LIFTING EQUIPMENTS AND GEARS CHECKLIST

GENERAL INFORMATION
Project: Construction of Al Falah Police Station Client: Abu Dhabi Police
Consultant: Musanada Contractor: Al Eslah General Contracting Est.
Conducted By: Date:
Poor: Absence of major control measures (High risk), works to be stopped and risk assessment to be reviewed immediately.
Fair: Some minor controls are missing (medium risk), Additional control measures to be implemented
Good: All control measures are in place (low risk), only monitoring is required

DESCRIPTION

Evaluation
Items Remarks
Good Fair Poor N/A
Cranes & Slings certified by 3rd party, inspected
   
& maintained regularly
Lifting plan / procedure prepared and
   
communicated
All lifting equipments & gears are inspected and
   
3rd party certified
Operator & rigger are competent (3rd party
   
trained). The driver and operator are licensed
Slings, wires, ropes, chains, belts, hooks,
shackles are in good condition, appropriate for    
job & inspected regularly & records maintained
Load charts known & considered before any
   
lifting begins
Load indicators, alarms & other safety devices
   
are operational
Ground condition checked & required corrective
   
actions implemented
Outriggers are operational & sold plate provided    
Lifting operation area barricaded & suitable sign
   
boards are in place
Monthly inspection carried out for all    
Monthly colour code available with the tools    
Safety latches are available with all the hooks    
lifting accessories stored away from sharp tools    
Load chart is available in the crane    
Swl clearly marked at equipment accessories    

Approved By:
Position Name Date Signature
HSE Officer Munir Ahmad Tech IOSH
Project Engineer Ahmad Zeshan
Project Manager Amin Mohammad

Doc Ref: AE/AD/PSAF/EHS/LE&G/F-13 Rev : 01 20.08.2016 Page 1 of 1