Checklist Page 1 of 4
Click here
Remarks:
01167563 Rev. 01
Pausch Medical GmbH Uroview® FD Maintenance Seite 2 von 4
Checklist Page 2 of 4
Uroview® FD
semiannual
annual
three year
☐ ☒ ☐ Floor anchor
☐ ☒ ☐ Tabletop drive
☐ ☒ ☐ Tabletop
☐ ☒ ☐ Accessories
☐ ☒ ☐ Manuals
☐ ☒ ☐ General Information
01167563 Rev. 01
Pausch Medical GmbH Uroview® FD Maintenance Seite 3 von 4
Checklist Page 3 of 4
Generator Spellman
semiannual
annual
Three year
☐☒ ☐ Operating console:
☐☒ ☐ H.V Cables:
System
semiannual
annual
Three year
Comment
KV – control measurement
Use TEST ATH testsheet
Switch off AEC
No filters
50mAs
☐☒ ☐ cutoff dose
Use TEST ATH testsheet
Filter: 21mm Al
Grid out
Put the dosemeter onto the measuring chamber next to the
mean chamber
Take measurements for all three chambers in normal mode
And one measurement for all 4 modes with the mean cham-
ber
dose rate
Use TEST ATH testsheet
Filter: --
Grid: --
Format: 43x43
continuous fluoro
dosemeter 30cm above table
☐ ☒ ☐
Parameter dose
maximum kV and mA µGy/sec ≤ 1088 µGy/sec
maximum kV and mA µGy/sec ≤ *
HIRIS
Semiannual
annual
Three year
Detector calibration
☒ ☐ ☐
Acceptance Test
☐ ☒ ☐ use document 01167543
01167563 Rev. 01