Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-S-2303

Project Name Date: 24 Feb 2011


Contract Number Page 1 of 4
Revision 1

SPECIFICATION – NONSHRINK CEMENTITIOUS GROUT

This specification has been revised as indicated below and described in the revision record on the following
page. Please destroy all previous revisions.

Revision Date Originator's Reviewed/Checked By Pages


No. Name & Initials Name & Initials
A 9/2/2010 Brooke Shondelmyer 4
0 11/10/2010 Brooke Shondelmyer Greg Luttrull 4
1 2/24/2011 Brooke Shondelmyer Greg Luttrull 4

APPROVALS SIGNATURES DATE

Lead Engineer Greg Luttrull 2/24/2011


Project Engineering
Manager: Ed Haney 2/24/2011
Client Approval:

ISSUED FOR : Construction X Other Approved


Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-S-2303
Project Name Date: 24 Feb 2011
Contract Number Page 2 of 4
Revision 1

SPECIFICATION – NONSHRINK CEMENTITIOUS GROUT

Record of Revisions
Revision Date Description
No.

A 9/2/2010 Issued for Approval, Table of Contents Only

0 11/10/2010 Issued for Review/Approval

1 2/24/2011 Issued Approved


Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-S-2303
Project Name Date: 24 Feb 2011
Contract Number Page 3 of 4
Revision 1

SPECIFICATION – NONSHRINK CEMENTITIOUS GROUT

Scope

PIP STS03600, Nonshrink Cementitious Grout Specification, dated July 2008, is adopted for project use with
the following modifications noted in this addendum.

Modifications to the Original Specification

The following requirements are defined as additions, deletions, and revisions to PIP STS03600.

Section Description

N/A N/A
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-S-2303
Project Name Date: 24 Feb 2011
Contract Number Page 4 of 4
Revision 1

SPECIFICATION – NONSHRINK CEMENTITIOUS GROUT

PIP STS03600
Non Shrink Cementitious Grout

TABLE OF CONTENTS

1. INTRODUCTION ...................................................................................................................................... 2
1.1 Purpose.......................................................................................................................................... 2
1.2 Scope.............................................................................................................................................. 2
2. REFERENCES ........................................................................................................................................... 2
2.1 Industry Codes and Standards................................................................................................... 2
2.2 Government Regulations ............................................................................................................ 2
3. DEFINITIONS............................................................................................................................................ 2

4. REQUIREMENTS ..................................................................................................................................... 3
4.1 General .......................................................................................................................................... 3
4.2 Field Quality Control of Grout .................................................................................................. 3
4.3 Testing ........................................................................................................................................... 3
4.4 Submittals ..................................................................................................................................... 4
4.5 Safety ............................................................................................................................................. 4
4.6 Materials ....................................................................................................................................... 5
4.7 Preparation for Grouting............................................................................................................ 5
4.8 Installation of Grout .................................................................................................................... 6
4.9 Curing............................................................................................................................................ 7