PVsyst - Simulation report
Pumping PV System

Project: Nuevo Proyecto de campanero cotoca bolivia


Variant: Nueva variante de simulación
Pumping PV System
System power: 10.00 kWp

PVsyst TRIAL Campanero cotoca - Bolivia

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: Nuevo Proyecto de campanero cotoca bolivia
Variant: Nueva variante de simulación

PVsyst V7.3.3
VC0, Simulation date:
10/04/23 22:48

PVsyst TRIAL
with v7.3.3

Project summary
Geographical Site Situation Project settings
Campanero cotoca Latitude -17.74 °S Albedo 0.20
Bolivia Longitude -62.96 °W
Altitude 334 m
Time zone UTC-4

Meteo data
campanero cotoca
Meteonorm 8.1 (2010-2017), Sat=100% - Sintético

System summary

PVsyst TRIAL
Pumping PV System Deep Well to Storage

PV Field Orientation Water needs


Fixed plane Yearly constant 20.00 m³/day
Tilt/Azimuth 16 / 0 °

System information
PV Array
Nb. of modules 40 units
Pnom total 10.00 kWp

Results summary
Water Energy Efficiencies
Water Pumped 4224 m³ Energy At Pump 3474 kWh System efficiency 19.8 %
Specific 40 m³/kWp/bar Specific 0.82 kWh/m³ Pump efficiency 36.5 %

PVsyst TRIAL
Water needs
Missing Water
7300
42.1

Project and results summary



%
Unused (tank full)
Unused PV energy
Unused Fraction

Table of contents
47 kWh
0.3 %

2
General parameters, PV Array Characteristics, System losses 3
Main results 5
Loss diagram 6
Predef. graphs 7

PVsyst TRIAL

PVsyst TRIAL
10/04/23 PVsyst Evaluation mode Page 2/7
Project: Nuevo Proyecto de campanero cotoca bolivia
Variant: Nueva variante de simulación

PVsyst V7.3.3
VC0, Simulation date:
10/04/23 22:48

PVsyst TRIAL
with v7.3.3

General parameters
Pumping PV System Deep Well to Storage

System Requirements Well characteristics Storage tank


Basic Head 9.5 bar Static level depth -82 m Volume 20.0 m³
Water needs Specific drawdown -2.83 m/m³/h Diameter 4.0 m
Yearly constant 20.00 m³/day Diameter 15 cm Feeding by top
Pump level -104 m Feeding altitude 15.0 m
Lower dynamic level -99 m Height (full level) 1.6 m

Hydraulic circuit PV Field Orientation


Piping length 160 m Fixed plane
Pipes DN50 Tilt/Azimuth 16 / 0 °

PVsyst TRIAL
Dint 53 mm

PV Array and Pump


PV module Pump
Manufacturer Generic Manufacturer Generic
Model Mono 250 Wp 60 cells Bifacial Model PSk2-7 C-SJ8-30
(Original PVsyst database) Pump Technology Centrifugal Multistage
Unit Nom. Power 250 Wp Deep well pump
Number of PV modules 40 units Motor AC motor, triphased
Nominal (STC) 10.00 kWp Associated or Integrated converter
Modules 2 Strings x 20 In series Type MPPT
At operating cond. (50°C) Voltage range 500 - 850 V
Pmpp 8.99 kWp Operating conditions
U mpp 550 V

PVsyst TRIAL
I mpp 16 A Head min. Head Nom Head max.
5.89 9.81 15.70 m
Total PV power
Nominal (STC) 10 kWp Corresp. Flowrate 12.79 10.21 6.19 m³/h
Total 40 modules Req. power 6300 6300 6300 W

Control device
Model Generic device (optimised for the system)
System Configuration MPPT-AC inverter

Pumping system controller


System Operating Control
Generic device params adjusted acc. to the system
Power Conditioning Unit
Type MPPT-AC inverter

PVsyst TRIAL
Operating conditions
Nominal power 8000 W
Power Threshold 80 W
Max. efficiency 98.0 %
EURO efficiency 96.0 %
Minimum MPP Voltage 500 V
Maximum MPP Voltage 850 V
Maximum Array Voltage 850 V
Maximum Input Current 13.0 A

PVsyst TRIAL
10/04/23 PVsyst Evaluation mode Page 3/7
Project: Nuevo Proyecto de campanero cotoca bolivia
Variant: Nueva variante de simulación

PVsyst V7.3.3
VC0, Simulation date:
10/04/23 22:48

PVsyst TRIAL
with v7.3.3

System losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 565 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses Strings Mismatch loss


Loss Fraction 2.0 % at MPP Loss Fraction 0.2 %

IAM loss factor


Incidence effect (IAM): Fresnel smooth glass, n = 1.526

0° 30° 50° 60° 70° 75° 80° 85° 90°

PVsyst TRIAL
1.000 0.998 0.981 0.948 0.862 0.776 0.636 0.403 0.000

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL
10/04/23 PVsyst Evaluation mode Page 4/7
Project: Nuevo Proyecto de campanero cotoca bolivia
Variant: Nueva variante de simulación

PVsyst V7.3.3
VC0, Simulation date:
10/04/23 22:48

PVsyst TRIAL
with v7.3.3

Main results
System Production
Water Energy Efficiencies
Water Pumped 4224 m³ Energy At Pump 3474 kWh System efficiency 19.8 %
Specific 40 m³/kWp/bar Specific 0.82 kWh/m³ Pump efficiency 36.5 %
Water needs 7300 m³ Unused (tank full)
Missing Water 42.1 % Unused PV energy 47 kWh
Unused Fraction 0.3 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

PVsyst TRIAL
January
February
March
April
GlobEff
kWh/m²
191.0
169.2
190.3
174.1
EArrMPP
kWh
1602
1434
1601
1485
E_PmpOp
kWh
314.1
316.3
306.6
242.4
ETkFull
kWh
2.95
10.50
0.59
0.00
H_Pump
meterW
106.8
107.3
107.8
106.7
WPumped

372.8
380.9
376.6
289.3
W_Used

374.0
384.3
374.3
297.1
W_Miss

246.0
175.7
245.7
302.9
May 166.3 1442 233.6 0.00 106.0 266.1 264.2 355.8
June 144.8 1286 312.8 0.66 107.0 375.4 377.4 222.6
July 157.4 1385 286.6 0.00 107.5 351.9 351.9 268.1
August 155.9 1353 289.5 0.00 107.4 355.5 355.5 264.5
September 165.9 1419 253.8 0.00 106.1 294.1 294.1 305.9
October 180.7 1530 289.0 0.19 107.5 358.5 358.5 261.5
November 176.0 1492 311.9 18.84 108.4 398.1 398.1 201.9

PVsyst TRIAL
December 182.8 1554 317.3 13.45 108.3 404.2 404.2 215.8
Year 2054.5 17583 3473.8 47.18 107.3 4223.5 4233.5 3066.5

Legends
GlobEff Effective Global, corr. for IAM and shadings WPumped Water volume pumped
EArrMPP Array virtual energy at MPP W_Used Water drawn by the user
E_PmpOp Pump operating energy W_Miss Missing water
ETkFull Unused energy (tank full)
H_Pump Average total Head at pump

PVsyst TRIAL
10/04/23 PVsyst Evaluation mode Page 5/7
Project: Nuevo Proyecto de campanero cotoca bolivia
Variant: Nueva variante de simulación

PVsyst V7.3.3
VC0, Simulation date:
10/04/23 22:48

PVsyst TRIAL
with v7.3.3

Loss diagram
2029 kWh/m² Global horizontal irradiation
+4.2% Global incident in coll. plane

-2.78% IAM factor on global

2054 kWh/m² * 65 m² coll. Effective irradiation on collectors

efficiency at STC = 15.36% PV conversion

20536 kWh Array nominal energy (at STC effic.)


-0.41% PV loss due to irradiance level

PVsyst TRIAL 17583 kWh


+0.75%

-2.15%
-1.18%
-11.76% PV loss due to temperature

Module quality loss

Mismatch loss, modules and strings


Ohmic wiring loss
Array virtual energy at MPP
-2.63% Converter Loss during operation (efficiency)
-0.17% Converter Loss over nominal conv. power
-0.04% Converter Loss due to power threshold
0.00% Converter Loss over nominal conv. voltage
-0.54% Converter Loss due to voltage threshold
-2.40% En. under pump producing threshold

PVsyst TRIAL 16585 kWh

-78.77%
Electrical losses (converter, thresholds, overload)

Energy under drawdown limit

-1.34% Unused energy (tank full)


3474 kWh Operating electrical energy at pump

PVsyst TRIAL
1268 kWh Pump efficiency = 36.5% Hydraulic energy at pump

97 meterW Static head requirement (no flow)

-8.81% Well: drawdown head loss


-0.82% Friction head loss
4224 m³ Aver. Head = 107.3 meterW Water volume pumped
+0.24% Stored water balancebegin/end of interval

Missing: 3066 m³ 4234 m³ supplied (58.0%of needs) User's water needs

PVsyst TRIAL
10/04/23 PVsyst Evaluation mode Page 6/7
Project: Nuevo Proyecto de campanero cotoca bolivia
Variant: Nueva variante de simulación

PVsyst V7.3.3
VC0, Simulation date:
10/04/23 22:48

PVsyst TRIAL
with v7.3.3

Predef. graphs
Diagrama entrada/salida diaria

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL
10/04/23 PVsyst Evaluation mode Page 7/7