GENERAL INFORMATION
Project: Construction of Al Falah Police Station Client: Abu Dhabi Police
Consultant: Musanada Contractor: Al Eslah General Contracting Est.
Conducted By: Date:
Poor: Absence of major control measures (High risk), works to be stopped and risk assessment to be reviewed immediately.
Fair: Some minor controls are missing (medium risk), Additional control measures to be implemented
Good: All control measures are in place (low risk), only monitoring is required
DESCRIPTION
Evaluation
Items Remarks
Good Fair Poor N/A
Cranes & Slings certified by 3rd party, inspected
& maintained regularly
Lifting plan / procedure prepared and
communicated
All lifting equipments & gears are inspected and
3rd party certified
Operator & rigger are competent (3rd party
trained). The driver and operator are licensed
Slings, wires, ropes, chains, belts, hooks,
shackles are in good condition, appropriate for
job & inspected regularly & records maintained
Load charts known & considered before any
lifting begins
Load indicators, alarms & other safety devices
are operational
Ground condition checked & required corrective
actions implemented
Outriggers are operational & sold plate provided
Lifting operation area barricaded & suitable sign
boards are in place
Monthly inspection carried out for all
Monthly colour code available with the tools
Safety latches are available with all the hooks
lifting accessories stored away from sharp tools
Load chart is available in the crane
Swl clearly marked at equipment accessories
Approved By:
Position Name Date Signature
HSE Officer Munir Ahmad Tech IOSH
Project Engineer Ahmad Zeshan
Project Manager Amin Mohammad