By the end of this year, we will finish 70% of engineering progress, and by the
PMC: Is this master schedule for SKA Consortium, or for SKEC only?
SK: This is for SKEC only, but it is tightly in line with the consortium schedule.
알겠습니다. 계속 가시지요.
SK: Considering the tightness of the schedule, we have already started the
이 스케줄을 줄일 수 있습니까?
알겠습니다.
SK: In brief, early issuance of P/Os for critical items is essential for the timely
completion.
기본입니다.
Even if everything goes well, we will be hard-pressed to erect the critical items
in a timely manner.
받게 될 것입니다.
This is why we are focusing on the early issuance of P/Os.
첫번째 것은 이미 말씀 드렸고,
For the procurement of the critical LLIs, we are performing concurrent and
joint vender print reviews to reduce time loss that can possibly or probably
The joint effort also applies to the document management in order to shorten
PMC: This project is a multi-interface project: many parties are involved, and a lot of
양의 정보를 주고 받게 될 것입니다.
How will you control if there is any discrepancy between the client’s
것입니까?
SK: We think face-to-face communication is the most effective way to address that
kind of problems.
효과적이라고 생각합니다.
PMC: Have you established any formal procedure to control the interface?
SK: Not yet, but I think such kind of formality may sometimes hinder the progress.
있다고 봅니다.
We will provide some rules to control those things next meeting though.