Version 7.2.

21

PVsyst TRIAL
PVsyst - Simulation report
Pumping PV System

Project: examen_pompe
Variant: Nouvelle variante de simulation
Pumping PV System
System power: 520 Wp

PVsyst TRIAL La Gazelle - Tunisia

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: examen_pompe
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
13/11/23 09:45

PVsyst TRIAL
with v7.2.21

Project summary
Geographical Site Situation Project settings
La Gazelle Latitude 36.90 °N Albedo 0.20
Tunisia Longitude 10.19 °E
Altitude 7m
Time zone UTC+1

Meteo data
La Gazelle
Meteonorm 8.0 (1991-2000), Sat=34 % - Synthétique

System summary

PVsyst TRIAL
Pumping PV System Deep Well to Storage

PV Field Orientation Water needs


Fixed plane Yearly constant 6.00 m³/day
Tilt/Azimuth 34 / 0 °

System information
PV Array
Nb. of modules 2 units
Pnom total 520 Wp

Results summary
Water Energy Efficiencies
Water Pumped 2136 m³ Energy At Pump 436 kWh System efficiency 51.3 %
Specific 1606 m³/kWp/bar Specific 0.20 kWh/m³ Pump efficiency 35.6 %

PVsyst TRIAL
Water needs
Missing Water
2190

Project and results summary


2.5

%
Unused (tank full)
Unused PV energy
Unused Fraction

Table of contents
338 kWh
39.9 %

2
General parameters, PV Array Characteristics, System losses 3
Main results 5
Loss diagram 6
Special graphs 7

PVsyst TRIAL

PVsyst TRIAL
13/11/23 PVsyst Evaluation mode Page 2/7
Project: examen_pompe
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
13/11/23 09:45

PVsyst TRIAL
with v7.2.21

General parameters
Pumping PV System Deep Well to Storage

System Requirements Well characteristics Storage tank


Basic Head 25 meterW Static level depth -15.0 m Volume 6.0 m³
Water needs Specific drawdown -0.10 m/m³/h Diameter 2.0 m
Yearly constant 6.00 m³/day Diameter 50 cm Feeding by top
Pump level -25.0 m Feeding altitude 10.0 m
Lower dynamic level -20.0 m Height (full level) 1.9 m

Hydraulic circuit PV Field Orientation


Piping length 35 m Fixed plane
Pipes PE20 Tilt/Azimuth 34 / 0 °

PVsyst TRIAL
Dint 22 mm

PV Array and Pump


PV module Pump
Manufacturer Generic Manufacturer Generic
Model YL260P-29b Model PS20-HR-07 - MPPT
(Original PVsyst database) Pump Technology Progressive cavity
Unit Nom. Power 260 Wp Deep well pump
Number of PV modules 2 units Motor DC motor, brushless
Nominal (STC) 520 Wp Associated or Integrated converter
Modules 2 Strings x 1 In series Type MPPT
At operating cond. (50°C) Voltage range 24 - 60 V
Pmpp 465 Wp Operating conditions
U mpp 27 V

PVsyst TRIAL
I mpp 17 A Head min. Head Nom Head max.
1.0 30.0 40.0 m
Total PV power
Nominal (STC) 0.520 kWp Corresp. Flowrate 1.22 1.21 1.16 m³/h
Total 2 modules Req. power 170 270 300 W

Control device
Model Generic device (optimised for the system)
System Configuration MPPT-DC converter

Pumping system controller


System Operating Control
Generic device params adjusted acc. to the system
Power Conditioning Unit
Type MPPT-DC converter

PVsyst TRIAL
Operating conditions
Nominal power 320 W
Power Threshold 3 W
Max. efficiency 97.0 %
EURO efficiency 95.0 %
Minimum MPP Voltage 24 V
Maximum MPP Voltage 60 V
Maximum Array Voltage 100 V
Maximum Input Current 7.0 A

PVsyst TRIAL
13/11/23 PVsyst Evaluation mode Page 3/7
Project: examen_pompe
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
13/11/23 09:45

PVsyst TRIAL
with v7.2.21

System losses
Thermal Loss factor DC wiring losses LID - Light Induced Degradation
Module temperature according to irradiance Global array res. 27 mΩ Loss Fraction 1.3 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module Quality Loss Module mismatch losses Strings Mismatch loss


Loss Fraction -0.8 % Loss Fraction 0.0 % at MPP Loss Fraction 0.1 %

IAM loss factor


Incidence effect (IAM): User defined profile

0° 20° 40° 60° 70° 75° 80° 85° 90°

PVsyst TRIAL
1.000 1.000 1.000 0.960 0.880 0.800 0.670 0.430 0.000

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL
13/11/23 PVsyst Evaluation mode Page 4/7
Project: examen_pompe
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
13/11/23 09:45

PVsyst TRIAL
with v7.2.21

Main results
System Production
Water Energy Efficiencies
Water Pumped 2136 m³ Energy At Pump 436 kWh System efficiency 51.3 %
Specific 1606 m³/kWp/bar Specific 0.20 kWh/m³ Pump efficiency 35.6 %
Water needs 2190 m³ Unused (tank full)
Missing Water 2.5 % Unused PV energy 338 kWh
Unused Fraction 39.9 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

PVsyst TRIAL
January
February
March
April
GlobEff
kWh/m²
107.3
117.5
153.9
171.1
EArrMPP
kWh
51.98
56.63
72.98
79.06
E_PmpOp
kWh
33.91
33.72
37.63
36.61
ETkFull
kWh
13.07
17.17
28.42
33.61
H_Pump
meterW
26.03
26.13
26.10
26.10
WPumped

165.8
165.9
185.0
179.3
W_Used

168.8
161.5
185.0
179.3
W_Miss

17.21
6.54
0.97
0.71
May 190.0 86.33 37.97 40.32 26.04 186.0 186.0 0.00
June 190.8 84.70 36.88 40.99 26.03 180.0 180.0 0.00
July 206.9 89.62 38.24 44.39 26.08 186.0 186.0 0.00
August 196.4 85.43 38.13 40.63 26.09 186.0 186.0 0.00
September 165.0 73.95 36.48 31.13 26.12 179.9 180.0 0.00
October 143.8 65.43 36.70 22.89 26.11 180.6 180.7 5.30
November 112.4 53.28 34.72 14.71 26.09 171.4 171.9 8.10

PVsyst TRIAL
December 100.4 48.86 34.52 11.07 26.04 170.2 169.7 16.26
Year 1855.5 848.25 435.52 338.39 26.08 2136.2 2134.9 55.09

Legends
GlobEff Effective Global, corr. for IAM and shadings WPumped Water volume pumped
EArrMPP Array virtual energy at MPP W_Used Water drawn by the user
E_PmpOp Pump operating energy W_Miss Missing water
ETkFull Unused energy (tank full)
H_Pump Average total Head at pump

PVsyst TRIAL
13/11/23 PVsyst Evaluation mode Page 5/7
Project: examen_pompe
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
13/11/23 09:45

PVsyst TRIAL
with v7.2.21

Loss diagram
1684 kWh/m² Global horizontal irradiation
+12.5% Global incident in coll. plane

-2.07% IAM factor on global

1856 kWh/m² * 3 m² coll. Effective irradiation on collectors

efficiency at STC = 16.01% PV conversion

965 kWh Array nominal energy (at STC effic.)


-0.32% PV loss due to irradiance level

PVsyst TRIAL +0.75%

-1.30%
-0.10%
-10.24% PV loss due to temperature

Module quality loss

LID - Light induced degradation


Mismatch loss, modules and strings
-1.08% Ohmic wiring loss
848 kWh Array virtual energy at MPP
-2.56% Converter Loss during operation (efficiency)

-6.25% Converter Loss over nominal conv. power

-0.02% Converter Loss due to power threshold

PVsyst TRIAL
0.00% Converter Loss over nominal conv. voltage
0.00% Converter Loss due to voltage threshold
-0.10% En. under pump producing threshold
774 kWh Electrical losses (converter, thresholds, overload)

0.00% Energy under drawdown limit

-43.72% Unused energy (tank full)

436 kWh Operating electrical energy at pump

PVsyst TRIAL
155 kWh Pump efficiency = 35.6% Hydraulic energy at pump

25 meterW Static head requirement (no flow)

-0.31% Well: drawdown head loss


-3.84% Friction head loss
2136 m³ Aver. Head = 26.1 meterW Water volume pumped
-0.06% Stored water balancebegin/end of interval

Missing: 55 m³ 2135 m³ supplied (97.5%of needs) User's water needs

PVsyst TRIAL
13/11/23 PVsyst Evaluation mode Page 6/7
Project: examen_pompe
Variant: Nouvelle variante de simulation

PVsyst V7.2.21
VC0, Simulation date:
13/11/23 09:45

PVsyst TRIAL
with v7.2.21

Special graphs
Diagramme d'entrée/sortie journalier

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL
13/11/23 PVsyst Evaluation mode Page 7/7