Professional Documents
Culture Documents
Central Police Canteen - SKPB - KKD - Project - VC0-Report-01 of 2-South Facing 13.6kWp
Central Police Canteen - SKPB - KKD - Project - VC0-Report-01 of 2-South Facing 13.6kWp
PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-South Facing Roof -Case1
PVsyst V7.4.5
VC0, Simulation date:
20/03/24 13:08
PVsyst TRIAL
with v7.4.5
Project summary
Geographical Site Situation Project settings
Varathūr Latitude 11.30 °N Albedo 0.20
India Longitude 75.82 °E
Altitude 54 m
Time zone UTC+5.5
Meteo data
Varathūr
Meteonorm 8.1 (1991-2010), Sat=100% - Synthetic
System summary
PVsyst TRIAL
Grid-Connected System Tables on a building
System information
PV Array Inverters
Nb. of modules 24 units Nb. of units 1 unit
Pnom total 13.56 kWp Pnom total 12.00 kWac
Pnom ratio 1.130
Results summary
Produced Energy 20621 kWh/year Specific production 1521 kWh/kWp/year Perf. Ratio PR 83.10 %
PVsyst TRIAL
Project and results summary
PVsyst TRIAL
PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 2/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-South Facing Roof -Case1
PVsyst V7.4.5
VC0, Simulation date:
20/03/24 13:08
PVsyst TRIAL
with v7.4.5
General parameters
Grid-Connected System Tables on a building
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Transposition Perez
Tilt/Azimuth 10 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model ASB-M10-144-565-144 half-cells bifacia-N Model SUN2000-12KTL-M2-400V
(Custom parameters definition) (Original PVsyst database)
Unit Nom. Power 565 Wp Unit Nom. Power 12.0 kWac
Number of PV modules 24 units Number of inverters 2 * MPPT 50% 1 unit
Nominal (STC) 13.56 kWp Total power 12.0 kWac
Modules 2 string x 12 In series Operating voltage 160-950 V
At operating cond. (50°C) Max. power (=>63°C) 13.2 kWac
Pmpp 12.31 kWp Pnom ratio (DC:AC) 1.13
U mpp 459 V No power sharing between MPPTs
I mpp 27 A
PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 14 kWp Total power 12 kWac
Total 24 modules Number of inverters 1 unit
Module area 62.2 m² Pnom ratio 1.13
Cell area 57.2 m²
Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 285 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
IAM loss factor
Incidence effect (IAM): Fresnel, AR coating, n(glass)=1.526, n(AR)=1.290
PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 3/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-South Facing Roof -Case1
PVsyst V7.4.5
VC0, Simulation date:
20/03/24 13:08
PVsyst TRIAL
with v7.4.5
PVsyst TRIAL
Iso-shadings diagram
Orientation #1
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 4/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-South Facing Roof -Case1
PVsyst V7.4.5
VC0, Simulation date:
20/03/24 13:08
PVsyst TRIAL
with v7.4.5
Main results
System Production
Produced Energy 20621 kWh/year Specific production 1521 kWh/kWp/year
Perf. Ratio PR 83.10 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
February 157.9 71.79 27.78 167.9 164.4 1924 1882 0.827
March 178.5 88.13 29.73 182.8 179.0 2078 2032 0.820
April 172.1 90.75 30.30 170.6 166.9 1940 1895 0.819
May 163.5 90.08 30.19 158.0 154.2 1807 1763 0.823
June 122.3 78.15 27.29 117.2 113.9 1366 1331 0.837
July 121.1 89.66 26.80 117.0 113.5 1377 1342 0.846
August 130.8 86.11 26.42 128.4 124.9 1501 1465 0.841
September 145.9 80.66 26.53 146.9 143.2 1705 1666 0.836
October 145.7 83.65 26.94 151.4 147.9 1755 1714 0.835
November 143.1 67.13 26.82 154.1 150.9 1783 1742 0.833
December 145.8 68.43 26.65 160.5 156.7 1859 1817 0.835
Year 1786.1 954.89 27.65 1830.0 1786.9 21111 20621 0.831
PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 5/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-South Facing Roof -Case1
PVsyst V7.4.5
VC0, Simulation date:
20/03/24 13:08
PVsyst TRIAL
with v7.4.5
Loss diagram
1786 kWh/m² Global horizontal irradiation
+2.5% Global incident in coll. plane
PVsyst TRIAL
24250 kWh Array nominal energy (at STC effic.)
-0.65% PV loss due to irradiance level
PVsyst TRIAL
0.00% Inverter Loss over nominal inv. voltage
-0.03% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
-0.12% Night consumption
20621 kWh Available Energy at Inverter Output
20621 kWh Energy injected into grid
PVsyst TRIAL
PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 6/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-South Facing Roof -Case1
PVsyst V7.4.5
VC0, Simulation date:
20/03/24 13:08
PVsyst TRIAL
with v7.4.5
Predef. graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 7/8
PVsyst V7.4.5
PVsyst TRIAL
VC0, Simulation date:
20/03/24 13:08
with v7.4.5
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL