PVsyst - Simulation report


Pumping PV System

PVsyst classroom
Project: pompage_amine_jessica
Variant: Nouvelle variante de simulation
Pumping PV System
System power: 240 Wp
La Gazelle - Tunisia

PVsyst classroom

PVsyst classroom

PVsyst classroom Author


ESPRIT (Tunisia)
Project: pompage_amine_jessica
Variant: Nouvelle variante de simulation

PVsyst V7.2.6 ESPRIT (Tunisia)


VC0, Simulation date:
01/11/21 14:19
with v7.2.6

Project summary
Geographical Site Situation Project settings
La Gazelle Latitude 36.90 °N Albedo 0.20
Tunisia Longitude 10.19 °E
Altitude 7m

PVsyst classroom
Meteo data
La Gazelle
Time zone

Meteonorm 8.0 (1991-2000), Sat=34 % - Synthétique


UTC+1

System summary
Pumping PV System Deep Well to Storage

PV Field Orientation Water needs


Fixed plane Yearly constant 5.00 m³/day
Tilt/Azimuth 15 / 0 °

System information

PVsyst classroom
PV Array
Nb. of modules 1 Unit
Pnom total 240 Wp

Results summary
Water Energy Efficiencies
Water Pumped 62 m³ Energy At Pump 16 kWh System efficiency 4.4 %
Specific 150 m³/kWp/bar Specific 0.26 kWh/m³ Pump efficiency 19.2 %
Water needs 1825 m³ Unused (tank full)
Missing Water 96.6 % Unused PV energy 0 kWh
Unused Fraction 0.0 %

Table of contents

PVsyst classroom
Project and results summary
General parameters, PV Array Characteristics, System losses
Main results
Loss diagram
Special graphs
2
3
5
6
7

PVsyst classroom
01/11/21 PVsyst Classroom License, ESPRIT (Tunisia) Page 2/7
Project: pompage_amine_jessica
Variant: Nouvelle variante de simulation

PVsyst V7.2.6 ESPRIT (Tunisia)


VC0, Simulation date:
01/11/21 14:19
with v7.2.6

General parameters
Pumping PV System Deep Well to Storage

System Requirements Well characteristics Storage tank


Basic Head 15 meterW Static level depth -15.0 m Volume 6.0 m³

PVsyst classroom
Water needs Specific drawdown -20.00 m/m³/h Diameter 2.0 m
Yearly constant 5.00 m³/day Diameter 0 cm Feeding by bottom
Pump level -25.0 m Bottom Level 0.0 m
Lower dynamic level -20.0 m Height (full level) 1.9 m

Hydraulic circuit PV Field Orientation


Piping length 35 m Fixed plane
Pipes PE20 Tilt/Azimuth 15 / 0 °
Dint 22 mm

PV Array and Pump


PV module Pump
Manufacturer Generic Manufacturer Generic
Model YL240P-29b Model PS20-HR-07

PVsyst classroom
(Original PVsyst database)
Unit Nom. Power
Number of PV modules
Nominal (STC)
Modules
240

240
1

1 String x 1
Wp
Unit
Wp
In series
Pump Technology

Motor
Operating conditions

Head min.
Progressive cavity
Deep well pump
DC motor, brushless

Head Nom Head max.


At operating cond. (50°C)
Pmpp 214 Wp 5.0 30.0 40.0 m
U mpp 27 V Corresp. Flowrate 1.02 0.85 0.81 m³/h
I mpp 8.1 A Req. power 90 160 190 W

Total PV power
Nominal (STC) 0 kWp Control device
Total 1 modules Manufacturer Generic
Model PS 200
System Configuration MPPT-DC converter

PVsyst classroom
Pumping system controller
System Operating Control
Power Conditioning Unit
Type
Operating conditions
MPPT-DC converter

Nominal power 200 W


Power Threshold 5 W
Max. efficiency 95.0 %
EURO efficiency 93.5 %
Minimum MPP Voltage 24 V
Maximum MPP Voltage 60 V
Maximum Array Voltage 100 V
Maximum Input Current 0.0 A

PVsyst classroom
01/11/21 PVsyst Classroom License, ESPRIT (Tunisia) Page 3/7
Project: pompage_amine_jessica
Variant: Nouvelle variante de simulation

PVsyst V7.2.6 ESPRIT (Tunisia)


VC0, Simulation date:
01/11/21 14:19
with v7.2.6

System losses
Thermal Loss factor DC wiring losses LID - Light Induced Degradation
Module temperature according to irradiance Global array res. 55 mΩ Loss Fraction 1.3 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

PVsyst classroom
Module Quality Loss
Loss Fraction

IAM loss factor


-0.8 %

Incidence effect (IAM): User defined profile


Module mismatch losses
Loss Fraction 2.0 % at MPP
Strings Mismatch loss
Loss Fraction 0.1 %

0° 20° 40° 60° 70° 75° 80° 85° 90°


1.000 1.000 1.000 0.960 0.880 0.800 0.670 0.430 0.000

PVsyst classroom

PVsyst classroom

PVsyst classroom
01/11/21 PVsyst Classroom License, ESPRIT (Tunisia) Page 4/7
Project: pompage_amine_jessica
Variant: Nouvelle variante de simulation

PVsyst V7.2.6 ESPRIT (Tunisia)


VC0, Simulation date:
01/11/21 14:19
with v7.2.6

Main results
System Production
Water Energy Efficiencies
Water Pumped 62 m³ Energy At Pump 16 kWh System efficiency 4.4 %
Specific 150 m³/kWp/bar Specific 0.26 kWh/m³ Pump efficiency 19.2 %

PVsyst classroom
Water needs
Missing Water
1825
96.6

%
Unused (tank full)
Unused PV energy
Unused Fraction
0 kWh
0.0 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst classroom
Balances and main results

GlobEff EArrMPP E_PmpOp ETkFull H_Pump WPumped W_Used W_Miss


kWh/m² kWh kWh kWh meterW m³ m³ m³
January 86.4 19.24 1.649 0.000 17.51 6.208 9.208 145.8
February 101.4 22.38 1.662 0.000 17.70 6.550 6.550 133.4
March 143.7 31.01 0.990 0.000 17.04 3.233 3.233 151.8
April 170.6 35.69 1.765 0.000 17.45 6.567 6.567 143.4

PVsyst classroom
May
June
July
August
September
200.7
208.2
223.2
200.7
157.9
41.03
41.44
43.40
39.43
32.17
1.301
0.949
0.417
1.586
1.463
0.000
0.000
0.000
0.000
0.000
17.77
16.92
19.39
18.36
17.72
5.214
2.937
2.162
7.132
5.779
5.214
2.937
2.162
7.132
5.779
149.8
147.1
152.8
147.9
144.2
October 128.1 26.68 1.943 0.000 17.50 7.291 7.291 147.7
November 92.4 20.09 1.077 0.000 17.02 3.501 3.501 146.5
December 79.6 17.75 1.470 0.000 17.43 5.407 5.407 149.6
Year 1793.0 370.30 16.272 0.000 17.56 61.982 64.982 1760.0

Legends
GlobEff Effective Global, corr. for IAM and shadings WPumped Water volume pumped
EArrMPP Array virtual energy at MPP W_Used Water drawn by the user

PVsyst classroom
E_PmpOp Pump operating energy W_Miss Missing water
ETkFull Unused energy (tank full)
H_Pump Average total Head at pump

01/11/21 PVsyst Classroom License, ESPRIT (Tunisia) Page 5/7


Project: pompage_amine_jessica
Variant: Nouvelle variante de simulation

PVsyst V7.2.6 ESPRIT (Tunisia)


VC0, Simulation date:
01/11/21 14:19
with v7.2.6

Loss diagram
1684 kWh/m² Global horizontal irradiation
+9.3% Global incident in coll. plane

PVsyst classroom
-2.56% IAM factor on global

1793 kWh/m² * 2 m² coll. Effective irradiation on collectors

efficiency at STC = 14.76% PV conversion

429.8 kWh Array nominal energy (at STC effic.)


-0.43% PV loss due to irradiance level

-10.17% PV loss due to temperature

+0.75% Module quality loss

-1.30% LID - Light induced degradation


-2.10% Mismatch loss, modules and strings
-1.03% Ohmic wiring loss

PVsyst classroom
370.3 kWh Array virtual energy at MPP
-5.23% Converter Loss during operation (efficiency)
-0.14% Converter Loss due to power threshold
0.00% Converter Loss over nominal conv. voltage
-0.73% Converter Loss due to voltage threshold
-2.05% En. under pump producing threshold
340.8 kWh Electrical losses (converter, thresholds, overload)

PVsyst classroom
-95.22% Energy under drawdown limit

0.00% Unused energy (tank full)


16.3 kWh Operating electrical energy at pump
3.1 kWh Pump efficiency = 19.2% Hydraulic energy at pump

15.0 meterW Static head requirement (no flow)

-14.43% Well: drawdown head loss


-0.17% Friction head loss
62 m³ Aver. Head = 17.6 meterW Water volume pumped
+4.84% Stored water balancebegin/end of interval

PVsyst classroom
Missing: 1760 m³ 65 m³ supplied (3.6%of needs) User's water needs

01/11/21 PVsyst Classroom License, ESPRIT (Tunisia) Page 6/7


Project: pompage_amine_jessica
Variant: Nouvelle variante de simulation

PVsyst V7.2.6 ESPRIT (Tunisia)


VC0, Simulation date:
01/11/21 14:19
with v7.2.6

Special graphs
Diagramme d'entrée/sortie journalier

PVsyst classroom

PVsyst classroom

PVsyst classroom

PVsyst classroom
01/11/21 PVsyst Classroom License, ESPRIT (Tunisia) Page 7/7

You might also like