1.2.2.3 Engineering Audit Q&A 2 - Civil Engg
1.2.2.3 Engineering Audit Q&A 2 - Civil Engg
We had lots of difficulties in the previous project there because the bedrock
파일 작업은 6 월에 시작합니다.
What is the name of the subcontractor, who conducted the design job?
AUD:
Yes.
SK:
그렇습니다.
CAD.
SK:
CAD 입니다.
The subcontractor carries out the calculation using its own program.
SK:
preparation subcontractor.
그 소프트웨어는 무엇이지요?
ALLPILE.
SK:
ALLPILE 입니다.
It is a commercial program.
SK:
그건 상용 프로그램입니다.
OK. Then we will show you the results of our manual calculation and those
SK:
from ALLPILE.
보여드리도록 하겠습니다.
OK, fine.
AUD:
예, 좋습니다.
In the mean time, the Earthquake Zone for the site has recently been changed
해일 때문입니까?
I don’t know. The government suddenly changed it.
AUD:
In the project specification, there is nothing about Zone 1, and we have never
SK:
heard of that change.
또 풍하중조건도 바뀌었습니다.
OK.
SK:
알겠습니다.
Once engineers print out and make copies, they seldom update them.
기밀 정보들이 있을 수도 있겠습니다.
혼란스러웠다면 죄송합니다.
Thank you.
SK:
감사합니다.