharaj 5/26/2023
Risk-impact assessment team leader Signature Date
* Team leader shall have attended risk management workshop. Please attach training certificate.
Risk Assessment Form
Company : WITFLUX ENGINEERING PTE LTD RA Ref : TENGAH / RA / 012 Rev No.:
Original RA Date: RA Review Date : RA Review Date : RA Review Date : RA Review Date :
5/26/2023
5/26/2023 Next Review Date : Next Review Date : Next Review Date : Next Review Date :
6/25/2024
Page 4 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
1 Mobilization of Equipment to Routine 1.Workers stuck by 1.Major injury or Elimination : NA Elimination: N/A
Site vehicle even death / Substitution : NA Substitution: N/A
Property damage Engineering : 1. Provide hard Engineering Control: N/A
2.Vehicle hit to the barricade to the site vehicle Administrative Control:
materials access 1. Briefing RA & SWP to all
Administrative : workers and drivers on site
1. Driver must be hold valid traffic management
vehicle lisenced. 2. supervisors close monitoring
2. Driver to be follow on site to follow up
deployed traffic controllers
instruction .
3. look out for Warning signages.
4. Drivers must be follow site
speed limit.
5. No parking on the site access. 5 3 15 5 1 5
6. Deploy a competent in-house Site
site banksman to direction to the Supervisor
vehicle. 7. WSHC
Driver not leave the vehicle
along.
PPE : Banksman must wear
reflective vest with basic PPE
Site
Supervisor
Page 5 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 6 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
2 Loading/ Routine Falling objects from Serious injury or Elimination: N/A Elimination: N/A
Unloading materials using by the heights even death to Substitution: N/A Substitution: N/A
lorry crane workers Engineering Control: Engineering Control:N/A
1.provide barricade for the lifting Administrative Control:
zone. 1. Standing supervision by lifting
2.steel plate placed to the crane supervisor
outriggers. 2.Use walkie-Talkie to proper
Administrative Control: communiaction between crane
1.Appoint a competent lifting operator and lifting team.
team.
2.Apply Permit To Work (PTW) PPE:
before lifting.
3.Communicate and brief Risk Site Manager
and safe work procedure to lifting
team
4.Display warning signages to the
lifting area 5 4 20 5 2 10
WSHC
5.No unathorized person involve
in the lifting operation. Lifting
6.Use tagline to control load . supervisor
7.Do not cross under the
suspended load.
8.Must check of LM ,LG,OPT
VALID CERT. before procced the
lifting.
PPE: Workers to wear reflective
vest, gloves, helmet ,safety shoe
3 Manual lifting of materials Routine Physical Hazard Back injury / Elimination: N/A Elimination: N/A
bodily harm Substitution: N/A Substitution: N/A
Engineering Control: Engineering Control: N/A
1.Usage of trolley to minimize Administrative Control:
manual lifting 1. Conduct training on manual Site Manager
Administrative Control: handling
1. Brief workers on proper 2. Engage buddy system when
manual lifting techniques. carry bulk/heavy materials
2. Only allow to carry 25kg below 3 2 6 3 1 3
WSHC
per person or use mechanical aid
PPE: Appropriate PPE must be Site
provided. Supervisor
Page 7 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
4 Storage of material on site Routine Stagnant water found Breeding of Elimination: N/A Elimination: N/A
in material mosquito Substitution: N/A Substitution: N/A
storage area Engineering Control: N/A Engineering Control:
Administrative Control: 1.Provide proper
1.All materials are to be stored rack/boxto store the material on
and elevated at least 300mm site
above ground level. Administrative Control:
2.Makesure remove stagnant 1.Conduct small campaign to
water and apply anti-mosquito oil educate the worker about
regularly. Zika/dengue disease.
3. Brief workers on proper Site Manager
material storage practice.
4.Inspect stored materials for
stagnant water immediately after
every raining event. 4 3 12 3 1 3
WSHC
Page 8 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
5 Excavation/ Trenching Routine Fail into the deep bodily injury to Elimination: N/A Elimination: N/A
Works hole workers Substitution: N/A Substitution: N/A
Engineering Control: Engineering Control:
1.Required PE design if
To design excavation slope excavation depth more than 4
/shoring system by Professional meter.
Engineer PE. 2.provide hard barricade
edge of the excavation.
Administrative:
1.Appoint earth work supervisor Administrative Control:
(RES). 1. Supervisor regular update the Site Manager
2.Apply permit to work for permit to work .
excavation 2.Standing supervision to carry
3. Apply of Permit-To-Work at 4 4 16 out the job. 4 1 4
height (WAH) if subject to deep PPE: Visual check on PPE to WSHC
hole ensure of good condition before
4.Provide safe means of access if use Site
the depth. 5.Provide Supervisor
guradrail and toe board at edge
of the excavation areas.
6.Provide
proper shooring support
7. Display
warning sign
Page 9 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
6 Excavation works using of Routine Machanical Hazard / serious injury or Elimination: N/A Elimination: N/A
Hydraulic Excavator worker stuck or hit by even death Substitution: N/A Substitution: N/A
machine Engineering Control: Engineering Control: N/A
Administrative Control:
1) Barricade the of Trench / 1.
excavator moving area. Conducted daily TBM,
2.
Close Supervision,
Administrative: 3.
1) Ensure machine operate by Regular Inspection,
appointed valid licensed operator. 4.Risk communication briefing in
2) To do daily checklist before the TBM
operate and checklist must be 5. Brief RA & SWP
Site Manager
displayed on the machine. to all workers in the TBM
3) Deploy banksman to direction
the machine.
4)Two-Way Communicate the 5 3 15 5 1 5
WSHC
Operator & Banksman
5) Display warning sign
Site
6.Monthly service / maintanance
Supervisor
of machine
6) workers keep safe distance
from the machinery.
PPE :
Safety Helmet, Reflective vest,
Hand gloves, Safety goggles,
Safety Shoes
3) Apply PTW
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
7 Rebar Cutting, Bending & Routine Pinch Point Serious (or) Elimination: N/A Elimination: N/A
Tying Works Minor Injury Substitution: N/A Substitution: N/A
Engineering Control:
1) Sharp edge must be protection Site Manager
(or) removed Engineering:N/A
2) Rebar Edge Provide End Gap. Administrative Control:
Administrative Control: 1) Conduct Daily TBM
5 3 15 5 2 10
1) To Maintain Good 2) Close Supervision WSHC
Housekeeping at All Times 3) Regular Inspection
2) Trained Persons Appointed 4) Everyone Follow RA & SWP Site
3) Store Rebar in Orderly Manner Supervisor
PPE: As Required (Basic PPE)
Wear Safety Helmet, Hand
Gloves, Goggles, Safety Shoes,
Reflective Vest, Ear Plug, Ear
Muffler.
Routine Rotating parts Serious / Minor Elimination: N/A Elimination: N/A
Injury Substitution: N/A Substitution: N/A
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Routine Slip, Trip & Fall for Fatality (or) Elimination: N/A Administrative Control:
Poor Housekeeping Serious / Minor Substitution: N/A 1) Conduct Daily TBM
Injury Engineering Control: 2) Close Supervision
1) Provide Barricade the Rebar 3) Regular Inspection
Cutting & Bending Machine Area 4) Brief to all worker RA & SWP
2) Erect Proper Rebar Cutting, to follow.
Bending Structure
3) Provide Adequate Lighting
4) Provide / Use of Proper
Access
5) Provide Barricade to Rebar
Storage Area
Site Manager
6)
Store Rebar in Orderly Manner
Storage Area 5 4 20 5 2 10
Administrative Control: WSHC
1) To Maintain Good
Housekeeping at All Times Site
2) Operator Everyday Submit Supervisor
Daily Checklist.
3)
To Display Authorized Operator
4) Only
Trained Person Involving Rebar
Cutting & Bending Operation
5) Provision Warning Signage
8 Preparation works before Routine Truck/Pump toppling Major injury or Elimination: N/A Elimination: N/A
concreting even death Substitution: N/A (Basic PPE)
PPE: As Required Substitution: N/A
Engineering Control:Hand 1)
Wear Safety Helmet, Engineering Control:N/A
1)Ground levelling Ground
Gloves, condition
Goggles, checked by
Safety Shoes, Administrative
2)Pipe fixing for stationary engineer
Reflective Vest, Ear Plug, Ear Control:NA
pumps 2) Outrigger to be extend and sit 5 1 5 5 1 5 Site Engineer
Muffler.
3)Hoisting of equipment on the steel plate or firmed
such as vibrator, etc foundation
Administrative
Control:NA
Page 12 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 13 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
9 Rebar Reinstatement and Routine Contact with Hand Injury to Elimination: N/A Elimination: N/A
embedded items - protruding rebars workers Substitution: N/A Substitution: N/A
Reinforcement-wire brushing Engineering Control: N/A Engineering Control: N/A Site Manager
to remove loose rust, loose Administrative Control: Administrative Control:
scale 1. Rebar areas to be barricaded 1. Site and safety personnel to
2. Protruding edges of rebar to 3 4 12 be on site to monitor and to 3 2 6
be covered ensure safe working condition WSHC
PPE: Safety Helmet, Reflective PPE: Visual check on PPE to
vest, Hand gloves, Safety ensure of good condition before Site
goggles, Safety Shoes use Supervisor
11 Cutting/Grinding of rebar Routine Hazards from gas Elimination: N/A Elimination: N/A
cutting / welding lead Substitution: N/A Substitution: N/A
to Fire Engineering Control: N/A Engineering Control: N/A
Administrative Control: Administrative Control:
1. Cordon the area of hot work 1. Standing supervision by job
2. Keep oxy-acetylene cylinder supervisor
at safe location 2. Fire Emergency Evacuation
3. Secure oxy-acetylene drill hot work to be conducted at
cylinders upright least every 6 months
4. Remove combustible PPE: Visual check on PPE to Site Manager
material from hot work area ensure of good condition before
5. Ensure double flash back use
arresters at gas cylinder
6. PTW-Hot works approved 3 4 12 3 2 6
WSHC
prior to start work
7. Qualified welder Site
8. Ensure safe work procedures Supervisor
9. Emergency Evacuation Plan
in Place
10. Standby Fire Extinguisher
PPE: Safety Helmet, Reflective
vest, Hand gloves, Safety
goggles, Safety Shoes
Page 14 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 15 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 16 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 17 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 18 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 19 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
13 Working-at-height use of Routine Toppling of scaffold & Elimination: N/A Elimination: N/A
scaffold working platform falling from height Substitution: N/A Substitution: N/A
Engineering Control: Engineering Control: N/A
1.Scaffold access design by P.E Administrative Control:
and obtained COS 1. Close Supervision and
2. Engineer shall ensure crane monitoring
access is compacted and adequate 2. Daily Inspection
steel plates are provided Site Manager
PPE: Visual check on PPE to
Administrative Control:
ensure of good condition before
1.Provide experienced Workers
use
2.Provide trained and experience
Scaffolding team WSHC
3.Implement PTW (WAH)
7.Machines shall keep a safe Site
distance from any excavation Supervisor
trench
PPE: Workers to put on vest, Full
body HArdness, gloves, helmet
and whistle
14 Vibrating concrete Routine Noise from Elimination: N/A Elimination: N/A Site Manager
mechanical vibrator Substitution: N/A Substitution: N/A
Engineering Control: N/A Engineering Control: N/A
Administrative Control: N/A Administrative Control:N/A
PPE: Safety Helmet, Reflective 3 2 6 PPE: Visual check on PPE to 3 1 3
WSHC
vest, Hand gloves, Safety ensure of good condition before
goggles, Safety Shoes, Earplugs use Site
Supervisor
Page 20 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
15 Workers manually spread Routine Allergies to splashing Elimination: N/A Elimination: N/A
the concrete around the area concrete Substitution: N/A Substitution: N/A
to satisfy the finish level Engineering Control: N/A Engineering Control: N/A
Administrative Control: Administrative Control: Site Manager
1.Proper lighting to be provided 1. Site and safety supervisors to
for night casting be on site to monitor and ensure
2.Ensure the availability of safe work condition
washing point for workers 3 4 12 2.Ensure availability of first aid 3 2 6
WSHC
PPE: Safety Helmet, Reflective box and occupational first aider
vest, Hand gloves, Safety PPE: Visual check on PPE to Site
goggles, Safety Shoes ensure of good condition before Supervisor
use
16 Concrete Curing Routine Contact with chemical Elimination: N/A Elimination: N/A
curing compound Substitution: N/A Substitution: N/A
when applying to Engineering Control: N/A Engineering Control: N/A
harden concrete Administrative Control: Administrative Control:
1.Proper lighting to be provided 1. Site and safety supervisors to Site Manager
for night casting be on site to monitor and ensure
2.Ensure the availability of safe work condition
washing point for workers 2.Ensure availability of first aid
3. Make safety datasheet (SDS) 3 4 12 box and occupational first aider 3 2 6
WSHC
available and brief all personal on PPE: Visual check on PPE to
hazard/ precaution required. ensure of good condition before Site
PPE:Safety Helmet, Reflective use Supervisor
vest, Safety goggles, Safety
Shoes, Chemical Gloves
Page 21 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
17 Working at Night Routine Poor lighting Cause Elimination: N/A Elimination: N/A
tripping and collide Substitution: N/A Substitution: N/A
with machines Engineering Control: N/A Engineering Control: N/A
Administrative Control:
Administrative Control: Ensure back-up generator and Site Manager
1. Ensure that sufficient lighting flood light are stand by for night
to be provided on location when works
working at night.
2. Supervisor to look out for 3 2 6 3 1 3
WSHC
potential hazards during day light
hours & night time and brief Site
workers. Supervisor
18 Work area Housekeeping Routine Dust inhalation Elimination: N/A Elimination: N/A
Substitution: N/A Substitution: N/A
Engineering Control: N/A Engineering Control: N/A
Administrative Control: Administrative Control: Site Manager
1. Stay away from dust whenever Supervisor must brief to worker
possible during tool box meeting.
2. Supervisor to ensure concrete PPE: All PPE must be inspected
debris are removed / guarded / 3 3 9 before use 3 1 3
WSHC
clearly marked out
3.Ensure housekeeping done Site
daily Supervisor
PPE: Appropriate PPE must be
provided
Page 22 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 23 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
21 Working under inclement Routine Struck by lightning Burns, Fatal, Elimination : NA Elimination : NA
weather conditions Electrocution Substitution : NA Substitution : NA
Engineering : NA Engineering :
Administrative : Lightning Warning System,
1. Safety Induction to remind Lightning protection System
workers to take shelter immediately Administrative :
upon sighting of lightning/thunder. 1. Posters/Warning Signages.
(ERP) 2. Regular reminders during mass
2. No using of umbrella during toolbox.
inclement weather conditon. 3. Stay away from objects that
3. Avoid water, and immediately conduct electricity (barbed wire
get out of and away from bodies of fences, power lines, etc.)
water (e.g., pools, lakes, ECM 4. If safe building structures are
Holding ponds) not accessible, employers should Site Manager
4. For personnel working as a guide workers to hard-topped
group at the outdoor during metal vehicles with rolled up
lightning conditions, it is windows. Remain in the vehicle
advisable to spread out. 5 2 10 for at least 30 minutes after 5 1 5
WSHC
5. During lightning conditions, hearing the last sound of thunder.
personnel should avoid high 5. Check with Singapore
ground or isolated trees and meteorological nowcast and
Site
take shelter forecast information at NEA’s Supervisor
6. All lifting activities must stop website
immediately. 6. Not to use radio operated
7. Cranes should be installed with devices in case of lightning.
adequate lightning protection 7. Mobile crane booms to be
properly grounded. retracted and brought down fully.
PPE : Basic PPE (Safety Helmet,
Rubber Boot/Safety Shoes,
Reflective vest)
Page 24 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 25 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 26 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 27 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 28 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
26 Haze & Dust Management Non Inhalation of fumes / Respiratory / Elimination : NA Elimination :
Routine pollutants / dust Lung diseases Substitution : NA Defer non-essential work.
Engineering : NA Substitution :
Irritation of the Administrative : 1. Promote use of mechanical
eyes, nose, and 1. Daily Monitoring of haze aids (e.g. trolleys, hoists) for
throat condition via NEA website. transporting or carrying heavy
2. Adhere to The MOH Health objects, instead of manual lifting
Advisory table for 24hr PSI. or carrying.
- ≤100 = Normal Activities Engineering : NA
Administrative:
- 101- 200 = Reduce prolonged
1. Schedule sufficient indoor rest
or strenuous outdoor physical breaks for workers performing
exertion. outdoor work.
- 201 – 300 = Avoid outdoor 2. Ensure adequate hydration for Site Manager
activities. workers.
- >300 = Minimise outdoor 3. Monitor employees’ health by
activity encouraging feedback on any
3. Adjust work assignments or 5 2 10 symptoms that may occur. 5 1 5
WSHC
rotate jobs to shorten the time 4. Awareness and Educational
spent in outdoor work. Posters/Warning Signages/
Site
4. Wet hacking area to reduce Refresher training.
5. Identify workers with pre- Supervisor
dust
PPE : Basic PPE existing chronic heart or lung
If prolonged or strenuous disease e.g. asthma, chronic
outdoor work is not avoidable obstructive pulmonary disease
at higher PSI, suitable masks (COPD), or heart failure.
or appropriate respirators 6. Send workers to see doctor if
should be provided. (Eg. N95 workers is unwell from the effect
mask) of haze.
Page 29 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
27 Heat Stress Routine Prolong hours under Heat Exhaustion Elimination : NA Engineering : NA
humid weather - Substitution : NA Administrative :
Insufficient intake / Heat Stroke Engineering : 1. Awareness and Educational
comsumption water Mechanical aids (e.g., lifting Posters/Warning Signages/
Fainting equipment and power tools) Refresher training.
should be used to reduce 2. Provide Adequate Water Intake
Muscle cramps physical workload, where and Drinking Facilities.
possible. 3. Workers should pass their pre-
employment medical
Heat Rash Administrative :
examinations.
1. Newly assigned workers,
4. Workers who are ill should
especially those who come from report to their supervisors and see
a colder climate must be a doctor before starting work to
acclimatised to the hot weather. assess their fitness to work.
2. Adjust work assignments or Site Manager
5. Conduct daily checks for
rotate jobs to shorten the time symptoms of flu and cold such as
spent in outdoor work. blocked nose,cough, sore throat,
3. Shaded areas (e.g., temporary 5 2 10 headache. 5 1 5
shelters) to be provided for WSHC
6. Educate workers to wear
workers who have to spend a appropriate loose-fitting and
significant amount of time under lightcoloured clothing while Site
the sun. working in the hot environment Supervisor
PPE : Basic PPE (Safety suitable to the task.
Helmet, Rubber Boot/Safety 7. Encourage workers to bring
Shoes, Reflective vest). theor personal water bottles to
their work place.
8. Conduct regular water parade
to encourage workers to consume
plenty of water.
Page 30 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
29 Covid19 / Pandemic Non Entry to site or Fatal infection; 1. Disallow worker's return to Elimination : NA
Outbreak Routine working on site or unwell with flu- workplace if unwell. Substitution: NA
office work like symptoms 2. Employer to provide ART kits Engineering: NA
for worker to conduct self check if Administrative: NA
worker with ARI symtomps. and 1. Employees/ workers to
see doctor if tested Ag+ monitor and must always comply
(positive). Report to employer with MOH/MOM/ BCA COVID
and supervisor in charge and do guidelines update
not go to site. PPE: wear surgical masks when
3. Worker tested ART Ag- go to public nad crowded area. Site Manager
(negetive) but with ARI symtomps
are required to wear Surgical
Mask or re-usable type mask and 5 3 15 5 2 10
should request from employer for WSHC
rest in dormitory for recovery.
worker required to wear a masks Site
if going for work. Supervisor
4. Maintain personal hygeine and
do not go to crowded places
unless for essential purposes eg
buying food or essential needs.
Page 31 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
30 Health and well being Non- Tower crane lifting Fatliity Elimination : NA Elimination : NA
Routine operation - runaway Substitution: NA Substitution: NA Site Manager
crane operation with Engineering; NA Engineering; NA
unconscious operator Administrative: Administrative:
(e.g. Operator with Medical examination for crane 5 3 15 Do not force to report to works if 5 2 10
uncontrolled high- operators age 50 and above feeling unwell WSHC
blood pressure)
Site
Supervisor
Page 32 of 97
Risk / Impact Evaluation Controls Additional Risk / Impact Controls
Hazard/ Aspect Identification (LOOK) Initial Residual Action Owner
(THINK) (DO)
Conditions
Occurrence
Occurrence
SN Additional Control Measures Action By/
Potential EHS ESH Outcome/ Action / Due
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation
Severity
Severity
Aspect / Hazard Consequences Date
design out this hazard) Person
Page 33 of 97
6 Usage of Routine Body hit Eliminati
Hand with on: N/A
Tools power Substitu
and tools tion: N/A
Electrical Enginee
tools ring
Control:
N/A
Adminis
trative
Control:
1. Only
trained
workers
are to
use with
the
machine
2.
Inspect
electrical
tools
prior use.
3.Do not
modify
electrical
tools.
4.
Ensure
monthly
LEW
inspectio
n is
carried
Manual Routine Pinch Elimination: N/A
Handling point / Substitution: N/A
hand Engineering Control: N/A
injury Administrative Control:
Ergonom 1.LMRA briefing conducted prior start
ics work.
2. Appropriate hand gloves must be worn.
3. Keep hands clear from load when
hoisting down to position.
4. Ensure that all sharp edges are
protected.
5.Adopt the use of mechanical assistance
6. Adopt correct manual handling methods.
7. Do not manual lift above 25 kg of
weight.
8.Adopt correct work posture.
9. Adopt buddy system when manual lifting 3
if weight is uncertain.
PPE: Appropriate PPE must be provided
Routine Sharp Elimination: N/A Substitution:
edges N/A Engineering Control: N/A
AdministrativeControl:
1) Tomaintaingood housekeepingatalltimes
2) Storerebarinorderlymanner
PPE : As required (Basic
PPE)WearsafetyHelmet,gloves,goggle,sho
e,reflective vest
3
Routine Struck by Elimination: N/A
Moving Substitution: N/A
Machiner Engineering Control:
y
1) Barricade The Perimeter of Trench /
Machinery Zone.
Administrative:
1) Ensure to The Workers to Be Mindful of
Working Radius of Machinery.
2) To Display Warning Signage
3) To Appointed Qualified Operator
4) Two-Way Communicate the Operator &
Banksman
5) Banks Man to Be Equipped with Whistle
to Guide the operator of the machinery
6) Banksman Monitoring Safe Distance 3
from Machinery
7) Ensure to The Workers to Be Mindful of
Working Radius of Machinery.
PPE : Safety
Helmet, Reflective vest, Hand gloves,
Safety goggles, Safety Shoes
Administrative:
1) Use Noise Reduce Machinery
2) Established Noise Reading Reports
Checklist
2 6 3 1 3
WSH Act Elimination: N/A
Substitution: N/A
WSH EngineeringControl:
(General 1)Rebaredgeprovideend gap.
Provision Administrative
) Reg Control:
1Arrangeinternaltrainingforrebarcutti
ngandbendingworks
PPE: Asrequired(BasicPPE)
2 6 3 1 3
WSH Act Elimination: N/A
Substitution: N/A
WSH Engineering Control: N/A
(General Administrative Control:
Provision Responsible Person Ensure -
) Reg 1. Conducted
daily TBM,
2. Close Supervision,
3. Regular Inspection,
4. Everyone
Follow the RA & SWP
2 6 3 1 3
3. Regular Inspection,
4. Everyone
Follow the RA & SWP
WSH Act Eliminati
on: N/A
WSH (General Provision) Reg Substitu
tion: N/A
Enginee
ring
Control:
N/A
Adminis
trative
Control:
1.
Conduct
regular
in-house
training
4 5 20 to 4 1
workers
on the
proper
erection
of
formwork
PPE:
Visual
check on
PPE to
ensure of
good
condition
before
use
WSH Act Eliminati
on: N/A
WSH (General Provision) Reg Substitu
tion: N/A
Enginee
ring
Control:
N/A
Adminis
trative
Control:
N/A
PPE:
Visual
check on
PPE to
4 3 12 ensure of 4 1
good
condition
before
use
WSH Act Eliminati
on: N/A
WSH (General Provision) Reg Substitu
tion: N/A
Enginee
ring
Control:
N/A
Adminis
trative
Control:
N/A
4 4 16 4 1
WSH Act Eliminati
on: N/A
WSH (General Provision) Reg Substitu
tion: N/A
Enginee
ring
Control:
N/A
Adminis
trative
Control:
1.
Continua
l
monitorin
g
3 3 9 PPE: 3 1
Basic
PPE
Routine Electrocution
Site
Manager
6
WSHC
Site
Supervis
or
Routine pinch Eliminati
point on: N/A
Substitu
tion: N/A
Enginee
Site ringcont
Manager rol: N/A
Adminis
trativeC
ontrol:
1)
Workers
are
WSHC reminded
tobe
mindful
of their
work
Site 2)
Supervis Workers
or are
reminded
not to
carry
rebar
that are
too
heavy
PPE : As
required
Routine Damage Eliminati
to utilities on: N/A
Substitu
tion: N/A
Enginee
ring
Control:
Site
Manager 1)
Service
Area
Must Be
Barricad
e
2)
WSHC Isolation
Or
Insulatio
n or
Divert of
Site Utilities
Supervis
or
Adminis
trative:
1)
Appointe
Routine Hydraulic Eliminati
Leakage on: N/A
from Substitu
Excavato tion: N/A
r Enginee
ring
Control:
Site
Manager 1)
Hydraulic
Hose
Secure
with
Properly
2)
WSHC Provide
Trip Tray
Site
Supervis
or
Adminis
trative:
1)
Operator
Everyday
Site
Manager
WSHC
Site
Supervis
or
Site
Manager
4
WSHC
Site
Supervis
or
Site
Manager
4
WSHC
Site
Supervis
or
Site
Manager
4
WSHC
Site
Supervis
or
Site
Manager
3
WSHC
Site
Supervis
or
Eliminati WSH Act Eliminati
on: N/A on: N/A
Substitu WSH Substitu
tion: N/A (General tion: N/A
Enginee Provision Enginee
ring ) Reg ring
Control: Control:
1. LOTO N/A
system Adminis
to be trative Site
impleme Control: Manager
nted 1.Briefin
where g to be
required. done
Adminis during
trative TBM
Control: 3 5 15 about the 3 2 6
1. hazards WSHC
Supervis working
or to with
ensure power
that tools.
electric 2.Superv Site
tools isor to Supervis
must regularly or
only be check
used the
with condition
approved of the
sticker wire prior
by LEW work
2.Ensure 3.Hang
that no the
works cables to
WSH Act Eliminati
on: N/A
WSH
(General
Provision Substitu
) Reg tion: N/A
Enginee
ringcont
rol:
1) Erect Site
proper Manager
rebar
cutting,b
ending
structure
3 3 9 3 1 3
2) WSHC
Providea
dequate
ventilatio
n
Adminis Site
trative Supervis
Control: or
1) Proper
use of
rebar
cutting
and
bending
machine
2) Brief
workers
WSH Act Eliminati
on: N/A
WSH Substitu
(General tion: N/A
Provision Enginee
) Reg ring
Control:
N/A
Adminis
trative Site
Control: Manager
1.
Conduct
regular
in-house
training
3 3 9 to 3 1 3
workers WSHC
for
excavtor
operation
.
PPE:Vis Site
ual Supervis
check on or
PPE to
ensure of
good
condition
before
use
WSH Act Eliminati
on: N/A
WSH Substituti
(General on: N/A
Provision Engineer
) Reg ing
Control:
N/A
Administr Site
ative Manager
Control:
Responsi
ble
Person
Ensure -
4 3 12 4 1 4
WSHC
1.
Conduct
ed daily
TBM, Site
Supervis
or
2.
Close
Supervisi
on,
3.
Risk Assessment Form
Company : eg: TPW RA Ref : eg: C3C7/RA/001 Rev No.: eg: Rev-01
Process/Activity & Location: eg: Bore piling works and load testing at Parcel 1 & 3 (RA Ref. to be given by maincon safety) (Latest Rev no.)
1 eg: Write the FULL Name as of ID/WP eg: Project Manager (RA Leader) eg: Sign here 5 eg: Write the FULL Name as of ID/WP eg: Rigger (Member) eg: Sign here
2 eg: Write the FULL Name as of ID/WP eg: Site Supervisor (Member) eg: Sign here 6 eg: Write the FULL Name as of ID/WP eg: Signalmen (Member) eg: Sign here
3 eg: Write the FULL Name as of ID/WP eg: WSH Coordinator (Member) eg: Sign here 7 eg: Write the FULL Name as of ID/WP eg: Lifitng Supervisor (Member) eg: Sign here
4 eg: Write the FULL Name as of ID/WP eg: Crawler Crane Operator (Member) eg: Sign here 8
Original RA Date: RA Review Date : RA Review Date : RA Review Date : RA Review Date :
Occurrence
Occurrence
SN Additional Control Measures Action By/ Action /
Potential EHS ESH Outcome/
Outcome
Outcome
Work Activity/ Sub-Activity Existing Control Measures References (First Consideration: How to Implementation Due
Severity
Severity
Aspect / Hazard Consequences
design out this hazard) Person Date
Engineering : Engineering :
Administrative : Administrative :
PPE : PPE :
Engineering : Engineering :
Administrative : Administrative :
PPE : PPE :
Engineering : Engineering :
Administrative : Administrative :
PPE : PPE :
0 0
Page 63 of 97
2 Deploym Routine 1. 1. Bodily Elimination: N/A
ent of Walking Injury Substitution: N/A
Workforc into (Minor or Engineering Control: N/A
e to hazardou Serious) Administrative Control:
Work s area/ 1. Workers to go for SIC
Site unauthori training and get
zed area familiarized with the rules
and regulation.
2. Site supervisor to do a 3 3
site orientation for newly
arrive workers.
3. CSOC
PPE: Workers must wear
safety helmet, boots and
high visibility vest, etc.
Site
Supervis
or
WSH Act Elimination: N/A
Substitution:
WSH (General N/A
Provision) Reg Engineering Site
Control: N/A Manager
Administrative
Control:
1. To check
workers
condition during
TBM and at
9 regular interval 3 1 3
WSHC
when required
2. Encourage
workforce to
drink sufficient
water. Site
PPE: Basic PPE Supervis
or
3 4 12 3 2
WSH Act Elimination: N/A
Substitution: N/A
WSH Engineering Control: N/A
(General Administrative Control:
Provision) 1. Close supervision by job
Reg supervisor
2. Periodic tool-box meeting
reminder to use long sleeve,
face shield & welding gloves etc.
PPE: Visual check on PPE to
ensure of good condition before
use
3 2 6 3 1
3 3 9 3 1
WSH Act Elimination: N/A
Substitution: N/A
WSH Engineering Control: N/A
(General Administrative Control:
Provision) 1. EHS personnel to have
Reg routine check on cable
2. To remind all workers on
electrical hazards through daily
toolbox briefing
3 4 12 3 2
WSH Act Elimination: N/A
Substitution: N/A
WSH Engineering Control: N/A
(General Administrative Control:
Provision) 1. Close Supervision and
Reg monitoring
PPE: Visual check on PPE to
ensure of good condition before
use
3 2 6 3 1
3 5 15 3 2
3 3 9 3 1
WSH Act Elimination: N/A
Substitution: N/A
WSH Engineering Control: N/A
(General Administrative Control:
Provision) 1. Close Supervision and
Reg monitoring
2. Daily Inspection
PPE: Visual check on PPE to
ensure of good condition before
use
3 3 9 3 1
Site
Manager
6
WSHC
Site
Supervis
or
Site
Manager
3
WSHC
Site
Supervis
or
Site
Manager
6
WSHC
Site
Supervis
or
Site
Manager
3
WSHC
Site
Supervis
or
Site
Manager
3
WSHC
Site
Supervis
or
Site
Manager
6
WSHC
Site
Supervis
or
Site
Manager
3
WSHC
Site
Supervis
or
Site
Manager
3
WSHC
Site
Supervis
or
Site
Manager
6
WSHC
Site
Supervis
or
Site
Manager
6
WSHC
Site
Supervis
or
Site
Manager
3
WSHC
Site
Supervis
or
Site
Manager
3
WSHC
Site
Supervis
or