PVsyst TRIAL
Project: Moyobamba 1
Variant: Nueva variante de simulación
Stand alone system with batteries
System power: 2080 Wp
Moyobamba - Peru
PVsyst TRIAL
PVsyst TRIAL
PVsyst V7.1.2
VC0, Simulation date:
24/01/21 01:47
with v7.1.2
Project summary
Geographical Site Situation Project settings
Moyobamba Latitude -6.04 °S Albedo 0.20
Peru Longitude -76.99 °W
Altitude 864 m
PVsyst TRIAL
Time zone UTC-5
Meteo data
Moyobamba
Meteonorm 7.3, Sat=100% - Sintético
System summary
Stand alone system Stand alone system with batteries
PVsyst TRIAL
System information
PV Array
Nb. of modules
Pnom total
8 units
2080 Wp
Battery pack
Technology
Nb. of units
Voltage
Capacity
Lead-acid, vented, plates
4 units
24 V
200 Ah
Results summary
Available Energy 3359 kWh/year Specific production 1615 kWh/kWp/year Perf. Ratio PR 143.46 %
Used Energy 5834 kWh/year Solar Fraction SF 33.28 %
Table of contents
PVsyst TRIAL
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Detailed User's needs 4
Main results 5
Loss diagram 6
Special graphs 7
PVsyst TRIAL
24/01/21 PVsyst Evaluation mode Page 2/7
Project: Moyobamba 1
Variant: Nueva variante de simulación
PVsyst V7.1.2
VC0, Simulation date:
24/01/21 01:47
with v7.1.2
General parameters
Stand alone system Stand alone system with batteries
PVsyst TRIAL
Seasonal tilt adjustment Transposition Perez Constant over the year
azimuth 0° Diffuse Perez, Meteonorm Average 48 kWh/Day
Summer Tilt 20 ° Circumsolar separate
winter 50 °
Apr.-May-June-July-Aug.-Sep.-
PV Array Characteristics
PV module Battery
Manufacturer Generic Manufacturer Generic
Model AS-P603-260 Model Open 12V / 100 Ah
(Original PVsyst database) Technology Lead-acid, vented, plates
Unit Nom. Power 260 Wp Nb. of units 2 in parallel x 2 in series
Number of PV modules 8 units Discharging min. SOC 20.0 %
Nominal (STC) 2080 Wp Stored energy 3.8 kWh
PVsyst TRIAL
Modules 1 String x 8 In series Battery Pack Characteristics
At operating cond. (50°C) Voltage 24 V
Pmpp 1873 Wp Nominal Capacity 200 Ah (C10)
U mpp 221 V Temperature Fixed 20 °C
I mpp 8.5 A
Total PV power
Nominal (STC) 2 kWp
PVsyst TRIAL
Total 8 modules
Module area 13.0 m²
Array losses
Thermal Loss factor DC wiring losses Serie Diode Loss
Module temperature according to irradiance Global array res. 438 mΩ Voltage drop 0.7 V
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC Loss Fraction 0.3 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
0° 30° 50° 60° 70° 75° 80° 85° 90°
1.000 0.999 0.987 0.962 0.892 0.816 0.681 0.440 0.000
PVsyst V7.1.2
VC0, Simulation date:
24/01/21 01:47
with v7.1.2
PVsyst TRIAL
W Hour/day Wh/day
Motobomba 4 2400W/app 5.0 48000
Consumidores en espera 24.0 24
Total daily energy 48024Wh/day
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
24/01/21 PVsyst Evaluation mode Page 4/7
Project: Moyobamba 1
Variant: Nueva variante de simulación
PVsyst V7.1.2
VC0, Simulation date:
24/01/21 01:47
with v7.1.2
Main results
System Production
Available Energy 3359 kWh/year Specific production 1615 kWh/kWp/year
Used Energy 5834 kWh/year Performance Ratio PR 143.46 %
Excess (unused) 2 kWh/year Solar Fraction SF 33.28 %
PVsyst TRIAL
Loss of Load Battery aging (State of Wear)
Time Fraction 83.0 % Cycles SOW 90.8 %
Missing Energy 11695 kWh/year Static SOW 90.0 %
PVsyst TRIAL
May 172.1 185.6 323.6 0.000 951 538.0 1489 0.361
June 158.8 183.8 322.1 0.009 918 522.4 1441 0.363
July 165.1 188.6 333.0 0.000 950 538.7 1489 0.362
August 175.7 175.5 311.9 0.000 977 512.2 1489 0.344
September 178.1 144.5 260.3 0.000 956 484.7 1441 0.336
October 176.0 161.0 283.7 0.009 990 498.8 1489 0.335
November 165.6 140.3 250.2 0.000 992 449.1 1441 0.312
December 173.5 140.8 249.0 0.000 1026 463.2 1489 0.311
Year 2018.5 1908.9 3359.0 2.092 11695 5833.8 17529 0.333
Legends
GlobHor Global horizontal irradiation E_User Energy supplied to the user
GlobEff Effective Global, corr. for IAM and shadings E_Load Energy need of the user (Load)
PVsyst TRIAL
E_Avail Available Solar Energy SolFrac Solar fraction (EUsed / ELoad)
EUnused Unused energy (battery full)
E_Miss Missing energy
PVsyst V7.1.2
VC0, Simulation date:
24/01/21 01:47
with v7.1.2
Loss diagram
2018 kWh/m² Global horizontal irradiation
PVsyst TRIAL
-2.36% IAM factor on global
-4.20%
-0.04%
Unused energy (battery full)
Effective energy at the output of the array
PVsyst TRIAL
11695 kWh 5834 kWh
17529 kWh
Energy supplied to the user
PVsyst V7.1.2
VC0, Simulation date:
24/01/21 01:47
with v7.1.2
Special graphs
Diagrama entrada/salida diaria
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
24/01/21 PVsyst Evaluation mode Page 7/7