1 19-Feb

Keyword /
Discipline NCR Ref. No. Area Level Description of NCR Issue Date Status QC Engineer Remarks
Activity
Hollow sound and cracks noticed on the floor
Finishes NCR-445 Screed Podium_5 B2 3-Nov-16 Open Sirajuddin
in LV Room
Waterproof NCR-454 Sub-Structure Podium_3 B2 Water inside cable trench 28-Nov-16 Open Sirajuddin

Finishes NCR-571 Marble Work Podium_3 GF Marble cladding in Drop off area 11-Nov-17 Rejected Sirajuddin Abanos

Finishes NCR-588 Block Podium_3 Missing Block wall in MEP room (SOR-507) 22-Nov-17 Open Sirajuddin
Installing Wooden wall cladding not as per
Finishes NCR-608 Joinery Works Tower_1 L3 20-Dec-17 Open Sirajuddin
approved drawing at fitness center
Kitchen Cabinets not matching the approved
Finishes NCR-609 Joinery Works Tower_1 L3 24-Dec-17 Rejected Sirajuddin
drawing
Finishes NCR-611 Joinery Works Tower_1 L3 Wrong Installing of blinds in fitness center 26-Dec-17 Open Sirajuddin

Finishes SOR-507 Block Podium_5 Missing Block wall In MEP Room 26-Oct-17 Open Bajo