You are on page 1of 8

Version 7.4.

PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System

Project: Central Police Canteen_SKPB_KKD


Variant: New simulation variant-North Facing Roof -Case2
Tables on a building
System power: 13.56 kWp

PVsyst TRIAL Varathūr - India

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-North Facing Roof -Case2

PVsyst V7.4.5
VC2, Simulation date:
20/03/24 13:41

PVsyst TRIAL
with v7.4.5

Project summary
Geographical Site Situation Project settings
Varathūr Latitude 11.30 °N Albedo 0.20
India Longitude 75.82 °E
Altitude 54 m
Time zone UTC+5.5

Meteo data
Varathūr
Meteonorm 8.1 (1991-2010), Sat=100% - Synthetic

System summary

PVsyst TRIAL
Grid-Connected System Tables on a building

PV Field Orientation Near Shadings User's needs


Fixed plane Linear shadings : Fast (table) Unlimited load (grid)
Tilt/Azimuth 10 / 180 °

System information
PV Array Inverters
Nb. of modules 24 units Nb. of units 1 unit
Pnom total 13.56 kWp Pnom total 12.00 kWac
Pnom ratio 1.130

Results summary
Produced Energy 19347.53 kWh/year Specific production 1427 kWh/kWp/year Perf. Ratio PR 83.22 %

PVsyst TRIAL
Project and results summary

Near shading definition - Iso-shadings diagram


Main results
Loss diagram
Table of contents

General parameters, PV Array Characteristics, System losses


2
3
4
5
6
Predef. graphs 7
Single-line diagram 8

PVsyst TRIAL

PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 2/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-North Facing Roof -Case2

PVsyst V7.4.5
VC2, Simulation date:
20/03/24 13:41

PVsyst TRIAL
with v7.4.5

General parameters
Grid-Connected System Tables on a building

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Transposition Perez
Tilt/Azimuth 10 / 180 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon Linear shadings : Fast (table) Unlimited load (grid)

PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model ASB-M10-144-565-144 half-cells bifacia-N Model SUN2000-12KTL-M2-400V
(Custom parameters definition) (Original PVsyst database)
Unit Nom. Power 565 Wp Unit Nom. Power 12.0 kWac
Number of PV modules 24 units Number of inverters 2 * MPPT 50% 1 unit
Nominal (STC) 13.56 kWp Total power 12.0 kWac
Modules 2 string x 12 In series Operating voltage 160-950 V
At operating cond. (50°C) Max. power (=>63°C) 13.2 kWac
Pmpp 12.31 kWp Pnom ratio (DC:AC) 1.13
U mpp 459 V No power sharing between MPPTs
I mpp 27 A

PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 14 kWp Total power 12 kWac
Total 24 modules Number of inverters 1 unit
Module area 62.2 m² Pnom ratio 1.13
Cell area 57.2 m²

Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 285 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses


Loss Fraction 2.0 % at MPP

PVsyst TRIAL
IAM loss factor
Incidence effect (IAM): Fresnel, AR coating, n(glass)=1.526, n(AR)=1.290

0° 30° 50° 60° 70° 75° 80° 85° 90°


1.000 0.999 0.987 0.962 0.892 0.816 0.681 0.440 0.000

PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 3/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-North Facing Roof -Case2

PVsyst V7.4.5
VC2, Simulation date:
20/03/24 13:41

PVsyst TRIAL
with v7.4.5

Near shadings parameter


Perspective of the PV-field and surrounding shading scene

PVsyst TRIAL
Iso-shadings diagram
Orientation #1

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 4/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-North Facing Roof -Case2

PVsyst V7.4.5
VC2, Simulation date:
20/03/24 13:41

PVsyst TRIAL
with v7.4.5

Main results
System Production
Produced Energy 19347.53 kWh/year Specific production 1427 kWh/kWp/year
Perf. Ratio PR 83.22 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio
January 159.4 60.34 26.44 141.5 136.0 1629 1591 0.830

PVsyst TRIAL
February 157.9 71.79 27.78 146.0 141.6 1680 1642 0.830
March 178.5 88.13 29.73 171.6 167.4 1959 1915 0.823
April 172.1 90.75 30.30 171.0 167.4 1949 1904 0.821
May 163.5 90.08 30.19 166.7 163.3 1907 1861 0.823
June 122.3 78.15 27.29 125.0 122.1 1457 1420 0.837
July 121.1 89.66 26.80 122.7 119.5 1445 1409 0.847
August 130.8 86.11 26.42 130.5 127.2 1528 1491 0.843
September 145.9 80.66 26.53 142.4 138.6 1657 1618 0.838
October 145.7 83.65 26.94 137.8 133.7 1602 1564 0.837
November 143.1 67.13 26.82 129.9 125.4 1505 1469 0.834
December 145.8 68.43 26.65 129.5 124.2 1497 1461 0.833
Year 1786.1 954.89 27.65 1714.5 1666.4 19813 19348 0.832

PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 5/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-North Facing Roof -Case2

PVsyst V7.4.5
VC2, Simulation date:
20/03/24 13:41

PVsyst TRIAL
with v7.4.5

Loss diagram
1786 kWh/m² Global horizontal irradiation

-4.01% Global incident in coll. plane


-0.02% Near Shadings: irradiance loss

-2.79% IAM factor on global

1666 kWh/m² * 62 m² coll. Effective irradiation on collectors

efficiency at STC = 21.82% PV conversion

22614 kWh Array nominal energy (at STC effic.)

PVsyst TRIAL
-0.75% PV loss due to irradiance level

-9.74% PV loss due to temperature

+0.75% Module quality loss

-2.00% Module array mismatch loss

-0.95% Ohmic wiring loss


19813 kWh Array virtual energy at MPP
-2.19% Inverter Loss during operation (efficiency)
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage

PVsyst TRIAL 19348 kWh


19348 kWh
-0.03%
0.00%
-0.13%
Inverter Loss due to power threshold
Inverter Loss due to voltage threshold
Night consumption
Available Energy at Inverter Output
Energy injected into grid

PVsyst TRIAL

PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 6/8
Project: Central Police Canteen_SKPB_KKD
Variant: New simulation variant-North Facing Roof -Case2

PVsyst V7.4.5
VC2, Simulation date:
20/03/24 13:41

PVsyst TRIAL
with v7.4.5

Predef. graphs
Daily Input/Output diagram

PVsyst TRIAL

PVsyst TRIAL System Output Power Distribution

PVsyst TRIAL

PVsyst TRIAL
20/03/24 PVsyst Evaluation mode Page 7/8
PVsyst V7.4.5

PVsyst TRIAL
VC2, Simulation date:
20/03/24 13:41
with v7.4.5

PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL

You might also like