Common Documents are the ones that will be used by both ABC and SKEC.
SKEC will assist ABC in producing the documents by reviewing them and
For Documents produced through the joint activities, such as Plot Plan and
units and hand them over to ABC at the end of the project.
넘겨줄 것입니다.
All other documents that we produce during the project will be owned by
가 계속 가지게 될 것입니다.
I think you have to define a clear leader-follower relationship for each item in
PMC:
order to prevent the vendors from receiving two different sets of comments.
We have already defined such relationships for each and every piece of
SK:
equipment.
OK.
PMC:
알겠습니다.
We will concentrate our efforts on the basic engineering design for the first 5
SK:
to 6 months.
After the basic engineering period, detail design works will follow.
그것도 역시 약 5, 6 개월 정도 걸릴 것입니다.
For both periods, we will dispatch our engineers to the ABC’s office to